Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...is seeking move-in ready / second-generation office space requiring minimal construction. This is ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 6/08/2026
...requirements, as well as costs likely to be incurred through relocating, such as ...
DEPT OF DEFENSE
Bid Due: 6/13/2026