| Location: | North Carolina |
|---|---|
| Posted: | Jul 17, 2025 |
| Due: | Aug 13, 2025 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-ITBCON-09 |
| Publication URL: | To access bid details, please log in. |
Project Description: Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 1925 Arnold Dr, 10112 Fairway Ridge, and 1127 Willhaven Dr. 1925 Arnold Dr will involve new drainage structures and reinforced concrete pipe, a modified pipe alignment, new curb and gutter, concrete driveway replacement, sanitary sewer replacement as well as full depth asphalt replacement along Arnold Dr. 10112 Fairway Ridge will involve new drainage structures and elliptical reinforced concrete pipe, a modified pipe alignment, sanitary sewer replacement, concrete driveway and full depth asphalt replacement along Fairway Ridge.

With GovernmentContracts, you can:
...Pipe Replacement (PDF, 26MB) RFB # P27-07 North Street Storm Sewer Replacement - ...
Town of Chapel Hill
Bid Due: 9/23/2026
...by the Engineer. Other work may include sewer lateral replacement and water meter ...
City of Charlotte
Bid Due: 10/07/2026
...grating. Replacement of influent bar screen with new grinder. 6. Landfill PS: Installation ...
State Government of North Carolina
Bid Due: 10/13/2026
...by the Engineer. Other work may include sewer lateral replacement and water meter ...
City of Charlotte
Bid Due: 10/07/2026