Addendum No. 1 RE: Contract # C205222 WBS # 34165.3.8 STATE FUNDED Buncombe County (I-2513AC) I-26/I-240 FROM NORTH OF I-40 TO SR-3548 (HAYWOOD RD)

Location: North Carolina
Posted: Oct 8, 2026
Due: Nov 17, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • F - Natural Resources and Conservation Services
Publication URL: To access bid details, please log in.
  • Addendum
  • Attachment Preview

    Page No. Revision
    Proposal Cover Note added that reads "Includes Addendum No. 1 Dated 10-8-2026".
    GT-11.1 thru 11.18 The UNIT PROJECT SPECIAL PROVISION entitled DRILLED PIERS has been revised.

    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    JOSH STEIN DANIEL H. JOHNSON
    GOVERNOR SECRETARY
    October 8, 2026
    Addendum No. 1
    RE: Contract # C205222
    WBS # 34165.3.8
    STATE FUNDED
    Buncombe County (I-2513AC)
    I-26/I-240 FROM NORTH OF I-40 TO SR-3548 (HAYWOOD RD)
    November 17, 2026 Letting
    To Whom It May Concern:
    Reference is made to the plans and proposal furnished to you on this project.
    The following revisions have been made to the proposal.
    Page No. Revision
    Note added that reads
    Proposal Cover
    "Includes Addendum No. 1 Dated 10-8-2026".
    The UNIT PROJECT SPECIAL PROVISION entitled
    GT-11.1 thru 11.18
    DRILLED PIERS has been revised.
    Please void the above listed existing pages in your proposal and staple the revised pages
    thereto.
    Sincerely,
    Jon Weathersbee, PE
    State Contract Officer
    JHW/jcm
    Attachments
    cc: Mr. Troy B. Brooks, PE Mr. Forrest Dungan, PE
    Mr. Tim Anderson, PE Ms. Jaci Kincaid
    Mailing Address: Telephone: (919) 707-6900 Location:
    NC DEPARTMENT OF TRANSPORTATION Fax: (919) 250-4127 1020 BIRCH RIDGE DR.
    CONTRACT STANDARDS AND DEVELOPMENT Customer Service: 1-877-368-4968 RALEIGH, NC 27610
    1591 MAIL SERVICE CENTER
    RALEIGH, NC 27699-1591
    Website: www.ncdot.gov

    C205222 (I-2513AC) Buncombe County
    Mr. Ken Kennedy, PE Mr. Josh Sellers, PE
    Mr. Malcolm Bell Project File (2)

    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    RALEIGH, N.C.
    PROPOSAL
    INCLUDES ADDENDUM No.1 DATED 10-8-2026
    Nov 17, 2026 AT 02:00 PM
    DATE AND TIME OF BID OPENING:
    CONTRACT ID C205222
    WBS 34165.3.8
    FEDERAL-AID NO. STATE FUNDED
    COUNTY BUNCOMBE
    T.I.P NO. I-2513AC
    MILES 1.742
    ROUTE NO. I-26/240
    LOCATION I-26/I-240 FROM NORTH OF I-40 TO SR-3548 (HAYWOOD RD).
    TYPE OF WORK GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES.
    NOTICE:
    ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE OF GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
    GENERAL STATUTES OF NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING BOARD FOR CONTRACTORS WHEN BIDDING
    ON ANY NON-FEDERAL AID PROJECT WHERE THE BID IS $40,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY THE LICENSING BOARD.
    BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR CONDITIONING
    AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS
    ON BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH
    CAROLINA FOR LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
    BIDS WILL BE RECEIVED AS SHOWN BELOW:
    THIS IS A ROADWAY & STRUCTURE PROPOSAL
    5% BID BOND OR BID DEPOSIT REQUIRED

    GT-#11.1
    I-2513AC BUNCOMBE COUNTY
    DRILLED PIERS:
    (11-17-26)
    Revise the Standard Specifications as follows:
    Replace Section 411 with the following:
    SECTION 411
    DRILLED PIERS
    411-1 DESCRIPTION
    Construct drilled piers consisting of CIP reinforced concrete cylindrical sections in excavated
    holes typically stabilized with casings or slurry. Provide permanent casings, standard penetration
    tests, integrity testing and assistance with the shaft inspection device as noted in the plans.
    Construct drilled piers with the required resistances and dimensions in accordance with the
    contract and accepted submittals. Use a prequalified Drilled Pier Contractor to construct drilled
    piers.
    Define "excavation" and "hole" as a drilled pier excavation and "pier" as a drilled pier. Define
    "permanent casing" as a casing that remains in the excavation and acts as a form for Drilled Pier
    concrete and "temporary casing" as any casing that is not permanent. Define "rock" as a
    continuous intact natural material with a standard penetration resistance of 0.1 foot or less per 60
    blows or a rock auger penetration rate of less than 2 inches per 5 minutes of drilling at full crowd
    force or as determined by the Engineer when rock is not encountered as expected based on these
    criteria. This definition excludes discontinuous loose natural materials such as boulders and
    man-made materials such as concrete, steel, timber, etc. and is not for measurement and payment
    purposes. See Article 411-7 for measurement and payment of drilled piers.
    411-2 MATERIALS
    Refer to Division 10.
    Item Section
    Grout, Type 2 1003
    Portland Cement Concrete, Class Drilled Pier 1000
    Reinforcing Steel 1070
    Provide Type 3 material certifications in accordance with Article 106-3 for permanent casings
    and roller, chair, steel pipe and cap materials. Store steel materials on blocking at least 12 inches
    above the ground and protect it at all times from damage; and when placing in the work make
    sure it is free from dirt, dust, loose mill scale, loose rust, paint, oil or other foreign materials.
    Load, transport, unload and store drilled pier materials so materials are kept clean and free of
    damage.
    (A) Steel Casing
    Define "casing" as a temporary or permanent casing. If permanent casing is required for
    an excavation, the largest diameter casing in the hole is the permanent casing. This does
    not apply to working casings around permanent casings as approved by the Engineer.

    Casing Diameter Nominal Wall Thickness
    < 48" 0.375"
    48" - 78" 0.500"
    > 78" 0.625"
    Property ANSI/API RPB 13B-1 Requirement
    DensityC (Mud Weight) Section 4 Mud Balance 64.3 - 72.0 pcf
    Viscosity Section 6.2 Marsh Funnel 28 - 50 sec/qt
    Sand Content Section 9 4 %D
    2 %E
    pH Section 11 Glass Electrode pH MeterF 8 - 11

    GT-#11.2
    I-2513AC BUNCOMBE COUNTY
    Use smooth non-corrugated clean watertight steel casings of ample strength to withstand
    handling and installation stresses and pressures imposed by concrete, earth, backfill and
    fluids.
    (1) Temporary Casings
    Provide temporary casings with a nominal wall thickness of at least 0.375 inch
    and an outside diameter equal to or larger than the design pier diameter for which
    temporary casing is used.
    (2) Permanent Casings
    Use permanent casings with a yield strength of at least 36 ksi and a nominal wall
    thickness that meets Table 411-1.
    TABLE 411-1
    MINIMUM PERMANENT CASING WALL THICKNESS
    Casing Diameter Nominal Wall Thickness
    < 48" 0.375"
    48" - 78" 0.500"
    > 78" 0.625"
    Provide permanent casings with an outside diameter equal to the design pier
    diameter for which permanent casing is used unless larger diameter permanent
    casings are approved by the Engineer.
    (B) Slurry
    Define "slurry" as bentonite or polymer slurry. Mix bentonite clay or synthetic polymer
    with water to make bentonite or polymer slurry.
    (1) Bentonite Slurry
    Provide bentonite slurry that meets Table 411-2.
    TABLE 411-2
    BENTONITE SLURRY REQUIREMENTSA
    Property ANSI/API RPB 13B-1 Requirement
    DensityC Section 4
    64.3 - 72.0 pcf
    (Mud Weight) Mud Balance
    Section 6.2
    Viscosity 28 - 50 sec/qt
    Marsh Funnel
    Sand Content Section 9 4 %D
    2 %E
    Section 11
    pH 8 - 11
    Glass Electrode pH MeterF
    A. Slurry temperature of at least 40 degreesF required
    B. American National Standards Institute/American Petroleum Institute Recommended
    Practice
    C. Increase density requirements by 2 pcf in saltwater
    D. In tanks before pumping slurry into excavations

