| Location: | North Carolina |
|---|---|
| Posted: | Oct 8, 2026 |
| Due: | Nov 17, 2026 |
| Agency: | Division of Highways |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Page No. | Revision |
|---|---|
| Proposal Cover | Note added that reads "Includes Addendum No. 1 Dated 10-8-2026". |
| GT-11.1 thru 11.18 | The UNIT PROJECT SPECIAL PROVISION entitled DRILLED PIERS has been revised. |
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN DANIEL H. JOHNSON
GOVERNOR SECRETARY
October 8, 2026
Addendum No. 1
RE: Contract # C205222
WBS # 34165.3.8
STATE FUNDED
Buncombe County (I-2513AC)
I-26/I-240 FROM NORTH OF I-40 TO SR-3548 (HAYWOOD RD)
November 17, 2026 Letting
To Whom It May Concern:
Reference is made to the plans and proposal furnished to you on this project.
The following revisions have been made to the proposal.
Page No. Revision
Note added that reads
Proposal Cover
"Includes Addendum No. 1 Dated 10-8-2026".
The UNIT PROJECT SPECIAL PROVISION entitled
GT-11.1 thru 11.18
DRILLED PIERS has been revised.
Please void the above listed existing pages in your proposal and staple the revised pages
thereto.
Sincerely,
Jon Weathersbee, PE
State Contract Officer
JHW/jcm
Attachments
cc: Mr. Troy B. Brooks, PE Mr. Forrest Dungan, PE
Mr. Tim Anderson, PE Ms. Jaci Kincaid
Mailing Address: Telephone: (919) 707-6900 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 250-4127 1020 BIRCH RIDGE DR.
CONTRACT STANDARDS AND DEVELOPMENT Customer Service: 1-877-368-4968 RALEIGH, NC 27610
1591 MAIL SERVICE CENTER
RALEIGH, NC 27699-1591
Website: www.ncdot.gov
C205222 (I-2513AC) Buncombe County
Mr. Ken Kennedy, PE Mr. Josh Sellers, PE
Mr. Malcolm Bell Project File (2)
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH, N.C.
PROPOSAL
INCLUDES ADDENDUM No.1 DATED 10-8-2026
Nov 17, 2026 AT 02:00 PM
DATE AND TIME OF BID OPENING:
CONTRACT ID C205222
WBS 34165.3.8
FEDERAL-AID NO. STATE FUNDED
COUNTY BUNCOMBE
T.I.P NO. I-2513AC
MILES 1.742
ROUTE NO. I-26/240
LOCATION I-26/I-240 FROM NORTH OF I-40 TO SR-3548 (HAYWOOD RD).
TYPE OF WORK GRADING, DRAINAGE, PAVING, SIGNALS, AND STRUCTURES.
NOTICE:
ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE OF GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
GENERAL STATUTES OF NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING BOARD FOR CONTRACTORS WHEN BIDDING
ON ANY NON-FEDERAL AID PROJECT WHERE THE BID IS $40,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY THE LICENSING BOARD.
BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR CONDITIONING
AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS
ON BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH
CAROLINA FOR LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
BIDS WILL BE RECEIVED AS SHOWN BELOW:
THIS IS A ROADWAY & STRUCTURE PROPOSAL
5% BID BOND OR BID DEPOSIT REQUIRED
GT-#11.1
I-2513AC BUNCOMBE COUNTY
DRILLED PIERS:
(11-17-26)
Revise the Standard Specifications as follows:
Replace Section 411 with the following:
SECTION 411
DRILLED PIERS
411-1 DESCRIPTION
Construct drilled piers consisting of CIP reinforced concrete cylindrical sections in excavated
holes typically stabilized with casings or slurry. Provide permanent casings, standard penetration
tests, integrity testing and assistance with the shaft inspection device as noted in the plans.
Construct drilled piers with the required resistances and dimensions in accordance with the
contract and accepted submittals. Use a prequalified Drilled Pier Contractor to construct drilled
piers.
