| Location: | Washington |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...in the channel. The project includes installation of new storm top hat/saddle pipe ...
City of Kent
Bid Due: 6/09/2026
...of roadway fill and slide debris, installing a pipe in the drainage trench, ...
State Government of Washington
Bid Due: 6/24/2026
...Installation for the Port Hadlock Urban Growth Area (PHUGA) COUNTY PROJECT NO. 4052128-0 ...
Jefferson County
Bid Due: 6/05/2026
...of roadway fill and slide debris, installing a pipe in the drainage trench, ...
State Government of Washington
Bid Due: 6/24/2026