RMC System Upgrade and Integration Project - RFP

Location: Pennsylvania
Posted: Aug 27, 2026
Due: Oct 7, 2026
Agency: PennBid
Type of Government: State & Local
Category:
  • 63 - Alarm, Signal, and Detection Systems
Solicitation No: Delaware County Solid Waste Authority, PA
Publication URL: To access bid details, please log in.
Project: RMC System Upgrade and Integration Project - RFP
Ref. #: Delaware County Solid Waste Authority, PA
Type: RFP
Status:
Open
Open Date: Aug 27th 2026, 12:00 PM EDT
Questions Due Date: Sep 30th 2026, 2:00 PM EDT
Close Date: Oct 7th 2026, 2:00 PM EDT
Contract Type:
Term Contract
County, State:
Berks County, PA

Project Description: DCSWA currently manages landfill operations through decentralized sensors and alarms, all of which are local-only indicators. With facility growth and aging systems, a need for a unified, scalable RMC platform has become critical to enable real-time management, emergency responsiveness, historical analytics, and improved regulatory compliance.
The primary goals and objectives for the new Landfill RMC System
Centralized Monitoring and Control: Provide a single, integrated platform for real-time monitoring and control of various landfill systems and processes.
Enhanced Data Availability: Ensure that operational data is readily accessible by authorized personnel for informed decision-making.
Improved Alarm Management: Implement a robust alarm system that notifies appropriate personnel promptly and allows for efficient tracking and resolution of alarms.
Historical Data Logging and Reporting: Collect, store, and provide tools for analyzing historical operational data, and generate automated reports for operational insights and regulatory compliance.
Scalability: Design an RMC system that can be easily expanded to accommodate future growth of the facility and integration of new technologies and monitoring points.
Reliability and Redundancy: Ensure high system availability and data integrity through appropriate redundancy measures.
Security: Implement robust cybersecurity measures to protect the RMC system from unauthorized access and cyber threats.
User-Friendliness: Provide an intuitive and easy-to-use interface for operators and other users.
Scope of Work
Design and Engineering
Equipment Procurement and Installation
Programming and Integration
Post-installation support
The selected Proposer (hereinafter referred to as "the Integrator") shall provide a turnkey RMC system solution.
General RMC System Architecture
Open, non-proprietary communication protocols (e.g., DNP3, Modbus TCP/IP, Ethernet/IP, Sparkplug B, MQTT, OPC UA) is required.
The RMC system must be designed for high availability and reliability (i.e. 99%).
The Integrator shall provide Deliverables
Detailed Design Document, network diagram, red line markups on existing infrastructure.
All specified hardware (Cellular modem, routers, etc.) and software including licenses (where applicable).
Fully installed and commissioned RMC system.
Comprehensive training for personnel.
Warranty and support services as specified.
Approach to meeting the monitoring, control, alarming, historian, and reporting requirements.
Description of HMI design philosophy and sample screen mock-ups (if possible)
All code related to programming of PLC/HMI units.
General RMC System Design and Implementation
Provide secure, real time, browser-based access via desktop devices and Mobile devices
Utilize VPN or equivalent secure remote access methods
User login Credentials for secure access
Real-time monitoring of the points defined herein
Automated alarm callouts to appropriate personnel
Secure encrypted communication protocols
Scalability for future RMC system expansion
Control interlocks (e.g., Tank 1,2,3,4, Wet well high-level alarm will fault all pumps to stop flow of liquid).
Compatibility with the existing PLCs/HMIs (Siemens Simatic s7-1200, Siemens KTP700 Basic)
Maintain full local control and data logging during loss of WAN/cloud connectivity, with automatic synchronization upon reconnection
Monitoring and Control Points
The RMC system shall monitor and control, at a minimum, the following points and systems signals will be from existing PLC units (This list identifies the minimum monitoring and/or control requirements and is not intended to represent an exhaustive list of all points or parameters)
Grit Chamber (1 site): Pump statuses (ON, OFF, FALUT), run times, flow rates, level alarms (high, low, containment), power loss. Control: Interlocks.
Pump House (2 sites) (e.g., SAE Pumphouse): Pump statuses (ON, OFF, FALUT), run times, levels, flow rates, level alarms, power loss, sump pump alarms, gas alarms, door sensors. Control: Interlocks.
Storage Tank (4 sites) (e.g., T001, T002, T003/T004): Pump statuses (ON, OFF, FALUT) tank levels, level alarms (high, low, containment). Control: Interlocks.