Define "excavation" and "hole" as a drilled pier excavation and "pier" as a drilled pier. Define
"permanent casing" as a casing that remains in the excavation and acts as a form for Drilled Pier
concrete and "temporary casing" as any casing that is not permanent. Define "rock" as a
continuous intact natural material with a standard penetration resistance of 0.1 foot or less per 60
blows or a rock auger penetration rate of less than 2 inches per 5 minutes of drilling at full crowd
force or as determined by the Engineer when rock is not encountered as expected based on these
criteria. This definition excludes discontinuous loose natural materials such as boulders and
man-made materials such as concrete, steel, timber, etc. and is not for measurement and payment
purposes. See Article 411-7 for measurement and payment of drilled piers.
411-2 MATERIALS
Refer to Division 10.
Item Section
Grout, Type 2 1003
Portland Cement Concrete, Class Drilled Pier 1000
Reinforcing Steel 1070
Provide Type 3 material certifications in accordance with Article 106-3 for permanent casings
and roller, chair, steel pipe and cap materials. Store steel materials on blocking at least 12 inches
above the ground and protect it at all times from damage; and when placing in the work make
sure it is free from dirt, dust, loose mill scale, loose rust, paint, oil or other foreign materials.
Load, transport, unload and store drilled pier materials so materials are kept clean and free of
damage.
(A) Steel Casing
Define "casing" as a temporary or permanent casing. If permanent casing is required for
an excavation, the largest diameter casing in the hole is the permanent casing. This does
not apply to working casings around permanent casings as approved by the Engineer.
| Casing Diameter | Nominal Wall Thickness |
|---|---|
| < 48" | 0.375" |
| 48" - 78" | 0.500" |
| > 78" | 0.625" |
| Property | ANSI/API RPB 13B-1 | Requirement |
|---|---|---|
| DensityC (Mud Weight) | Section 4 Mud Balance | 64.3 - 72.0 pcf |
| Viscosity | Section 6.2 Marsh Funnel | 28 - 50 sec/qt |
| Sand Content | Section 9 | 4 %D |
| 2 %E | ||
| pH | Section 11 Glass Electrode pH MeterF | 8 - 11 |
GT-#11.2
I-2513AC BUNCOMBE COUNTY
Use smooth non-corrugated clean watertight steel casings of ample strength to withstand
handling and installation stresses and pressures imposed by concrete, earth, backfill and
fluids.
(1) Temporary Casings
Provide temporary casings with a nominal wall thickness of at least 0.375 inch
and an outside diameter equal to or larger than the design pier diameter for which
temporary casing is used.
(2) Permanent Casings
Use permanent casings with a yield strength of at least 36 ksi and a nominal wall
thickness that meets Table 411-1.
TABLE 411-1
MINIMUM PERMANENT CASING WALL THICKNESS
Casing Diameter Nominal Wall Thickness
< 48" 0.375"
48" - 78" 0.500"
> 78" 0.625"
Provide permanent casings with an outside diameter equal to the design pier
diameter for which permanent casing is used unless larger diameter permanent
casings are approved by the Engineer.
(B) Slurry
Define "slurry" as bentonite or polymer slurry. Mix bentonite clay or synthetic polymer
with water to make bentonite or polymer slurry.
(1) Bentonite Slurry
Provide bentonite slurry that meets Table 411-2.
TABLE 411-2
BENTONITE SLURRY REQUIREMENTSA
Property ANSI/API RPB 13B-1 Requirement
DensityC Section 4
64.3 - 72.0 pcf
(Mud Weight) Mud Balance
Section 6.2
Viscosity 28 - 50 sec/qt
Marsh Funnel
Sand Content Section 9 4 %D
2 %E
Section 11
pH 8 - 11
Glass Electrode pH MeterF
A. Slurry temperature of at least 40 degreesF required
B. American National Standards Institute/American Petroleum Institute Recommended
Practice
C. Increase density requirements by 2 pcf in saltwater
D. In tanks before pumping slurry into excavations
GT-#11.3
I-2513AC BUNCOMBE COUNTY
E. In excavations immediately before placing concrete
F. pH paper is also acceptable for measuring pH
(2) Polymer Slurry
Use polymer slurry products qualified by the Department. Provide polymer slurry
with density, viscosity, sand content and pH properties that meet the product
requirements. The polymer slurry QPL with the property requirements for each
qualified polymer slurry product is available on the Geotechnical Engineering
Unit's website.
