| Location: | Minnesota |
|---|---|
| Posted: | Jul 17, 2025 |
| Due: | Aug 12, 2025 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C26325B0021 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The contractor shall provide all necessary labor, materials, tools, and equipment to support the campus-wide upgrade of the Physical Access Control System (PACS). This project includes the installation of new card access hardware, software, card readers, and door card hardware at designated existing openings as indicated in the project drawings. The scope of work includes the replacement of existing PACS devices along with the modification or relocation of utilities, architectural elements, and electrical systems to accommodate the new installations.
The upgraded system will include high-priority biometric card readers, card key and keyed pad door controllers, and a new PC-based server to manage access control functions. The new PACS system must fully integrate all existing PACS devices and allow them to be incorporated into a unified control system.
The project requires demolition, alterations, and utility relocations as necessary to facilitate the installation of the new PACS system. Architectural and electrical modifications will also be performed to ensure system compatibility. All construction activities must be scheduled and phased to minimize disruption to staff and daily operations, while also adhering to infection control measures throughout the project duration.
To ensure full system integration and operability, the contractor must test all PACS devices and network connections both functionally and operationally after installation. All work must comply with the project specifications, contract drawings, and applicable local, state, federal, and national codes, and regulations. The contractor must also adhere to all VA directives, design guides, and manuals to ensure compliance with regulatory requirements and project standards.
Period of Performance is 495 days.
| Jun 13, 2025 | [Presolicitation (Original)] Y1AA--656-19-324 Upgrade Physical Access Control System (PACS) 36C263-25-AP-3085 |

With GovernmentContracts, you can:
REFUSE & RECYCLING HAULING SERVICES. The City of Le Sueur is requesting proposals
League of Minnesota Cities
Bid Due: 6/05/2026
Bid# Description Opening Date 2026-09 RFP - Multiple Master Contracts for Abatement and
Anoka County
Bid Due: 6/05/2026
REFUSE & RECYCLING HAULING SERVICES. The City of Le Sueur is requesting proposals
League of Minnesota Cities
Bid Due: 6/05/2026
Event Name Business Unit Event ID Event Format Event Type COM Event Type
City of Minneapolis
Bid Due: 6/15/2026