    GT-#11.3
    I-2513AC BUNCOMBE COUNTY
    E. In excavations immediately before placing concrete
    F. pH paper is also acceptable for measuring pH
    (2) Polymer Slurry
    Use polymer slurry products qualified by the Department. Provide polymer slurry
    with density, viscosity, sand content and pH properties that meet the product
    requirements. The polymer slurry QPL with the property requirements for each
    qualified polymer slurry product is available on the Geotechnical Engineering
    Unit's website.
    (C) Rollers and Chairs
    Use rollers and chairs that are non-metallic and resistant to corrosion and degradation.
    Provide rollers with the necessary dimensions to maintain the minimum required concrete
    cover shown in the plans and center rebar cages within excavations. Use chairs of
    sufficient strength to support rebar cages in excavations and of the size necessary to raise
    cages off bottom of holes to maintain the minimum required distance shown in the plans.
    (D) Steel Pipes and Caps
    Use Schedule 40 black steel pipes for access tubes for crosshole sonic logging (CSL).
    Provide CSL tubes with an inside diameter of at least 1.5 inches. Use CSL tubes with a
    round, regular inside diameter free of defects and obstructions, including any pipe joints,
    in order to permit free, unobstructed passage of probes for CSL testing. Provide
    watertight CSL tubes free of corrosion with clean internal and external faces to ensure a
    good bond between concrete and tubes. Fit CSL tubes with watertight plastic caps on the
    bottom and removable caps on top.
    (E) Drilled Pier Concrete
    Use drilled pier concrete material meeting the requirements of Section 1000, except as
    modified below:
    (1) Supplementary Cementitious Materials (SCMs)
    Add SCMs to reduce peak concrete hydration temperature, improve thermal
    performance, and mitigate risk of thermal cracking in Drilled Pier Concrete in
    accordance with Table 411-3. Use any one or combination of the SCMs that
    satisfies the required minimum dosages below:
    (a) 25% Class F fly ash that meets ASTM C618
    (b) 35% Class C fly ash that meets ASTM C618
    (c) 35% slag cement that meets ASTM C989/C989M
    (d) 5% silica fume that meets ASTM C1240 with 25% slag cement
    (e) 5% silica fume that meets ASTM C1240 with 20% Class F fly ash that
    meets ASTM C618
    Use SCMs found on the Department's approved producer/supplier list. Concrete
    mixtures containing high alkali cements must also utilize the appropriate SCMs and
    minimum substitution rates provided in Article 1024-1.

    D Drilled Pier DiameterA (ft) SCMs Required? (Yes/No) Max ECC (lb/cy) Max Temp with SCMsC ( degreesF) Max Temp without SCMs ( degreesF) Temp Prediction Required? (Yes/No) Temp Monitoring Required? (Yes/No)
    D < 5 No N/A 185 158 No No
    5 D < 6 Yes 625 N/A No Yes
    D 6 Yes B N/A Yes Yes

    GT-#11.4
    I-2513AC BUNCOMBE COUNTY
    (2) Equivalent Cement Content (ECC)
    Determine the ECC on a per cubic yard basis with the following formula:
    ECC= 1.0(PC) + 0.5(FAF) + 0.8(FAC) + 1.2(SF) + 1.0(SC)
    Where:
    PC = Portland cement
    FAF = Class F fly ash
    FAC = Class C fly ash
    SF = Silica fume
    SC = Slag cement
    All units are in pounds per cubic yard.
    ECC shall meet the requirements of Table 411-3 unless otherwise supported by a
    temperature prediction model in accordance with Subarticle 411-2(E)(3)(b).
    (3) Thermal Control
    (a) Use appropriate thermal control measures to reduce the peak concrete hydration
    temperature in Drilled Pier Concrete. Methods for controlling concrete
    temperature may include, but are not limited to, the following:
    (i) Selecting constituent materials that minimize the heat generated by concrete
    hydration.
    (ii) Cooling constituent materials to reduce the temperature of concrete in its
    plastic state.
    (iii) Controlling the rate of concrete placement.
    (iv) Other methods proposed by the Contractor and approved by the Engineer.
    At a minimum, provide thermal control for Drilled Pier Concrete in accordance
    with Table 411-3.
    TABLE 411-3
    THERMAL CONTROL REQUIREMENTS FOR DRILLED PIER CONCRETE
    D SCMs Max Max Temp Max Temp Temp
    Drilled Required? ECC with Temp Prediction Monitoring
    Pier (Yes/No) (lb/cy) SCMsC ( degreesF) without Required? Required?
    DiameterA SCMs (Yes/No) (Yes/No)
    (ft) ( degreesF)
    D < 5 No N/A 158 No No
    5 D < 6 Yes 625 185 N/A No Yes
    D 6 Yes B N/A Yes Yes
    A. Drilled pier diameter is the largest constructed diameter for any portion of a pier.
    B. As determined by temperature prediction model
    C. For a list of SCM's allowed see Subarticle 411-2(E)(1)

