| Location: | Connecticut |
|---|---|
| Posted: | Nov 4, 2026 |
| Due: | Nov 12, 2026 |
| Agency: | State of Connecticut Judicial Branch |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 02-2623 |
| Publication URL: | To access bid details, please log in. |
| due date | bid no | pre-bid date | description |
|
11:30 A.M. Nov 12, 2026 11:30 A.M. |
02-2623 | Oct 19, 2026 |
Parking Garage Elevator Repair Project - The repair of an elevator in a parking garage located at a Judicial Branch location in Middletown Connecticut.
Click Here to View Project Manual Mandatory Pre-Bid Conference: Monday, October 19, 2026 at 8:00 a.m. VENDORS CURRENTLY REGISTERED UNDER THE STATE'S SUPPLIER DIVERSITY/SET-ASIDE PROGRAM ARE ENCOURAGED TO BID. This contract will be subject to state spending allocation goals and contract compliance requirements . Click Here to view Addendum No. 1 Commodity Class: 009 |
PROJECT MANUAL
GARAGE ELEVATOR REPAIRS
AT
SUPERIOR COURT - GA #9
1 COURT ST
MIDDLETOWN, CONNECTICUT 06457
HON. RAHEEM L. MULLINS HON. JOAN K. ALEXANDER
CHIEF JUSTICE CHIEF COURT ADMINISTRATOR
STATE OF CONNECTICUT
JUDICIAL BRANCH FACILITIES
90 WASHINGTON STREET
HARTFORD, CONNECTICUT 06106
Judicial Branch PN#JB26-027
CONSULTANT:
Jenkins & Huntington, Inc.
August 21, 2026
| 00 00 00 | Manual Cover | 1 | |
|---|---|---|---|
| 00 01 05 | Project Team Seals Page | - | X |
| 00 01 10 | Table of Contents & Checklist | 3 | |
| 00 01 15 | List of Drawing Sheets | - | X |
| 00 01 20 | Project Team List | 1 | |
| DIVISION 01 GENERAL REQUIREMENTS | |||
| 01 10 00 | Summary of Work | 5 | |
| 01 21 00 | Allowances | 3 | |
| 01 22 00 | Unit Prices | - | X |
| 01 23 00 | Alternates | - | X |
| 01 25 00 | Substitution Procedures | 4 | |
| 01 26 00 | Contract Modification Procedures | 3 | |
| 01 29 00 | Payment Procedures | 5 | |
| 01 31 00 | Project Management and Coordination | 10 | |
| 01 32 00 | Construction Progress Documentation | 10 | |
| 01 32 10 | Photographic Documentation | - | X |
| 01 33 00 | Submittal Procedure | 8 | |
| 01 35 16 | Alteration Project Procedures | 7 | |
| 01 40 00 | Quality Requirements | 11 | |
| 01 40 01 | Statement of Special Inspections | - | X |
| 01 50 00 | Temporary Facilities and Controls | 12 | |
| 01 60 00 | Product Requirements | 7 | |
| 01 73 00 | Execution | 10 | |
| 01 77 00 | Closeout Procedures | 6 | |
| 01 78 23 | Operation and Maintenance Data | 9 | |
| 01 78 39 | Project Record Documents | 4 | |
| DIVISION 02 EXISTING CONDITIONS | |||
| DIVISION 03 CONCRETE | |||
TABLE OF CONTENTS
SECTION 000110
PAGE 1 of 3
SECTION 000110 - TABLE OF CONTENTS
Section No. Title Page Count Not Used
00 00 00 Manual Cover 1
00 01 05 Project Team Seals Page - X
00 01 10 Table of Contents & Checklist 3
00 01 15 List of Drawing Sheets - X
00 01 20 Project Team List 1
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary of Work 5
01 21 00 Allowances 3
01 22 00 Unit Prices - X
01 23 00 Alternates - X
01 25 00 Substitution Procedures 4
01 26 00 Contract Modification Procedures 3
01 29 00 Payment Procedures 5
01 31 00 Project Management and Coordination 10
01 32 00 Construction Progress Documentation 10
01 32 10 Photographic Documentation - X
01 33 00 Submittal Procedure 8
01 35 16 Alteration Project Procedures 7
01 40 00 Quality Requirements 11
01 40 01 Statement of Special Inspections - X
01 50 00 Temporary Facilities and Controls 12
01 60 00 Product Requirements 7
01 73 00 Execution 10
01 77 00 Closeout Procedures 6
01 78 23 Operation and Maintenance Data 9
01 78 39 Project Record Documents 4
DIVISION 02 EXISTING CONDITIONS
DIVISION 03 CONCRETE
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027
| DIVISION 04 MASONRY | |||
|---|---|---|---|
| DIVISION 05 METALS | |||
| DIVISION 06 WOOD, PLASTICS, AND COMPOSITES | |||
| DIVISION 07 THERMAL AND MOISTURE PROTECTION | |||
| DIVISION 08 OPENINGS | |||
| DIVISION 09 FINISHES | |||
| DIVISION 10 SPECIALTIES | |||
| DIVISION 11 EQUIPMENT | |||
| DIVISION 12 FURNISHINGS | |||
| DIVISION 13 SPECIAL CONSTRUCTION | |||
| DIVISION 14 CONVEYING EQUIPMENT | |||
| 14 24 10 | Hydraulic Elevator Jack Replacement | 9 | |
| DIVISION 21 FIRE SUPRESSION | |||
TABLE OF CONTENTS
SECTION 000110
PAGE 2 of 3
DIVISION 04 MASONRY
DIVISION 05 METALS
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