Wet Well (1 site): Pump statuses (ON, OFF, FALUT), run times, levels, effluent flow rates, weir flow rates, level alarms, failure alarms, power loss. Control: Interlocks.
Landfill Gas Collection and Control System (LFGCCS) Blower/Flare station parameters (flow, temperature, pressure, runtime, shutdowns, alarms).
Power monitoring (main incomers, generator status).
Screen and Display Configuration
Integrate or develop new HMI interfaces for any site being integrated. (where applicable)
Provide secure web remote access (e.g., view-only mobile client for Apple/Android, VPN for administrative access).
Implement a two-click control for confirmation of change, role-based dashboards (i.e. Hand Run, Restart, etc.).
Intuitive Summary and Data screens, alarm banners, navigation standards, consistent color philosophy, trend displays
ISA-101 HMI design principles
Alarming and Notifications
Integrate existing PLC alarm user-defined setpoints, priorities, and deadbands.
Configure alarms with SMS and email alerts; Provide repeat and escalation functionality.
Provide alarm history logging and reporting.
Allow for editable alarm formats (i.e. configurable alarm delays change parameters, alarm set points, priority).
Alarm audit trail
Designed in accordance with the principles of ANSI/ISA-18.2
Communication and Network Infrastructure
Design and implement a secure and reliable communication network (fiber optic is present at all sites existing, cellular connection backup) connecting all RMC components.
Configure necessary network protocols.
Cellular failover strategy
Training
Provide up to 16 hours of on-site training covering navigation, admin, and configuration tasks. Outline of the Required training program, including topics, duration, and methodology.
- Provide comprehensive training for Authority personnel, including:
- Basic RMC system operation and navigation.
- Alarm management.
- Report generation and data analysis.
- Basic troubleshooting.
Documentation
Deliver full technical documentation; Update system network diagrams; Document all calculations and configurations. PLC backups.
3. PROPOSAL REQUIREMENTS
Proposals shall include:
• Cover Letter
• Executive Summary
• Firm Qualifications (including years of RMC/RMC experience and certifications)
• Project Approach and Methodology
• Cost Proposal
• References from at least 3 similar projects
References Provide a minimum of three (3) client references for similar RMC projects completed within the last five (5) years, preferably in the landfill, wastewater, or industrial sector. Include organization name, contact person, phone number, email address, project description, and project value.
A mandatory on-site pre-bid site visit is required for all Proposers seeking consideration for award. The purpose of the site visit is to provide each Proposer with an opportunity to inspect the existing RMC infrastructure, PLCs, HMIs, communications systems, monitoring locations, pump houses, storage tanks, wet well, landfill gas collection and control system, power monitoring equipment, and other site conditions that may affect the work.
Each Proposer shall be responsible for becoming familiar with existing site conditions, access requirements, available infrastructure, and other conditions that could affect its proposal. Failure to inspect the site shall not relieve the selected Integrator of responsibility for conditions that a reasonable site inspection would have revealed.
Attendance shall be documented by DCSWA. Proposals submitted by firms that do not have documented attendance may be deemed non-responsive and will not be considered for award.

Site Visit: Aug 31-Sept 4, 2026 and Sept 15-25, 2026
Location: Rolling Hills Landfill Administration Building, 583 Longview Road, Boyertown, PA 19512
RSVP/Contact: BBELL@DCSWA.NET/610-367-2373 to schedule a site visit
. SUBMISSION INSTRUCTIONS
- RFP Issue Date: August 26, 2026
- Site Visit (Required): By appointment
- Questions Due: September 30, 2026 by 2pm
- Proposal Due Date: October 7, 2026 by 2pm
- Anticipated Award Date: October 21, 2026
The Authority reserves the right to adjust this schedule at its discretion with or without notice.
All Submissions must completed through PennBid.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Description: West Whiteland Township seeks professional planning, urban design, landscape architecture...

Township of West Whiteland

Bid Due: 10/19/2026

...Description: West Whiteland Township seeks professional planning, urban design, landscape architecture...

Township of West Whiteland

Bid Due: 10/19/2026

...with demonstrated experience in green infrastructure, architecture, engineering, and sustainable building...

PennBid

Bid Due: 11/12/2026

...County, PA Design Firm: Kimmel Architecture Project Description: Sealed bids will be received...

PennBid

Bid Due: 11/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.