    GT-#11.5
    I-2513AC BUNCOMBE COUNTY
    (b) Temperature Prediction
    Use the Schmidt Method or numerical thermal modeling as described in
    Concrete: Microstructure, Properties, and Materials by Mehta and Monteiro
    (2014) or other method approved by the Engineer to predict concrete
    hydration temperature. Temperature predictions are required for each Drilled
    Pier Concrete mix design with a different drilled pier condition. Variations in
    constructed drilled pier diameter or drilled piers with permanent steel casing
    are considered different drilled pier conditions. Submit temperature
    prediction results and any planned thermal control measures at least 30 days
    before beginning Drilled Pier Concrete placement.
    (c) Temperature Monitoring
    Monitor concrete hydration temperature for the first drilled pier constructed
    with each Drilled Pier Concrete mix with a different drilled pier condition as
    described in Subarticle 411-2(E)(3)(b). Measure temperature at the center of
    the drilled pier diameter using two redundant thermal sensors inserted at least
    1.5 x pier diameters below the top of pier and in accordance with ASTM
    D7949, Method B. Begin recording temperature data to the nearest one-
    degree Fahrenheit immediately after completing concrete placement. Record
    temperatures using an hour or smaller interval of time. Continue recording
    temperatures until at least 24 hours after the peak temperature has passed. If a
    temperature limit is exceeded, continue monitoring until all temperature
    values fall below the specified limit, even if the 24-hour requirement has been
    met. Submit temperature monitoring data within 24 hours after completing
    monitoring and before placing another drilled pier under the same conditions.
    If temperature limits are exceeded during monitoring, submit a revised
    thermal control plan including but not limited to revised concrete mix designs,
    lower concrete placement temperature, or other modifications proposed by the
    contractor for review by the Engineer. Do not place additional drilled piers
    under the same conditions until the revised thermal control plan has been
    reviewed by the Engineer. Drilled piers that exceed the temperature limits
    established in Table 411-3 are considered unacceptable unless the Contractor
    demonstrates through an engineering analysis that the drilled pier is
    acceptable to the Engineer.
    (d) Concrete Placement Temperature
    For drilled piers with constructed diameters of 5 feet or greater, maintain
    concrete temperature at time of placement between 40 degreesF and 75 degreesF. Placement
    temperatures up to 85 degreesF may be permitted when supported by temperature
    prediction or monitoring as specified in Subarticle 411-2(E)(3)(b) and (c).
    When placement temperatures above 75 degreesF are permitted based on temperature
    monitoring, continue monitoring subsequent drilled piers until monitoring
    demonstrates that the maximum temperature specified in Table 411-3 will not
    be exceeded at the higher placement temperature.

    GT-#11.6
    I-2513AC BUNCOMBE COUNTY
    (4) Concrete Slump Loss
    Place concrete within the slump requirements listed in Table 1000-1 and maintain
    a minimum slump of 5 inches throughout the elapsed time. The elapsed time for
    placing drilled shaft concrete includes the concrete mixing and transit time, the
    concrete placement time, and the time required to remove any tremies, temporary
    casings, etc. Include the estimated elapsed time for concrete placement in the
    drilled shaft installation plan.
    For drilled piers with a theoretical concrete volume of 75 cubic yards or more and
    an estimated elapsed time greater than 2 hours, perform a field slump loss test.
    Perform the slump loss test in accordance with the procedure posted on the
    NCDOT Materials and Tests Unit website and demonstrate to the Engineer,
    before drilled pier concrete placement, that the concrete will maintain a slump of
    5 inches or greater for the estimated elapsed time. Place concrete if it's
    temperature at the time of placement into the drilled pier is no more than 10 degreesF
    higher than the slump loss test temperature. Use ice or other concrete-cooling
    ingredients to lower concrete temperature or run additional slump loss tests at the
    higher temperatures.
    411-3 PRECONSTRUCTION REQUIREMENTS
    (A) Drilled Pier Construction Plan
    Submit the proposed drilled pier construction plan for all drilled piers for acceptance by
    the Engineer. Provide an electronic copy of this plan at least 30 days before starting
    drilled pier construction. Do not begin drilled pier construction until a construction plan
    is accepted by the Engineer. Provide detailed project specific information in the drilled
    pier construction plan that includes the following:
    (1) Overall description and sequence of drilled pier construction;
    (2) List and sizes of equipment including cranes, drill rigs, vibratory and downhole
    hammers, Kelly bars, augers, core barrels, casings (diameters, thicknesses and
    lengths), cleanout buckets, air lifts, pumps, slurry equipment, tremies, pump pipes
    and other equipment;
    (3) Procedures for casing installation and temporary casing removal including how
    telescoping temporary casings will be removed;
    (4) If applicable, details of slurry testing and use including intended purpose, product
    information and additives, manufacturer's recommendations for use, name and
    contact information for slurry manufacturer's technical representative, mixing and
    handling procedures and how slurry level will be maintained above the highest
    piezometric head;
    (5) Methods for drilling and cleaning holes including how cores will be removed and
    drilling spoils and slurry will be handled and disposed of;

