Project Description: The scope of work consists of pavement reconstruction within the road right-of-way. The scope of work also includes removal of existing sidewalks, installation of new raised concrete sidewalks and asphalt bike lanes, installation of new curb/gutters, removal/replacement of existing curb ramps and driveway aprons, installation of new pavement striping and markers, adjusting manholes/valves frames and covers where needed, removal/replacement of existing drainlines, waterlines and sewer lines, installation of new catch basins and drain manholes, and removal/replacement of signage and posts.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
Addendum No. 6 STP-3830(006) Lower Main_2.10.26.pdf
|

With GovernmentContracts, you can:
...Day Date Time Area ADD/ / AMD GCA# Project 08/03/26 2:00pm Hawaii 36253-617 ...
General Contractors Association
Bid Due: 8/03/2026
...Day Date Time Area ADD/ / AMD GCA# Project 08/14/26 2:00pm Hawaii 36295-626 ...
General Contractors Association
Bid Due: 8/14/2026
...General Information Line Items Instructions B26003501 BH1624-33 Repair of Asphalt Concrete.../03/2026 02:00 PMDescriptionThe ...
State Government of Hawaii
Bid Due: 8/03/2026
...General Information Line Items Instructions B27000020 BH2642-33 Repair of Asphalt Concrete... to this ...
State Government of Hawaii
Bid Due: 8/14/2026