DIVISION 07 THERMAL AND MOISTURE PROTECTION
DIVISION 08 OPENINGS
DIVISION 09 FINISHES
DIVISION 10 SPECIALTIES
DIVISION 11 EQUIPMENT
DIVISION 12 FURNISHINGS
DIVISION 13 SPECIAL CONSTRUCTION
DIVISION 14 CONVEYING EQUIPMENT
14 24 10 Hydraulic Elevator Jack Replacement 9
DIVISION 21 FIRE SUPRESSION
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027
| DIVISION 22 PLUMBING | |||
|---|---|---|---|
| DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | |||
| DIVISION 25 INTEGRATED AUTOMOATION | |||
| DIVISION 26 ELECTRICAL | |||
| DIVISION 27 COMMUNICATIONS | |||
| DIVISION 28 ELECTRONIC SAFETY AND SECURITY | |||
| DIVISION 31 EARTHWORK | |||
| DIVISION 32 EXTERIOR IMPROVEMENTS | |||
| DIVISION 33 UTILITIES | |||
TABLE OF CONTENTS
SECTION 000110
PAGE 3 of 3
DIVISION 22 PLUMBING
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING
(HVAC)
DIVISION 25 INTEGRATED AUTOMOATION
DIVISION 26 ELECTRICAL
DIVISION 27 COMMUNICATIONS
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
DIVISION 31 EARTHWORK
DIVISION 32 EXTERIOR IMPROVEMENTS
DIVISION 33 UTILITIES
END OF SECTION 000110
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027
TEAM LIST
SECTION 000120
PAGE 1 of 1
SECTION 000120 -PROJECT TEAM LIST
PRIME CONSULTANT
Elevator Consultant:
Jenkins & Huntington, Inc.
5 Climax Rd
#3605
Avon, CT. 06001
Project Contact:
Graham Huntington
GHuntington@j-hi.com
860-677-5942
END OF SECTION 000120
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027
SUMMARY OF WORK
SECTION 011000
PAGE 1 of 5
SECTION 011000 - SUMMARY
PART ONE - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Phased construction.
4. Work performed by Owner.
5. Work under Owner's separate contracts.
6. Owner's product purchase contracts.
7. Owner-furnished/Contractor-installed (OFCI) products.
8. Owner-furnished/Owner-installed (OFOI) products.
9. Contractor's use of site and premises.
10. Coordination with occupants.
11. Work restrictions.
12. Specification and Drawing conventions.
13. Miscellaneous provisions.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and
procedures governing temporary use of Owner's facilities.
2. Section 017300 "Execution" for coordination of Owner-installed products.
1.3 PROJECT INFORMATION
A. Project Identification:
1. Garage Elevator Repairs
2. JB26-027
3. 1 Court St., Middletown, CT
B. Owner: State of Connecticut, Judicial Branch, Office of the Chief Court Administrator,
90 Washington Street, Hartford, CT 06106.
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027
SUMMARY OF WORK
SECTION 011000
PAGE 2 of 5
1. Owner's Representative: David Cyr, Program Manager, Cell 959-759-7044
C. Consultant: Jenkins & Huntington Elevator Consultants.
1. Consultant's Representative: Graham Huntington, 860-677-5942
1.4 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and includes, but is not
limited to, the following:
1. Replace the jack assembly of one direct acting hydraulic elevator in accordance
with these specifications and other Work indicated in the Contract Documents.
1.5 WORK SEQUENCE
A. Construct the Work in one single phase.
B. Project duration should be completed within 60 days from issuance of a purchase order.
C. Mobilization
1. Project shall mobilize, and construction started no later than fourteen (14)
calendar days after issuance of a Purchase Order.
D. Submittals
1. The following shall be submitted at the earliest possible date, but no later than
seven (7) calendar days from issuance of a "Purchase Order".
a. Site Logistics Plan
b. Phasing/Sequence Plan
c. Contractor's Construction Schedule
d. Schedule of Values
e. Submittal Log
f. Key Personnel and Contact Information
g. Subcontract List
2. Remaining project submittals shall start no later than seven (7) calendar days
from issuance of a Purchase Order, including but not limited to:
a. Project/Site Safety Plan
b. Product/Material submittals
E. Closeout
1. Closeout shall be completed within [60] calendar days from substantial
completion.
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027
SUMMARY OF WORK
SECTION 011000
PAGE 3 of 5
F. Before commencing Work of each phase, submit an updated copy of Contractor's construction
schedule, showing the sequence, commencement and completion dates for all phases of the
Work.
