| Location: | Iowa |
|---|---|
| Posted: | Dec 3, 2024 |
| Due: | Jan 8, 2025 |
| Agency: | City of Cedar Rapids |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 6150058-04 |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Request for Bid |
| Status | Issued |
| Number | 6150058-04 (Molecular Sieve Installation Project - Package 2) |
| Issue Date & Time | 12/3/2024 04:00:01 PM (CT) |
| Close Date & Time | 1/8/2025 11:00:00 AM (CT) |
| Notes | The Work generally consists of the construction of a structural foundation and pad to support the cryogenic molecular sieve equipment, as well as the extension of electrical and controls from the Oxygen Building to the equipment pad, construction of an access drive, and other site improvements needed to accompany the installation of the cryogenic molecular sieve equipment. The City Engineer’s opinion of probable construction cost for the Work is $300,000. |
| Name | Will Bosworth, P.E. |
| Address |
USA |
| Phone | (608) 251-4843 |
| Fax | (608) 251-8655 |
| will.bosworth@strand.com |
| Document name | Format | |
|
||
|
Bid Invitation
|
Acrobat / PDF |
| File Name | Description | File Size |
|
||
|
Bid Bond.pdf
|
Bid Bond | 11 KB |
|
Bidder Status Form.pdf
|
Bidder Status Form | 16 KB |
|
CedarRapids.6150058-04.Drawings.pdf
|
Project Drawings | 9.94 MB |
|
CedarRapids.6150058-04.Specifications.pdf
|
Project Specifications | 2.66 MB |

With GovernmentContracts, you can:
...-509-1373 Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional... West Des Moines Iowa ...
Iowa State University
Bid Due: 10/13/2026
...Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional: Alyssa Iverson...@mbionline.com McGraw-Hill Construction Dodge ...
Iowa State University
Bid Due: 10/29/2026
...Cho namho-cho@uiowa.edu Estimated Construction Cost: $159,503.00 Pre Bid Date: 9/29/26 Pre Bid... Location: ...
University of Iowa Facilities Management
Bid Due: 10/14/2026
...estimated construction cost range for this project is $150,000 to $250,000. Completion Dates...: ...
State Government of Iowa
Bid Due: 10/27/2026