| Location: | District of Columbia |
|---|---|
| Posted: | Oct 23, 2025 |
| Due: | Nov 4, 2025 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-25-24551 |
| Publication URL: | To access bid details, please log in. |
IFB-25-24551: Electrical Feeders Installation & Replacement, IAD
UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment, & supervision to provide turnkey construction for the installation of New Electrical Feeders & replacing existing Electrical Feeders at Washington Dulles International Airport (IAD). Work includes but not limited to the following:
1.) installation of two new 15kV parallel feeders designated PN-3 & PN-4 to increase the existing Medium Voltage (MV) distribution capacity.
2.) replacement of the existing 15kV feeders designated PW-1 & PW-2 originating from 15kV Switchgear lineups in IAD’s Utility Building East (UBE) & Utility Building West (UBW)
3.) replacement of the existing 15kV feeders designated PU-1 & PU-2 originating from 15kV Switchgear lineups in IAD’s Utility Building East (UBE) & Utility Building West (UBW).
Solicitation Issue Date: September 11, 2025
Due Date for Submissions: November 4, 2025
Amendments Issued: Four
SLBE Requirement: 25%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can: