PROPOSAL
DATE AND TIME OF BID OPENING: December 17, 2025, AT 2:00 PM
CONTRACT ID: DJ00581
WBS ELEMENT NO.: 34446.3.5
FEDERAL AID NO.: STATE FUNDED
COUNTY:
STANLY
TIP NO.:
R-2530BA
MILES:
4.4
ROUTE NO.:
NC 24/27
LOCATION:
NC 24/27
TYPE OF WORK: Install Rumble Strips on Inside and Outside Shoulders
NOTICE:
ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE OF
GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF
NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING
BOARD FOR CONTRACTORS WHEN BIDDING ON ANY NON-FEDERAL AID PROJECT WHERE THE
BID IS $30,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY THE
LICENSING BOARD. BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS
REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR
CONDITIONING AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS ON
BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL
COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA FOR
LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
THIS IS A ROADWAY PROJECT.
BID BOND IS REQUIRED.
NAME OF BIDDER
ADDRESS OF BIDDER
DJ00581 R-2530BA
Stanly
PROPOSAL FOR THE CONSTRUCTION OF
CONTRACT No. DJ00581 IN STANLY COUNTY, NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION,
RALEIGH, NORTH CAROLINA
The Bidder has carefully examined the location of the proposed work to be known as Contract No. DJ00581; has carefully
examined the plans and specifications, which are acknowledged to be part of the proposal, the special provisions, the
proposal, the form of contract, and the forms of contract payment bond and contract performance bond; and thoroughly
understands the stipulations, requirements and provisions. The undersigned bidder agrees to bound upon his execution of
the bid and subsequent award to him by the Department of Transportation in accordance with this proposal to provide the
necessary contract payment bond and contract performance bond within fourteen days after the written notice of award is
received by him. The undersigned Bidder further agrees to provide all necessary machinery, tools, labor, and other means
of construction; and to do all the work and to furnish all materials, except as otherwise noted, necessary to perform and
complete the said contract in accordance with the 2024 Standard Specifications for Roads and Structures by the dates(s)
specified in the Project Special Provisions and in accordance with the requirements of the Engineer, and at the unit or lump
sum prices, as the case may be, for the various items given on the sheets contained herein.
The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the work
and required labor to construct and complete Contract No. DJ00581 in Stanly County, for the unit or lump sum prices, as
the case may be, bid by the Bidder in his bid and according to the proposal, plans, and specifications prepared by said
Department, which proposal, plans, and specifications show the details covering this project, and hereby become a part of
this contract.
The published volume entitled North Carolina Department of Transportation, Raleigh, Standard Specifications for Roads
and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into and made
a part of this contract; that, except as herein modified, all the construction and work included in this contract is to be done
in accordance with the specifications contained in said volume, and amendments and supplements thereto, under the
direction of the Engineer.
If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer or
such other person as may be designated by the Secretary to sign for the Department of Transportation. The conditions and
provisions herein cannot be changed except over the signature of the said Contract Officer or Division Engineer.
The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as the
basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any item or portion
of the work as may be deemed necessary or expedient.
An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease in the
unit prices, nor in the time allowed for the completion of the work, except as provided for the contract.
Accompanying this bid is a bid bond secured by a corporate surety, or certified check payable to the order of the Department
of Transportation, for five percent of the total bid price, which deposit is to be forfeited as liquidated damages in case this
bid is accepted and the Bidder shall fail to provide the required payment and performance bonds with the Department of
Transportation, under the condition of this proposal, within 14 calendar days after the written notice of award is received by
him, as provided in the Standard Specifications; otherwise said deposit will be returned to the Bidder.
