| Location: | Florida |
|---|---|
| Posted: | Nov 20, 2025 |
| Due: | Dec 3, 2025 |
| Agency: | City of Palm Coast |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB-UT-26-08 |
| Publication URL: | To access bid details, please log in. |
Project Description: The City of Palm Coast is soliciting bids from qualified contractors to provide a turnkey installation of two (2) new 15-horsepower oilless air compressors in the Ultrafiltration Building at Water Treatment Plant No. 2. The compressors shall function as redundant systems, fully integrated with the City’s existing equipment, including the storage tank, dryer, and regulators. Work includes all labor, materials, and repairs necessary to ensure proper operation of the complete system. A MANDATORY onsite visit is required prior to bidding.

With GovernmentContracts, you can:
...to Source 1 Solutions, Inc. for turnkey installation of Verizon-compatible eFemto small-cell systems..., ...
Hillsborough County
Bid Due: 9/25/2026
...Station locations Project Manager: Ole Olsen Unless otherwise noted, the Contractor shall provide ...
County of Lake
Bid Due: 10/07/2026
...: Bids Status: Open Description: Due to the turnkey nature of the electrical ...
City of Wilton Manors
Bid Due: 10/07/2026
...will be a net new endeavor. This system is intended to be a ...
City of Orlando
Bid Due: 10/20/2026