| Location: | Texas |
|---|---|
| Posted: | Jul 8, 2026 |
| Due: | Aug 12, 2026 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2026-025 |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work shall generally consist of but is not limited to all labor, materials, equipment, appurtenances, and incidentals as required to properly install, complete and be accepted in
place the Speegleville Road Lift Station and associated piping, electrical, controls, generator relocation, temporary by-pass system, site improvements, fencing, surface replacement, and
all necessary components as shown on the project drawings and as specified herein.

With GovernmentContracts, you can:
...the facility's aging Electric Motor Control Center (Electrical Main Panel) to ensure operational ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 9/18/2026
...ballistic-rated door and access-control system. The completed assembly shall control public access..., installing ...
Bell County
Bid Due: 10/06/2026
...Follow FEMA Region 6 Electric Motor Control Center Replacement Active Contract Opportunity Notice... ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 9/21/2026
...units, HVAC ductwork and electrical connections, integration with the existing Metasys system, testing... ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 9/21/2026