Advertisement for Bids: C1623 – Works Progress Administration (“WPA”) Street Reconstruction (58th, Washtenaw, 57th)

Location: Illinois
Posted: May 2, 2025
Due: Jun 3, 2025
Agency: Public Building Commission
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Advertisement for Bids: C1623 – Works Progress Administration (“WPA”) Street Reconstruction (58th, Washtenaw, 57th)

PROJECT DESCRIPTION:
The Public Building Commission of Chicago (PBC) has invited all Contractors to bid on PBC Contract C1623, Works Progress Administration (“WPA”) Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.).

The WPA Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.) Project is located at:

  • W. 58 th St. – West 58 th Street from South Hamilton Avenue to South Damen Avenue Chicago, IL
  • S. Washtenaw Ave. – South Washtenaw Avenue from West 36 th Place to West 37 th Place Chicago, IL
  • W. 57 th St. – West 57 th Street from South Western Avenue to Dead End East Chicago, IL

The project consists of a Works Progress Administration (“WPA”) street reconstruction Project, including: full-depth pavement reconstruction of the location indicated above. Work includes but isn’t limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main, water main and drainage structures, water main, concrete curb and gutter, concrete sidewalks, tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, lighting, thermoplastic pavement marking, signs, topsoil, sodding, tree removal and planting.

Contractor will be required to prepare a Phasing and Logistics Plan within thirty (30) days of issuance of the Notice to Proceed (‘NTP’) for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work. The Contractor shall also be responsible for providing critical submittals, including electrical lighting (poles and luminaires), sewer and water main, and concrete mix design, as determined by the PBC, within thirty (30) days of issuance of the NTP.

DOCUMENT AVAILABILITY:

  • Book 1 Instructions to Bidders may be found here
  • Master Bid Form may be found here
  • Plans and specifications, including any Addenda issued for the above-referenced project may be found here: Cushing Co. Planroom .
  • The list of Assist Agencies who will have access to complete sets of digital drawings and specifications can be found here .

PRE-BID ACTIVITIES:

On Monday, May 15, 2025, PBC will host a Non-Mandatory Virtual Pre-Bid Meeting at 11:00 a.m., and a Non-Mandatory Virtual Technical Review Meeting at 11:30 a.m. on ZOOM virtual meeting platform.

To join click on the link or call the number below:

Subcontractors and suppliers are encouraged to attend.

Pre-Bid/Tech Review Materials:

  • (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.) – Pre-Bid and Tech Review Presentation (will appear here when available)
  • (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.) – Pre-Bid and Tech Review Attendance Sheet (will appear here when available)

To view related video(s), please click on respective link(s) below:

  • (Non-Mandatory) Works Progress Administration (“WPA”) Street Reconstruction (W. 58th St., South Washtenaw Ave., W. 57th St.) – Pre-Bid and Tech Review Video (will appear here when available)

Addenda:

(To be uploaded once available)

BID OPENING:

Sealed bids shall be received electronically by Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org and pbc-procurement@cityofchicago.org , by 11 a.m. on Tuesday, June 3, 2025. A Public Bid Opening, streamed on the PBC YouTube channel, will immediately follow at 11:00 a.m.

Please refer to Book 1 Instructions to Bidders, Submission of Bids, for further instructions.

Bid Tabulation:

(To be uploaded once available)

To view related video(s), please click on respective link(s) below:

(To be uploaded once available)

QUESTIONS:
All questions regarding this contract must be submitted in writing, via email to Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org no later than May 26, 2025.

Public Building Commission of Chicago
Mayor Brandon Johnson, Chairman
Ray Giderof, Executive Director

Office of Inspector General Complaint Hotline
If you see corruption, fraud, waste, or dishonest practices of any kind please report it to the City of Chicago Office of Inspector General (OIG) – PBC’s oversight body. Concerned employees, contractors, consultants, and members of the public may contact OIG via its independent hotline and website.

Telephone Reporting: (866) IG-TIPLINE (866-448-4754).

Web Reporting: http://ChicagoInspectorGeneral.org/Get-Involved

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.