North Central Missouri Regional Airport Authority, Mobilization, Airport Seeding, New Airport Rotating Beacon and Obstruction Light, etc.

Location: Missouri
Posted: Apr 22, 2026
Due: May 20, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • 62 - Lighting Fixtures and Lamps
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW North Central Missouri Regional Airport Authority, Mobilization, Airport Seeding, New Airport Rotating Beacon and Obstruction Light, etc. 4/22/26 5/20/26

Attachment Preview

SECTION 1
NOTICE TO BIDDERS
NORTH CENTRAL MISSOURI REGIONAL AIRPORT AUTHORITY
NORTH CENTRAL MISSOURI REGIONAL AIRPORT
State Block Grant Project No. 25-030C-1
Sealed bids subject to the conditions and provisions presented herein will be received until 3:00 PM on May 20, 2026,
and then publicly opened and read at 28540 Jetway Road, Brookfield, MO 64628, for furnishing all labor, materials,
equipment and performing all work necessary to construct Airfield Lighting Improvements and associated
improvements.
Copies of the bid documents including project drawings and technical specifications are on file and may be inspected
at:
The Builders’ Association, 3632 W. Truman Blvd., Jefferson City, MO 65109
ConstructConnect, 3825 Edwards Rd., Suite 800, Cincinnati, OH 45209, www.ConstructConnect.com
ePlan Online Plan Room, 1400 Forum Blvd, Suite 7B, Columbia, MO 65203, www.eplanbidding.com
Crawford, Murphy & Tilly, Inc.; One Memorial Drive, Suite 500; St. Louis, MO 63102
A complete set of bid documents may be downloaded free of charge by sending an e-mail request to
hlandon@cmtengr.com with company contact information to be used for the plan holder list. A link to download the
files will then be provided. No official printed set of bidding documents will be provided. Questions regarding bids
shall be directed in writing to Brian Garkie, Project Manager, at Crawford, Murphy & Tilly, Inc. by e-mail at
bgarkie@cmtengr.com. The last day to submit questions shall be May 15, 2026 at 5:00 PM.
A prebid conference for this project will be held at 3:00 PM, Prevailing Central Time, on May 12, 2026 at the North
Central Missouri Regional Airport.
BASE BID
NO. ITEM DESCRIPTION
UNIT QUANTITY
1 C-105-6.1 Mobilization (10% Limit)
LS
1
2 C-105-6.2 Engineer’s Field Office
LS
1
3 T-901-5.1 Airport Seeding
AC
2.0
4 T-908-5.1 Hydraulically Applied Mulching
AC
2.0
5 L-101-5.1 New Airport Rotating Beacon and Obstruction Light
LS
1
6 L-103-5.1 Repaint Airport Beacon Tower
LS
1
7 L-107-5.1 L-807 Wind Cone, Internally LED Lighted, 12-Feet (In-Place)
EA
1
8 L-107-5.2 L-806 LED Supplemental Wind Cone
EA
1
9 L-107-5.3 Remove Existing Wind Cone
LS
1
10 L-108-5.1 1-1/C #8, L-824, Type C, 5KV Cable In 1" Unit Duct
LF
12,000
11 L-108-5.2 2-1/C #8, L-824, Type C, 5KV Cable In 1" Unit Duct
LF
1,800
12 L-108-5.3 1-1/C #8, L-824, Type C, 5KV Cable Installed In Conduit
LF
16,900
13 L-108-5.4 1/C #6 Bare Copper Counterpoise Cable
LF
32,000
14 L-108-5.5 PAPI 18 Circuit, 2-1/C #6 XLP-USE, #6 GND, In 1-1/4" Unit Duct LF
