Murrieta Creek Phase 2B
| Location: |
California |
| Posted: |
Jun 10, 2025 |
| Due: |
Jul 2, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
W912PL25BA004 |
| Publication URL: |
To access bid details, please log in. |
Murrieta Creek Phase 2B
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION SOUTH PACIFIC
Office
W075 ENDIST LOS ANGELES
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Jun 10, 2025 04:03 pm PDT
-
Original Published Date: May 02, 2025 01:42 pm PDT
-
Updated Date Offers Due: Jul 02, 2025 02:00 pm PDT
-
Original Date Offers Due: Jun 04, 2025 02:00 pm PDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Jun 10, 2026
-
Original Inactive Date:
May 02, 2026
-
Initiative:
Classification
Description View Changes
*Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing
Attachments/Links
Contact Information
Contracting Office Address
-
KO CONTRACTING DIVISION 915 WILSHIRE BLVD SUITE 1109
-
LOS ANGELES , CA 90017-3409
-
USA
Secondary Point of Contact
History
Related Document
| Apr 18, 2025 | [Presolicitation (Original)] Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration |
| Apr 21, 2025 | [Presolicitation (Updated)] Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration |
| May 2, 2025 | [Solicitation (Original)] Murrieta Creek Phase 2B |
| May 29, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jun 4, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jun 17, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jul 1, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jul 2, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jul 7, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
Bid Detail Information Bid Number : 214027 Bid Title : SOLICITATION CANCELLED -
Los Angeles County
Bid Due: 12/29/2030
Bid Detail Information Bid Number : RFB-IS-12200418 Bid Title : SOLICITATION CANCELLED -
Los Angeles County
Bid Due: 12/28/2050
Bid Detail Information Bid Number : RFB-IS-12200418 Bid Title : SOLICITATION CANCELLED -
Los Angeles County
Bid Due: 12/28/2050
number name issue date due date Quote 17-026?? ? Quote 17-026 HUD Five
Oakland Housing Authority
Bid Due: 11/15/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.