(C) Rollers and Chairs
Use rollers and chairs that are non-metallic and resistant to corrosion and degradation.
Provide rollers with the necessary dimensions to maintain the minimum required concrete
cover shown in the plans and center rebar cages within excavations. Use chairs of
sufficient strength to support rebar cages in excavations and of the size necessary to raise
cages off bottom of holes to maintain the minimum required distance shown in the plans.
(D) Steel Pipes and Caps
Use Schedule 40 black steel pipes for access tubes for crosshole sonic logging (CSL).
Provide CSL tubes with an inside diameter of at least 1.5 inches. Use CSL tubes with a
round, regular inside diameter free of defects and obstructions, including any pipe joints,
in order to permit free, unobstructed passage of probes for CSL testing. Provide
watertight CSL tubes free of corrosion with clean internal and external faces to ensure a
good bond between concrete and tubes. Fit CSL tubes with watertight plastic caps on the
bottom and removable caps on top.
(E) Drilled Pier Concrete
Use drilled pier concrete material meeting the requirements of Section 1000, except as
modified below:
(1) Supplementary Cementitious Materials (SCMs)
Add SCMs to reduce peak concrete hydration temperature, improve thermal
performance, and mitigate risk of thermal cracking in Drilled Pier Concrete in
accordance with Table 411-3. Use any one or combination of the SCMs that
satisfies the required minimum dosages below:
(a) 25% Class F fly ash that meets ASTM C618
(b) 35% Class C fly ash that meets ASTM C618
(c) 35% slag cement that meets ASTM C989/C989M
(d) 5% silica fume that meets ASTM C1240 with 25% slag cement
(e) 5% silica fume that meets ASTM C1240 with 20% Class F fly ash that
meets ASTM C618
Use SCMs found on the Department's approved producer/supplier list. Concrete
mixtures containing high alkali cements must also utilize the appropriate SCMs and
minimum substitution rates provided in Article 1024-1.
| D Drilled Pier DiameterA (ft) | SCMs Required? (Yes/No) | Max ECC (lb/cy) | Max Temp with SCMsC ( degreesF) | Max Temp without SCMs ( degreesF) | Temp Prediction Required? (Yes/No) | Temp Monitoring Required? (Yes/No) |
|---|---|---|---|---|---|---|
| D < 5 | No | N/A | 185 | 158 | No | No |
| 5 D < 6 | Yes | 625 | N/A | No | Yes | |
| D 6 | Yes | B | N/A | Yes | Yes |
GT-#11.4
I-2513AC BUNCOMBE COUNTY
(2) Equivalent Cement Content (ECC)
Determine the ECC on a per cubic yard basis with the following formula:
ECC= 1.0(PC) + 0.5(FAF) + 0.8(FAC) + 1.2(SF) + 1.0(SC)
Where:
PC = Portland cement
FAF = Class F fly ash
FAC = Class C fly ash
SF = Silica fume
SC = Slag cement
All units are in pounds per cubic yard.
ECC shall meet the requirements of Table 411-3 unless otherwise supported by a
temperature prediction model in accordance with Subarticle 411-2(E)(3)(b).
(3) Thermal Control
(a) Use appropriate thermal control measures to reduce the peak concrete hydration
temperature in Drilled Pier Concrete. Methods for controlling concrete
temperature may include, but are not limited to, the following:
(i) Selecting constituent materials that minimize the heat generated by concrete
hydration.
(ii) Cooling constituent materials to reduce the temperature of concrete in its
plastic state.
(iii) Controlling the rate of concrete placement.
(iv) Other methods proposed by the Contractor and approved by the Engineer.
At a minimum, provide thermal control for Drilled Pier Concrete in accordance
with Table 411-3.
TABLE 411-3
THERMAL CONTROL REQUIREMENTS FOR DRILLED PIER CONCRETE
D SCMs Max Max Temp Max Temp Temp
Drilled Required? ECC with Temp Prediction Monitoring
Pier (Yes/No) (lb/cy) SCMsC ( degreesF) without Required? Required?
