November 19, 2025
SUBJECT: REQUEST FOR QUOTATION
MEMORANDUM TO PROSPECTIVE BIDDERS
The North Carolina Department of Transportation is requesting bids for the following projects in Division
5:
• ME00107 – Annual Needs – Division 5 Long Line Pavement Markings (Durham, Franklin,
Granville, Person, Vance and Warren Counties)
WBS Element: Various
TIP No.: N/A
Date of Availability: February 8, 2026
Completion Date for all work: February 7, 2027
• DE00423 – 2027 Franklin Resurfacing
WBS Element: 2026CPT.05.04.20351.1, 2026CPT.05.04.20352.1
TIP No.: N/A
Date of Availability: January 12, 2025
Completion Date for all work: July 12, 2027
• DE00424 – Granville Bridge 199
WBS Element: 51609.3.1
TIP No.: HB-0072
Date of Availability: January 21, 2026
Completion Date for all work: April 21, 2027
• DE00425 – 2027 S. Franklin Resurfacing
WBS Element: 2026CPT.05.07.10351.1 , 2026CPT.05.07.20351.1
TIP No.: N/A
Date of Availability: January 10, 2025
Completion Date for all work: July 9, 2027
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION 5 OFFICE
2612 NORTH DUKE STREET
DURHAM, NC 27704
Telephone: (919) 317-4700
Fax: (919) 317-4710
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
2612 NORTH DUKE STREET
DURHAM, NC 27704
• DE00414 – SR 1119 (Holeman Ashley Rd) Pipe Replacement over Lick Creek
WBS Element: DF18405.2073026
Federal Aid No: DF18405.2073026
TIP No.: N/A
Date of Availability: January 7, 2025
Completion Date for all work: January 8, 2027
A mandatory Pre-Bid Conference will be held for project DE00414 at 11:30 A.M. on Wednesday,
December 3, 2025, at the project site located on Holeman Ashley Rd east of Hooten Dr, Timberlake,
NC. We will discuss the scope of the project and give bidders the opportunity to ask any questions.
Attendance at the Pre-Bid Conference is required in order for your bid to be considered. A bid
received from a bidder who has not attended and properly registered at the above scheduled pre-bid
conference will not be accepted and considered for award.
Project documents, including Proposal, plans (if applicable), or any additional information related to the
project can be found on the Division 5 Project Letting website:
https://connect.ncdot.gov/letting/Pages/Division5Letting.aspx
Any firm that wishes to bid as a prime contractor shall be prequalified as a Bidder or PO Prime Contractor
prior to submitting a bid. Information regarding prequalification can be found at:
https://connect.ncdot.gov/business/Prequal/Pages/default.aspx.
In order to receive due consideration, your quotation must be received in this office no later than:
2:00 p.m. on Wednesday, December 10, 2025
For questions regarding Division 5 project lettings, please contact me at 919-707-7391 or at
kncooper@ncdot.gov.
Sincerely,
Kayla Cooper, EI
Division 5 Contract Engineer
//knc
cc: Mark Craig, PE, Division Construction Engineer
Doug McNeal, PE Division Maintenance Engineer
David Moore, Resident Engineer
James Nordan, PE, Resident Engineer
Lisa Bullard-Gilchrist, EI, Bridge Program Manager
Ben Lowry, PE, Resurfacing Program Manager
Jorgelia Nino, Utilization and Compliance Manager