DJ00581 R-2530BA
Stanly
COVER SHEET
PROPOSAL SHEET
TABLE OF CONTENTS
PROJECT SPECIAL PROVISIONS
BOND REQUIREMENTS: ........................................................................................................ G-1
CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits): ..................................... G-1
INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES: ....... G-2
NO MAJOR CONTRACT ITEMS:............................................................................................ G-5
NO SPECIALTY ITEMS: .......................................................................................................... G-5
FUEL AND ASPHALT PRICE ADJUSTMENT: ..................................................................... G-5
MINORITY BUSINESS ENTERPRISE AND WOMEN BUSINESS ENTERPRISE
(DIVISIONS):............................................................................................................................. G-5
BIDS OVER LIMIT: ................................................................................................................ G-20
USE OF UNMANNED AIRCRAFT SYSTEM (UAS): .......................................................... G-20
EQUIPMENT IDLING GUIDELINES:................................................................................... G-21
TWELVE MONTH GUARANTEE: ........................................................................................ G-22
OUTSOURCING OUTSIDE THE USA: ................................................................................. G-22
ROADWAY .................................................................................................................................R-1
STANDARD SPECIAL PROVISIONS
AVAILABILITY OF FUNDS – TERMINATION OF CONTRACTS ..................................SSP-1
ERRATA..................................................................................................................................SSP-2
PLANT AND PEST QUARANTINES ...................................................................................SSP-4
MINIMUM WAGES ...............................................................................................................SSP-5
TITLE VI AND NONDISCRIMINATION: ...........................................................................SSP-6
ON-THE-JOB TRAINING ....................................................................................................SSP-15
PROPOSAL ITEM SHEET
ITEM SHEET(S)
DJ00581 R-2530BA
Stanly
INSTRUCTIONS TO BIDDERS
PLEASE READ ALL INSTRUCTIONS CAREFULLY
BEFORE PREPARING AND SUBMITTING YOUR BID.
All bids shall be prepared and submitted in accordance with the following requirements.
Failure to comply with any requirement may cause the bid to be considered irregular and
may be grounds for rejection of the bid.
For preparing and submitting the bid electronically, refer to Article 102-8(B) of the Standard
Specifications.
Bidders that bid electronically on Raleigh Central-Let projects will need a separate Digital
Signature from the approved electronic bidding provider for Division Contracts.
ELECTRONIC ON-LINE BID:
1. Download entire proposal from Connect NCDOT website. Download the electronic submittal
file from the approved electronic bidding provider website.
2. In accordance with Article 102-3 of the Standard Specifications, registration on the Interested
Parties List is required unless SP1 G02 Interested Parties List Not Required provision is
included in the proposal.
3. Prepare and submit the electronic submittal file using the approved electronic bidding provider
software.
4. Electronic bidding software necessary for electronic bid preparation may be downloaded from
the
Bid
Express
website
following
the
directions
at:
https://connect.ncdot.gov/letting/Pages/Electronic-Bidding.aspx.
5. Questions should be emailed 7 calendar days prior to the bid opening to Jason Brooks at
jcbrooks@ncdot.gov. Contact with any other NCDOT personnel concerning this project is
strictly prohibited, unless otherwise noted, and may result in bids being considered non-
responsive.
DJ00581 R-2530BA
G-1
Stanly
PROJECT SPECIAL PROVISIONS
GENERAL
All work and materials shall be in accordance with the provisions of the General Guidelines of
this contract, the Project Special Provisions, the North Carolina Department of Transportation
2024 Standard Specifications for Roads and Structure, the North Carolina Department of
Transportation 2024 Roadway Standards Drawings, the current edition of the Manual on
Uniform Traffic Control Devices (MUTCD).
The Contractor shall keep himself/herself fully informed of all Federal, State and local laws,
ordinances, and regulations, and shall comply with the provisions of Section 107 of the Standard
Specifications.
BOND REQUIREMENTS:
(6-1-16)(Rev.1-16-24)
102-8, 102-10
SPD 01-420A
A Bid Bond is required in accordance with Article 102-10 of the Standard Specifications for Roads
and Structures.
Contract Payment and Performance Bonds are required in accordance with Article 103-7 of the
Standard Specifications.
CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits):
(7-1-95) (Rev. 5-16-23)
108
SP1 G07 B
The date of availability for this contract is the date the Contractor begins work but not before
February 2, 2026 or later than March 30, 2026.
The completion date for this contract is the date that is Seventy (70) consecutive calendar days
after and including the date of availability.
Except where otherwise provided by the contract, observation periods required by the contract will
not be a part of the work to be completed by the completion date and/or intermediate contract times
stated in the contract. The acceptable completion of the observation periods that extend beyond
the final completion date shall be a part of the work covered by the performance and payment
bonds.
The liquidated damages for this contract are Six Hundred Dollars ($ 600.00) per calendar day.
At the preconstruction conference the Contractor shall declare his expected date for beginning
work. Should the Contractor desire to revise this date after the preconstruction conference, he
shall notify the Engineer in writing at least thirty (30) days prior to the revised date.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.