| Location: | Federal |
|---|---|
| Posted: | Nov 19, 2025 |
| Due: | Jan 30, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | C-17_AMC_Airlift_Recapitalization_Strategy |
| Publication URL: | To access bid details, please log in. |
Uninterrupted inter-theater airlift capacity is paramount for global operations during fleet recapitalization. Current recapitalization projections require C-5M viability until 2045 and C-17A viability through 2075.
Next Generation Airlift (NGAL) will replace both the C-5M and C-17A fleets as the next inter-theater airlift platform.
With an accelerated NGAL Analysis of Alternatives (AoA) in FY27 and an uninterrupted acquisition process with consistent funding, the first NGAL aircraft could be produced as early as FY38. It is estimated the NGAL program will reach Initial Operational Capability (IOC) in FY41. One NGAL aircraft will replace one C-5M aircraft until the entire C-5M fleet is retired. Then, the C-17A fleet will be replaced by NGAL at a one-for-one swap.
To mitigate risks associated with acquisition delays, funding uncertainties, or technological challenges, the existing C-5M and C-17A fleets’ operational viability must be maintained until a fully capable replacement is fielded, which may require extending the service life and associated Military Type Certificate (MTC) of each platform.

With GovernmentContracts, you can:
...: Description SOURCES SOUGHT SYNOPSIS The General Services Administration, Office of Fleet Management...
GENERAL SERVICES ADMINISTRATION
Bid Due: 6/17/2026
...delays in fulfilling agency and fleet requirements. INTRODUCTION The NAWCWD Airborne Electronic Attack... ...
DEPT OF DEFENSE
Bid Due: 6/24/2026
...PROPOSAL. Naval Supply Systems Command (NAVSUP) Fleet Logistics Center (FLC) Bahrain intends to ...
DEPT OF DEFENSE
Bid Due: 6/23/2026
...PROPOSAL. Naval Supply Systems Command (NAVSUP) Fleet Logistics Center (FLC) Bahrain intends..., management ...
DEPT OF DEFENSE
Bid Due: 6/23/2026