The City of Great Bend Fire Department is accepting sealed bids for the construction of a
50’x80’ building to be constructed at Great Bend Fire Department Station 2 located at
585110th Street Great Bend, KS. Sealed bids will be accepted at Great Bend Fire Station # 1
1205 Williams until 3:00 PM (CST) on December 19, 2025, with construction to begin
February of 2026. Performance and payment bond required per City of Great Bend policy.
Engineered plans are required with submission.
BUILDING SPECIFICATIONS: 50'W X 80'L X 16'H (inside)
• 50' Pre-engineered Wood Trusses @ 4 / 12 pitch
• 1' Overhang with boxed/vented Soffit
• Post Hole 4' 6"D X 1' 6"W with Composite Footing Pad or (per engineered plans)
• 2x6 SYP uplift protection or (per engineered plans)
• 3 ply 2x6 Post (Eaves 8' O.C.) (Gables 10' O.C.)
• On Edge 2x4 SYP #2 2' O.C. Roof Purlins
• 2' 3" O.C. 2x6 SYP #2 Wall Girts or (per engineered plans)
• 2x8 Treated Skirtboard
SIDING AND ROOF:
• Roof: Charcoal Gray 26ga Metal Roof Panel w/ 2" Vinyl Backed Insulation
• Wall: Charcoal Gray 26ga Metal Wall Panel w/ 2" Vinyl Backed Insulation
• Trim: Red 26ga Metal Trim
• Approximately 160’ of gutter with down spouts
• All metal colors will match as close as possible current building at 5851 10th St,
Great Bend
DOOR AND WINDOW DETAIL:
• 4 - 12x14 White Overhead Doors - Left of Main Building
• 1 - 3-0 9 Lite White Door - LH in Swing - Left end Main Building
• 1 - 3-0 9 Lite White Door - RH in Swing – Right end Main Building
• OHD Details: 4- 12’w x14’h Insulated Commercial Door; White.
to Include Electric Opener with wall controls and 1 Remote/Door
ADD ONS:
• Interior Ceiling: Brilliant White Liner 29ga (minimum)Liner Panel
• Interior Walls: Brilliant White Liner 29ga (minimum) Liner Panel
• 6” Batt Insulation on the walls only. – R 30
• Blow in Insulation in ceiling. – R 38
• Inside 6” concrete floor cut and power trowel finish, 4000 psi mix with ½” rebar 24”
on center both directions placed on chairs
Second/Separate Bid:
Approximately 2500 sq ft (30’x80’) 4000 psi, 6” thick concrete with ½” rebar 24”on center
both ways placed on chairs, cut and light broom finished, building approach/driveway to be
sloped away from building, match up to current driveway and allow for water to drain.
Some dirt work will possibly be required.