1.6 CONTRACTOR'S USE OF SITE AND PREMISES
A. Restricted Use of Site: The Contractor shall have limited use of Project site for
construction operations as indicated on Drawings by the Contract limits and as indicated
by requirements of this Section.
B. Limits on Use of Site: Limit use of Project site to the elevator shaft indicated. Do not
disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits on Use of Site: Confine construction operations to the elevator shaft.
2. Driveways, Walkways and Entrances: Keep driveways. parking garage, and
entrances serving premises clear and available to Owner, Owner's employees,
and emergency vehicles at all times. Do not use these areas for parking or for
storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances by
construction operations.
b. Schedule deliveries to minimize space and time requirements for storage
of materials and equipment on-site.
C. Condition of Existing Building: Maintain portions of existing building affected by
construction operations in a weathertight condition throughout construction period.
Repair damage caused by construction operations.
D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and
hardscaping affected by construction operations throughout construction period. Repair
damage caused by construction operations.
1.7 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Owner will occupy Project site and existing building during
entire construction period. Cooperate with Owner during construction operations to
minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere
with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or
used facilities. Do not close or obstruct walkways, corridors, or other occupied or
used facilities without written permission from Owner and approval of authorities
having jurisdiction.
2. Notify Owner not less than 72 hours in advance of activities that will affect
Owner's operations.
3. Remove furniture and portable equipment, which interferes with the execution of
the Work, and store where directed. Reset such items when directed.
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027
SUMMARY OF WORK
SECTION 011000
PAGE 4 of 5
1.8 WORK RESTRICTIONS
A. Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets, Work on public streets, rights of
way, and other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit Work to between 7 a.m. to 5 p.m., Monday through Friday,
unless otherwise indicated. Work hours may be modified to meet Project requirements if
approved by Owner and authorities having jurisdiction.
1. Weekend Hours: Weekend Hours: 8 a.m. to 5 p.m.
C. Owner reserves the right to stop Work if it becomes disruptive to the daily
business/operation of the Court, court operations facility, and/or detention center.
Disruptive work must be completed outside of normal business hours at no cost to the
Owner.
D. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by
Owner or others unless permitted under the following conditions and then only after
arranging for temporary utility services according to requirements indicated:
1. Notify Owner not less than four days in advance of proposed utility interruptions.
2. Obtain Owner's written permission before proceeding with utility interruptions.
E. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of
noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.
1. Notify Consultant and Owner not less than two days in advance of proposed
disruptive operations.
2. Obtain Owner's written permission before proceeding with disruptive operations.
F. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic
beverages, and other controlled substances is not permitted.
G. Employee Identification: Provide identification tags and/or company branded clothing for
Contractor personnel working on Project site. Require personnel to use these at all times.
H. Employee Screening: Comply with Owner's requirements for drug and screening of
Contractor personnel working on Project site.
I. Contractor's personnel shall sign in/out daily with Owner representatives.
1.9 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of
language and the intended meaning of certain terms, words, and phrases when used in
particular situations. These conventions are as follows:
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027
SUMMARY OF WORK
SECTION 011000
PAGE 5 of 5
1. Imperative mood and streamlined language are generally used in the
Specifications. The words "shall," "shall be," or "shall comply with," depending
on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Text Color: Text used in the Specifications, including units of measure,
manufacturer and product names, and other text may appear in multiple colors or
underlined as part of a hyperlink; no emphasis is implied by text with these
characteristics.
3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks
may allow for access to linked information that is not residing in the
Specifications. Unless otherwise indicated, linked information is not part of the
Contract Documents.
4. Specification requirements are to be performed by Contractor unless specifically
stated otherwise.
B. Division 00 Contracting Requirements: General provisions of the Contract, including
General and Supplementary Conditions, apply to all Sections of the Specifications.
C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the
Work of all Sections in the Specifications.
D. Drawing Coordination: Requirements for materials and products identified on Drawings
are described in detail in the Specifications. One or more of the following are used on
Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms
used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations scheduled
on Drawings.
PART TWO - PRODUCTS (Not Used)
PART THREE - EXECUTION (Not Used)
END OF SECTION 011000
JUDICIAL BRANCH
Jenkins & Huntington Garage Elevator Repairs
JB26-027

With GovernmentContracts, you can:
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA The Northwest Hills Council
State Government of Connecticut
Bid Due: 11/30/2026
On-Call - Geotechnical Engineering Submit a Bid for this solicitation through the HuskyBuy
State Government of Connecticut
Bid Due: 12/08/2026
ARCHITECTURAL AND ENGINEERING CONSULTANT SVCS - PITKIN COMM CTR ADDITION The Town of
State Government of Connecticut
Bid Due: 12/17/2026
Transportation Engineering Design- Rte 174 Congestion Mitigation/Safety Imprvmt The City of New Britain
State Government of Connecticut
Bid Due: 12/03/2026