DiameterA SCMs (Yes/No) (Yes/No)
(ft) ( degreesF)
D < 5 No N/A 158 No No
5 D < 6 Yes 625 185 N/A No Yes
D 6 Yes B N/A Yes Yes
A. Drilled pier diameter is the largest constructed diameter for any portion of a pier.
B. As determined by temperature prediction model
C. For a list of SCM's allowed see Subarticle 411-2(E)(1)
GT-#11.5
I-2513AC BUNCOMBE COUNTY
(b) Temperature Prediction
Use the Schmidt Method or numerical thermal modeling as described in
Concrete: Microstructure, Properties, and Materials by Mehta and Monteiro
(2014) or other method approved by the Engineer to predict concrete
hydration temperature. Temperature predictions are required for each Drilled
Pier Concrete mix design with a different drilled pier condition. Variations in
constructed drilled pier diameter or drilled piers with permanent steel casing
are considered different drilled pier conditions. Submit temperature
prediction results and any planned thermal control measures at least 30 days
before beginning Drilled Pier Concrete placement.
(c) Temperature Monitoring
Monitor concrete hydration temperature for the first drilled pier constructed
with each Drilled Pier Concrete mix with a different drilled pier condition as
described in Subarticle 411-2(E)(3)(b). Measure temperature at the center of
the drilled pier diameter using two redundant thermal sensors inserted at least
1.5 x pier diameters below the top of pier and in accordance with ASTM
D7949, Method B. Begin recording temperature data to the nearest one-
degree Fahrenheit immediately after completing concrete placement. Record
temperatures using an hour or smaller interval of time. Continue recording
temperatures until at least 24 hours after the peak temperature has passed. If a
temperature limit is exceeded, continue monitoring until all temperature
values fall below the specified limit, even if the 24-hour requirement has been
met. Submit temperature monitoring data within 24 hours after completing
monitoring and before placing another drilled pier under the same conditions.
If temperature limits are exceeded during monitoring, submit a revised
thermal control plan including but not limited to revised concrete mix designs,
lower concrete placement temperature, or other modifications proposed by the
contractor for review by the Engineer. Do not place additional drilled piers
under the same conditions until the revised thermal control plan has been
reviewed by the Engineer. Drilled piers that exceed the temperature limits
established in Table 411-3 are considered unacceptable unless the Contractor
demonstrates through an engineering analysis that the drilled pier is
acceptable to the Engineer.
(d) Concrete Placement Temperature
For drilled piers with constructed diameters of 5 feet or greater, maintain
concrete temperature at time of placement between 40 degreesF and 75 degreesF. Placement
temperatures up to 85 degreesF may be permitted when supported by temperature
prediction or monitoring as specified in Subarticle 411-2(E)(3)(b) and (c).
When placement temperatures above 75 degreesF are permitted based on temperature
monitoring, continue monitoring subsequent drilled piers until monitoring
demonstrates that the maximum temperature specified in Table 411-3 will not
be exceeded at the higher placement temperature.
GT-#11.6
I-2513AC BUNCOMBE COUNTY
(4) Concrete Slump Loss
Place concrete within the slump requirements listed in Table 1000-1 and maintain
a minimum slump of 5 inches throughout the elapsed time. The elapsed time for
placing drilled shaft concrete includes the concrete mixing and transit time, the
concrete placement time, and the time required to remove any tremies, temporary
casings, etc. Include the estimated elapsed time for concrete placement in the
drilled shaft installation plan.
For drilled piers with a theoretical concrete volume of 75 cubic yards or more and
an estimated elapsed time greater than 2 hours, perform a field slump loss test.
Perform the slump loss test in accordance with the procedure posted on the
NCDOT Materials and Tests Unit website and demonstrate to the Engineer,
before drilled pier concrete placement, that the concrete will maintain a slump of
5 inches or greater for the estimated elapsed time. Place concrete if it's
temperature at the time of placement into the drilled pier is no more than 10 degreesF
higher than the slump loss test temperature. Use ice or other concrete-cooling
ingredients to lower concrete temperature or run additional slump loss tests at the
higher temperatures.