    GT-#11.7
    I-2513AC BUNCOMBE COUNTY
    (6) Details of CSL tubes, caps and joints including pipe size and how tubes will be
    attached to reinforcing steel;
    (7) Procedures for lifting and setting reinforcing steel including how rebar cages will
    be supported and centralized;
    (8) Procedures for placing concrete including how tremies and pump pipes will be
    controlled and contaminated concrete will be contained;
    (9) Concrete mix design that meets Section 1000;
    (10) Approved packaged grout or grout mix design that meets Section 1003;
    (11) CSL Consultant including Field and Project Engineer; and
    (12) Other information shown in the plans or requested by the Engineer.
    If alternate construction procedures are proposed or necessary, a revised drilled pier
    construction plan submittal may be required. If the work deviates from the accepted
    submittal without prior approval, the Engineer may suspend drilled pier construction until
    a revised plan is accepted by the Engineer.
    (B) Preconstruction Meeting
    Before starting drilled pier construction, hold a drilled pier preconstruction meeting to
    discuss the installation, monitoring and inspection of the drilled piers. Schedule this
    drilled pier preconstruction meeting with the Engineer after the Drilled Pier Contractor
    mobilizes to the site. If this meeting occurs before all drilled pier submittals have been
    accepted by the Engineer, additional drilled pier preconstruction meetings may be
    required before beginning construction of drilled piers without accepted submittals. The
    Prime Contractor and Drilled Pier Contractor Superintendent shall attend the drilled pier
    preconstruction meetings.
    411-4 CONSTRUCTION METHODS
    Do not excavate holes, install piles or allow equipment loads or vibrations within 20 feet of
    completed piers until 16 hours after drilled pier concrete reaches initial set.
    When drilling from a barge, use a fixed template that maintains hole position and alignment
    during drilled pier construction. Do not use floating templates or templates attached to barges.
    Check for correct drilled pier alignment and location before beginning drilling. Check
    plumbness of Kelly bars before beginning and frequently during drilling.
    For drilled piers constructed with slurry or permanent casings, the pier diameter may be 2 inches
    less than the design pier diameter shown in the plans. For all other drilled piers, construct piers
    with the minimum required diameters shown in the plans except for portions of drilled piers in
    rock which may be 2 inches less than the design pier diameter.
    Install drilled piers with tip elevations no higher than shown in the plans or approved by the
    Engineer. Provide piers with the minimum required tip resistance and, when noted in the plans,
    penetration into rock.
    (A) Excavation

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Follow Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Active

    VETERANS AFFAIRS, DEPARTMENT OF

    Bid Due: 12/09/2026

    Solicitation Number: 354-UT27-12 Project Title: Request for Qualifications - Master Plan & Rerating

    State Government of North Carolina

    Bid Due: 11/18/2026

    Solicitation Number: 322-MAINT092926 Project Title: RFB FOR PARKING LOT PATCHING, SEALCOATING, AND RESTRIPING

    State Government of North Carolina

    Bid Due: 12/10/2026

    Solicitation Number: 274-HCD-FY27-6 Project Title: FY 2027-2028 Community Enhancement Grant Description: FY 2027-2028

    State Government of North Carolina

    Bid Due: 11/23/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.