| Location: | Washington |
|---|---|
| Posted: | May 14, 2026 |
| Due: | Jun 16, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-BC043 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes providing all materials, labor, and equipment necessary to procure and install two galvanized steel piles for the Sucia Island Marine State Park Pumpout Station and the Installation of the Owner-furnished floating pumpout barge. This project also includes the following:
Marine Mammal and Marbled Murrelet Monitoring
Construction Surveying
Protected Species Monitoring Suspension

With GovernmentContracts, you can:
..., and the construction and installation of new precast concrete deck panels and ...
State Government of Washington
Bid Due: 8/13/2026
...corrosion of the steel piles and other work. Involves 9 items and 180 ...
State Government of Washington
Bid Due: 7/29/2026
..., and the construction and installation of new precast concrete deck panels and ...
Sammamish Plateau Water
Bid Due: 8/13/2026
...Design Flow Rate: 200 GPM at 95 FT Total Dynamic Head (TDH) Construction: ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 8/07/2026