| Location: | Pennsylvania |
|---|---|
| Posted: | Aug 2, 2026 |
| Due: | Aug 19, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Middletown Township, Bucks County |
| Publication URL: | To access bid details, please log in. |
Project Description: Middletown Township is performing infrastructure and paving work to improve stormwater drainage located on Hillside Avenue. The existing infrastructure is insufficient and residents downhill of Hillside Avenue have had reoccurring flooding issues. This project proposes installing new stormwater pipes and inlets and connecting them to the existing stormwater system, as well as re-grading the roadway to allow for more efficient drainage flow. The scope of work is more fully described in the Project Specifications herein and on the Project Plans.

With GovernmentContracts, you can:
...Project: 2026-W1 - Johnsonburg Municipal Authority - Center Street Transite Pipe Replacement Ref... ...
PennBid
Bid Due: 9/04/2026
...Project: 2026 Lehigh Township Road Program - Timberline Road Reconstruction - Contract 1 ...
PennBid
Bid Due: 9/08/2026
...involves the installation of approximately 410 lineal feet of 15" SLCPP Storm Sewer ...
PennBid
Bid Due: 9/09/2026
...pipe, a chemical feed vault with a chlorine analyzer and sample tap, and ...
PennBid
Bid Due: 9/01/2026