| Location: | Colorado |
|---|---|
| Posted: | Dec 3, 2024 |
| Due: | Jan 9, 2025 |
| Agency: | City of pueblo |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 24-123 |
| Publication URL: | To access bid details, please log in. |
Project ID: 24-123
Title: Design of West Side Improvements
Addenda: 0
Release Date: 12/3/2024
Due Date: 1/9/2025
The project shall include the design, engineering, planning, drawings, plans, and consulting for Sun Mountain Boulevard from 24th Street to 31st Street (including two roundabouts). The design also includes the rehabilitation of approximately 70 bus stops to comply with ADA standards on the west side of Pueblo in Pueblo, Colorado. The southern portion of the street within the Pikes Peak Park Subdivision has been designed by NorthStar Engineering and Surveying, Inc.; the awarded Consultant must coordinate the alignment and remainder of the design. Environmental studies and NEPA document preparation will be done by a separate consultant.
The City of Pueblo was awarded a RAISE Grant from the US Department of Transportation Federal Highway Administration.

With GovernmentContracts, you can: