| Location: | Washington |
|---|---|
| Posted: | Jan 22, 2025 |
| Due: | Feb 12, 2025 |
| Agency: | City of Seattle |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PW#2024-049 |
| Publication URL: | To access bid details, please log in. |
Project ID: PW#2024-049
Title: STS Floor Repairs
Addenda: 0
Release Date: 1/22/2025
Due Date: 2/12/2025
Project Description: This project will replace the commercial side tipping floor, including the horizontal steel plates at chutes 1 and 2, with ultra-high performance cementitious floor topping at the South Transfer Station (STS). The scope of work includes:
1. Traffic control.
2. Selective demolition of existing floor topping.
3. Floor preparation.
4. Temporary barriers during construction.
5. Dust mitigation and sediment capture.
6. Collection and treatment of construction water in accordance with the Industrial Stormwater General Permit (ISGP).
7. Removal of steel sheets from existing chutes.
8. Installation of ultra-high performance cementitious floor topping.
9. Installation, maintenance and removal of temporary wheel wash station.
Engineer's Estimate: $3,520,000 (before tax)
Project Location: This project is located at the South Transfer Station (STS) at 130 S Kenyon Street, Seattle, WA 98108.

With GovernmentContracts, you can:
...Solicitation Information Title DRS RFP 26-06 Access Control and Transitions Reference Number... that ...
State Government of Washington
Bid Due: 11/03/2026
...friction surface treatment, maintaining traffic control, and other work. Involves 24 items and ...
State Government of Washington
Bid Due: 10/07/2026
...Follow HEALY-SLEP Industry Day - Deaerating Feed Tank (DFT), PLC-Based Steering Control System... ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 10/06/2027
...friction surface treatment (HFST), maintaining traffic control, and other work. 15 working days. ...
State Government of Washington
Bid Due: 10/07/2026