| Location: | Connecticut |
|---|---|
| Posted: | Jul 17, 2025 |
| Due: | Aug 1, 2025 |
| Agency: | Town of Manchester |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 24/25-91 |
| Publication URL: | To access bid details, please log in. |
Project ID: 24/25-91
Title: REHABILITATION AND MAINTENANCE OF WELL 6 AND WELL 7A
Addenda: 0
Release Date: 7/17/2025
Due Date: 8/1/2025
The Town of Manchester Water and Sewer Department is seeking a capable and reliable contractor to provide rehabilitation services for Well 6 and Well 7A, located at the Town’s water supply facilities in Manchester, CT, with Well 7A to be completed first, and to enter into a 3 year service contract for ongoing well maintenance, including annual inspections. The project aims to restore optimal performance and ensure compliance with regulatory standards, utilizing the AquaGuard CO2 injection system or equivalent methods for well cleaning.
The Manchester Water and Sewer Department operates water and wastewater treatment facilities serving Manchester, Connecticut, and portions of Glastonbury and surrounding towns. The water system includes 16,500 domestic service lines, 1,047 fire and irrigation services, and delivers an average of 5 million gallons of water daily. The water supply consists of seven reservoir impoundments and ten groundwater wells, with a total capacity of 9.8 million gallons per day. Well 6 and Well 7A, located at the New State Road Facility, are critical components of the groundwater supply, requiring rehabilitation to address biofouling, scaling, or sediment buildup and ongoing maintenance to sustain efficiency and water quality. The wells have onsite treatment, including air striping, chlorination, fluoridation, and corrosion control.

With GovernmentContracts, you can:
...Sewage Sludge & Wastewater Hauling and Disposal The Town of Glastonbury, Water Pollution... ...
State Government of Connecticut
Bid Due: 11/10/2026
...Bid Title: EXTENDED-Academy Wastewater Feasibility Study Category: Town Bid/RFP Postings Status...: Open Description: ...
Town of Madison
Bid Due: 11/06/2026
...RFQ: On-Call Engineering Services for Wastewater-Related Needs The Town of Stafford Water... on-call ...
State Government of Connecticut
Bid Due: 11/17/2026
...Description Opening Date/Time Closing Date/Time RFQ: On-Call Engineering Services for Wastewater...
Town of Stafford
Bid Due: 11/16/2026