Fermilab -Replacement of EOL water-cooled HVAC system
| Location: |
Illinois |
| Posted: |
Feb 18, 2025 |
| Due: |
Apr 4, 2025 |
| Agency: |
ENERGY, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- 41 - Refrigeration, Air Conditioning and Air Circulating Equip.
|
| Solicitation No: |
RK-365984-ISD |
| Publication URL: |
To access bid details, please log in. |
Fermilab -Replacement of EOL water-cooled HVAC system
Active
Contract Opportunity
Department/Ind. Agency
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
FERMILAB - DOE CONTRACTOR
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
Original Published Date: Feb 18, 2025 11:15 am CST
-
Original Date Offers Due: Apr 04, 2025 03:00 pm CDT
-
Inactive Policy: 15 days after date offers due
-
Original Inactive Date:
Apr 19, 2025
-
Initiative:
Classification
-
Original Set Aside:
-
Product Service Code: 4120 - AIR CONDITIONING EQUIPMENT
-
NAICS Code:
-
238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Batavia
,
IL
60510
USA
Description
This statement of work (SOW) aims to obtain supervision, expertise, labor, materials, and equipment for the work indicated below.
The work will be completed at Proton West 7 (PW7) at the Fermilab facility in Batavia, Illinois. Fermilab is operated by the Fermi Forward Discovery Group (FFDG). FFDG will provide a Task Manager / Construction Coordinator (TM/CC) to oversee the project.
The subcontractor will replace the existing water-cooled HVAC unit at PW7. The subcontractor will purchase and provide the replacement unit. This is an end-of-life replacement of the HVAC system.
The subcontractor will be responsible for all installation, labor, supervision, equipment, measurements, programming, and testing needed to complete this project before turning it over to FFDG.
SCOPE OF WORK
Subcontractor shall perform the following:
-
Mobilize to PW7 FIMS 626
-
The contractor will remove the existing York E#1922 water-cooled cooling-only unit.
-
LOTO (lock out tag out) electrical panel PHP-WB-2-1 Circ.7-9-11.
-
Isolate 2” water lines.
-
Remove existing electrical wiring. Ensure line voltage and control wiring are removed and disposed of as required.
-
Disconnect both supply and return water lines.
-
Disconnect condensate line.
-
Once the unit is completely disconnected, TM/CC will work with an in-house overhead crane technician to assist with the removal.
-
The contractor will provide and install a new 20-ton water-cooled system as indicated below.
-
TM/CC will install a new unit with an in-house overhead crane technician.
-
The contractor will provide vibration pads for the new unit to sit on.
-
The contractor will provide a new 2” Penn refrigeration regulator valve.
-
The contractor will install a 2” Penn valve with a 1/4-inch refrigeration line from the high side of the regulator valve.
-
The contractor will install a refrigeration tee for service and pressure testing.
-
The contractor is to supply all 2” copper and materials necessary to connect the supply and return water lines properly.
-
The contractor will supply and install new insulation on water lines after the leak is checked.
-
The contractor will install a new electrical 460VAC-3 phased, fused disconnect.
-
The contractor must supply appropriately sized fuses to match unit MOCP.
-
The contractor must supply an appropriately sized wire and conduit for the new unit.
-
The contractor will make the final connections and check the phasing.
-
The contractor is to install an FFDG-supplied thermostat.
-
The contractor will install a new 8-wire thermostat wire from the unit to the thermostat.
-
The contractor is to land low-voltage wiring.
-
The contractor must supply proper duct supplies (e.g., a Pair of pants) for adequate amperage and airflow.
-
The TM/CC will provide an in-house overhead crane technician to lift ductwork for final installation.
-
The contractor is to start up the equipment.
-
Provide an amp draw on motors to ensure proper ducting.
-
Adjust the Pen valve to the proper height to ensure an appropriate flow and pressure.
-
The contractor is to fill out manufacturer start-up paperwork.
-
Demobilize, final clean up, and check.
The contractor must provide TM/CC with all manuals and a picture of the manufacturer's nameplate
Attachments/Links
Contact Information
Contracting Office Address
-
Kirk Rd. & Pine St.
-
Batavia , IL 60510
-
USA
Secondary Point of Contact
History
-
Feb 18, 2025 11:15 am CSTSolicitation (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Follow USMEPCOM Low Voltage Cable Removal Active Contract Opportunity Notice ID W9124D26QA266... Chicago ...
DEPT OF DEFENSE
Bid Due: 6/25/2026
...) Bayonet Holder - Copper Bayonet Fuse Holder (Quantity: 3) Low Voltage - ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...* Electrical and Low Voltage PLANS, SPECIFICATIONS AND CONDITIONS OF THE BID WILL ...
Westmont village
Bid Due: 6/08/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.