USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION

Location: California
Posted: Jun 27, 2026
Due: Jul 1, 2026
Agency: HOMELAND SECURITY, DEPARTMENT OF
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: 70Z8526Q025799
Publication URL: To access bid details, please log in.
Follow
USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION
Active
Contract Opportunity
Notice ID
70Z8526Q025799
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)
General Information View Changes
  • Contract Opportunity Type: Special Notice (Updated)
  • Updated Published Date: Jun 27, 2026 08:45 am PDT
  • Original Published Date: Jun 26, 2026 10:37 am PDT
  • Updated Response Date: Jul 01, 2026 08:00 am PDT
  • Original Response Date: Jul 01, 2026 08:00 am PDT
  • Inactive Policy: 15 days after response date
  • Updated Inactive Date: Jul 16, 2026
  • Original Inactive Date: Jul 16, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: 8(a) Set-Aside (FAR 19.8)
  • Updated Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
  • NAICS Code:
    • 336611 - Ship Building and Repairing
  • Place of Performance:
    CA 94501
    USA
Description View Changes

Mofification 1 to this solicitation was to correct the POP in the attached SOW.



Correct: period of performance for this contract shall be between 01JUL2026 & 15JUL26.





STATEMENT OF WORK (SOW)



FOR



GAS TURBINE BLEED AIR HOSE INSULATION





CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).







1.0 GENERAL








    1. Background





USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.








    1. Scope





The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.








    1. OBJECTIVE





The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.








    1. APPLICABLE DOCUMENTS












      1. Reference Documents







The following documents may be helpful to the Contractor in performing the work described in this document:





Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)



Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210






  1. SPECIFIC REQUIREMENTS/TASKS





Existing insulation cover dimensions are as follows:







Length



Width



Thickness



Inner Layer



34”



22”



2”



Outer Layer



45”



28”



2”





Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.





3.0 OTHER APPLICABLE CONDITIONS





3.1 Period of Performance



-



The period of performance for this contract shall be between 01JUL2026 & 15JUL26.





3.2 PLACE OF PERFORMANCE





The primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501





4.0 CONTRACTOR FURNISHED PROPERTY



The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.





5.0 Points of Contact



USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil





6.0 Imagery



Outer Lagging Inner Lagging




Attachments/Links
Contact Information
Contracting Office Address
  • COAST GUARD ISLAND, BLDG 50-7
  • ALAMEDA , CA 94501
  • USA
Primary Point of Contact
Secondary Point of Contact
History
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Coast Guard Southwest District Electronic Security Systems (ESS) Modernization Active... Contract Opportunity ...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 7/30/2026

...561612: Security Guards and Patrol Services Administrative and Support and Waste Management... 90911 ...

City of Los Angeles

Bid Due: 7/29/2026

...Follow Barracks Door Replacement on Coast Guard Island Active Contract Opportunity Notice ID... ...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 8/07/2026

...Related Notice Department/Ind. Agency HOMELAND SECURITY, DEPARTMENT OF Sub-tier US COAST GUARD... at ...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 7/21/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.