| Location: | Georgia |
|---|---|
| Posted: | Oct 13, 2026 |
| Due: | Nov 12, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77021-NONST-2027-000000221 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77021-NONST-2027-000000221 | Walnut Grove ES, Central Gwinnett HS, Collins Hill HS & North Gwinnett HS - Roof Replacement | Gwinnett County Public Schools |
Oct 13, 2026 @ 02:12 PM
|
Nov 12, 2026 @ 03:00 PM
|
Start Date: Oct 13, 2026 @ 02:12 PM ET
End Date:
Nov 12, 2026 @ 03:00 PM ET
INVITATION TO BID: Sealed bids will be received from bidders by the ***GWINNETT COUNTY BOARD OF EDUCATION, 53 GWINNETT DRIVE, LAWRENCEVILLE, GEORGIA, 30046, CONFERENCE ROOM BUILDING -C-*** Until 3:00 PM, November 12, 2026 for construction of the following ***WALNUT GROVE ELEMENTARY SCHOOL, REROOFING - BLDG 2011, 75 TAYLOR RD, SUWANEE, GA 30024; CENTRAL GWINNETT HIGH SCHOOL, REROOFING - BLDG 5041, 564 W CROGAN ST, LAWRENCEVILLE, GA 30046; COLLINS HILL HIGH SCHOOL, REROOFING - BLDG 5011, 50 TAYLOR RD, SUWANEE, GA 30024; NORTH GWINNETT HIGH, REROOFING - BLDG 5080, 20 LEVEL CREEK RD NW, SUWANEE, GA 30024*** Bids will be publicly opened and read aloud. Interested parties are invited to attend. Fax transmittals and emails of Bid Proposal Forms will not be accepted by the Owner. No proposal will be accepted after time is called. No phone will be available.
| Code | Description |
| 91066 | Roofing, Gutters, and Downspouts Maintenance and Repair Services |
| 91036 | Heating, Air Conditioning, and Ventilation Maintenance, Repair and Installation Services |
Chris Caudle
ccaudle@husseygaybell.com
7709231600
While bidders are not required to be licensed General Contractors all bidders must be licensed
in the State of Georgia and furnish to the Architect a completed Contract's Qualification
Statement (AIA Document A305) to be evaluated by Owner and Architect prior to obtaining
bidding documents. Plans and Specifications will not be released prior to approval.
Bidders who do not submit the A305 Statement will be subject to disqualification. The A305 must
show the Contractor's ability to complete the Contract in a satisfactory manner on projects of similar
scope and complexity. References from past clients and projects must be included and will be
verified.
As part of the pre-qualification process, a mandatory Pre-Bid Conference will be held
on October 29, 2026, beginning at 9:00 a.m. The conference will begin at North Gwinnett High
School, 20 Level Creek Rd NW, Suwanee, GA 30024, then to Collins Hill High School, 50
Taylor Rd, Suwanee, GA 30024, then to Walnut Grove Elementary School, 75 Taylor Rd,
Suwanee, GA 30024, and concluding at Central Gwinnett High School, 564 W Crogan St,
Lawrenceville, GA 30046. Failure to attend the Pre-Bid Conference will result in disqualification of
the bidder. Representative must be Project Manager or Estimator directly responsible for the bidding
of this project. No new bidders will be added after the Pre-Bid Conference. Any bidder may be
required, at the discretion of the Owner, to furnish evidence that the proposed subcontractors have
sufficient means and experience in the types of work indicated to insure completion of the work in a
satisfactory manner.
Any bidder that is disqualified may respond to the Owner in writing within twenty (20) days of the
Notice of Disqualification indicating why said Bidder feels the disqualification is unfounded. The
written appeal from the disqualified bidder will not change the decision already made on this project;
however, a favorable appeal may open the way for the bidder in question to bid on future Gwinnett
County School System projects. In any case, the Owner's decision shall be deemed final.
Time is of the essence. A written Notice to Proceed will be issued after the Pre-Construction
Conference upon acceptance and approval of all Contracts, Bonds, Insurance, etc. Contractor shall
mobilize within ten (10) days of the date of the written Notice to Proceed. The start date for the
work will be May 27, 2027. All work outlined in the Contract Documents must be substantially
complete by July 23, 2027.
The Owner will make payments to the successful Contractor upon receipt of Requests for Payment,
approved by the Architect, as fully covered and shown in the Contract Documents. Retainage and
described in the specifications and General Conditions of the Contract will be withheld.
The above description is an advertisement for submission of bids; bids are to be considered as offers
for performance of work by the submitting party. The Owner reserves the right to accept or reject
any or all bids and to waive technicalities.
BY:
GWINNETT COUNTY BOARD OF EDUCATION
END OF SECTION 001116
INVITATION TO BID 001116 - 2
Gwinnett County Schools - Re-Roofing - Construction Documents - 10-13-2026
Hussey Gay Bell 626 1030 (59/60/61/62)
INVITATION TO BID 001116 - 3
Gwinnett County Schools - Re-Roofing - Construction Documents - 10-13-2026
Hussey Gay Bell 626 1030 (59/60/61/62)

With GovernmentContracts, you can:
Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract
DEPT OF DEFENSE
Bid Due: 11/18/2026
Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 11/25/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006
State Government of Georgia
Bid Due: 11/23/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047
State Government of Georgia
Bid Due: 11/19/2026