411-3 PRECONSTRUCTION REQUIREMENTS
(A) Drilled Pier Construction Plan
Submit the proposed drilled pier construction plan for all drilled piers for acceptance by
the Engineer. Provide an electronic copy of this plan at least 30 days before starting
drilled pier construction. Do not begin drilled pier construction until a construction plan
is accepted by the Engineer. Provide detailed project specific information in the drilled
pier construction plan that includes the following:
(1) Overall description and sequence of drilled pier construction;
(2) List and sizes of equipment including cranes, drill rigs, vibratory and downhole
hammers, Kelly bars, augers, core barrels, casings (diameters, thicknesses and
lengths), cleanout buckets, air lifts, pumps, slurry equipment, tremies, pump pipes
and other equipment;
(3) Procedures for casing installation and temporary casing removal including how
telescoping temporary casings will be removed;
(4) If applicable, details of slurry testing and use including intended purpose, product
information and additives, manufacturer's recommendations for use, name and
contact information for slurry manufacturer's technical representative, mixing and
handling procedures and how slurry level will be maintained above the highest
piezometric head;
(5) Methods for drilling and cleaning holes including how cores will be removed and
drilling spoils and slurry will be handled and disposed of;
GT-#11.7
I-2513AC BUNCOMBE COUNTY
(6) Details of CSL tubes, caps and joints including pipe size and how tubes will be
attached to reinforcing steel;
(7) Procedures for lifting and setting reinforcing steel including how rebar cages will
be supported and centralized;
(8) Procedures for placing concrete including how tremies and pump pipes will be
controlled and contaminated concrete will be contained;
(9) Concrete mix design that meets Section 1000;
(10) Approved packaged grout or grout mix design that meets Section 1003;
(11) CSL Consultant including Field and Project Engineer; and
(12) Other information shown in the plans or requested by the Engineer.
If alternate construction procedures are proposed or necessary, a revised drilled pier
construction plan submittal may be required. If the work deviates from the accepted
submittal without prior approval, the Engineer may suspend drilled pier construction until
a revised plan is accepted by the Engineer.
(B) Preconstruction Meeting
Before starting drilled pier construction, hold a drilled pier preconstruction meeting to
discuss the installation, monitoring and inspection of the drilled piers. Schedule this
drilled pier preconstruction meeting with the Engineer after the Drilled Pier Contractor
mobilizes to the site. If this meeting occurs before all drilled pier submittals have been
accepted by the Engineer, additional drilled pier preconstruction meetings may be
required before beginning construction of drilled piers without accepted submittals. The
Prime Contractor and Drilled Pier Contractor Superintendent shall attend the drilled pier
preconstruction meetings.
411-4 CONSTRUCTION METHODS
Do not excavate holes, install piles or allow equipment loads or vibrations within 20 feet of
completed piers until 16 hours after drilled pier concrete reaches initial set.
When drilling from a barge, use a fixed template that maintains hole position and alignment
during drilled pier construction. Do not use floating templates or templates attached to barges.
Check for correct drilled pier alignment and location before beginning drilling. Check
plumbness of Kelly bars before beginning and frequently during drilling.
For drilled piers constructed with slurry or permanent casings, the pier diameter may be 2 inches
less than the design pier diameter shown in the plans. For all other drilled piers, construct piers
with the minimum required diameters shown in the plans except for portions of drilled piers in
rock which may be 2 inches less than the design pier diameter.
Install drilled piers with tip elevations no higher than shown in the plans or approved by the
Engineer. Provide piers with the minimum required tip resistance and, when noted in the plans,
penetration into rock.
(A) Excavation

With GovernmentContracts, you can:
Follow Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Active
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 12/09/2026
Solicitation Number: 354-UT27-12 Project Title: Request for Qualifications - Master Plan & Rerating
State Government of North Carolina
Bid Due: 11/18/2026
Solicitation Number: 322-MAINT092926 Project Title: RFB FOR PARKING LOT PATCHING, SEALCOATING, AND RESTRIPING
State Government of North Carolina
Bid Due: 12/10/2026
Solicitation Number: 274-HCD-FY27-6 Project Title: FY 2027-2028 Community Enhancement Grant Description: FY 2027-2028
State Government of North Carolina
Bid Due: 11/23/2026