5,200
15 L-108-5.6 PAPI 36 Circuit, 2-1/C #10 XLP-USE, #10 GND, In 1" Unit Duct
LF
1,400
16 L-108-5.7 Beacon Circuits, 4-1/C -#10 XLP-USE, 2-#10 GND, In 1" Unit Duct LF
50
17 L-108-5.8 Wind Cone Circuit 2-1/C #10 XLP-USE, #10 GND, In 1" Unit Duct LF
2,300
18 L-108-5.9 Area Lighting Circuit, 2-1/C #10, #10 GND, In 1" Unit Duct
LF
650
19 L-108-5.10 AWOS Circuit, 2-1/C #10, #10 GND, In 1" Unit Duct
LF
150
20 L-109-7.1 11'-2" X 9'-2" Prefabricated Electrical Vault Shelter
LS
1
21 L-109-7.2 Vault Foundation
LS
1
22 L-109-7.3 Electrical Service Entrance
LS
1
Notice to Bidders
iii
24007077
23 L-109-7.4 L-828, 4 KW Ferroresonant Regulator
EA
1
24 L-109-7.5 L-828, 5 KW Ferroresonant Regulator
EA
1
25 L-109-7.6 L-854 Radio Controller
LS
1
26 L-109-7.7 L-821 Airfield Lighting Control Panel
LS
1
27 L-109-7.8 Remove Existing Electrical Vault Equipment
LS
1
28 L-110-5.1 2" PVC Conduit, Direct Buried
LF
16,900
29 L-110-5.2 4" HDPE Directional Bore
LF
300
30 L-110-5.3 4-4" PVC Concrete Encased Duct Bank
LF
650
31 L-110-5.4 Conduit Drain End Section
EA
10
32 L-110-5.5 Conduit Drain Direct Connection
EA
1
33 L-115-5.1 Electrical Hand Hole
EA
5
34 L-115-5.2 Splice Can
EA
19
35 L-115-5.3 Remove Splice Can
EA
2
36 L-125-5.1 MIRL LED Base Mounted
EA
49
37 L-125-5.2 MITL LED Stake Mounted
EA
173
38 L-125-5.3 MITL LED Base Mounted
EA
19
39 L-125-5.4 Bi-Directional LED Threshold Light Base Mounted
EA
16
40 L-125-5.5 Remove Base Mounted Light
EA
12
41 L-125-5.6 Remove Stake Mounted Light
EA
90
42 L-125-5.7 Install Runway LED PAPI, 4 Box System On New Foundation
EA
1
43 L-125-5.8 Install Runway LED PAPI, 4 Box System On Existing Foundation
EA
1
44 L-125-5.9 Remove Runway PAPI, 4 Box System, Remove Foundation
EA
1
45 L-125-5.10 Remove Runway PAPI, 4 Box System, Foundation To Remain
EA
1
46 L-125-5.11 Install Runway LED REIL System
EA
2
47 L-125-5.12 Remove Runway REIL System
EA
2
48 L-125-5.13 Spare MIRL LED - For Base Mounted Installations
EA
6
49 L-125-5.14 Spare MITL LED - For Stake Mounted Installations
EA
12
50 L-125-5.15 Spare Bi-Directional LED Threshold Light
EA
2
51 SP-1-5.1 25' Area Light Pole And Foundation
EA
3
52 SP-1-5.2 3' Mast Arm And Single Luminaire
EA
4
53 SP-1-5.3 Astronomic Time Clock
EA
1
Contract Time. The owner has established a contract performance time of one hundred twenty six (126) calendar
days from the date of the Notice-to-Proceed. All project work shall be substantially completed within the stated
timeframe. This project is subject to liquidated damages as prescribed in the project manual.
Bid Security. No bid will be considered unless accompanied by a certified check or cashier’s check on any bank or
trust company insured by the Federal Deposit Insurance Corporation, payable to North Central Missouri Regional
Airport Authority, for not less than five (5) percent of the total amount of the bid, or by a bid bond secured by an
approved surety or sureties, payable to the owner, for not less than five (5) percent of the total amount of the bid.
Bonding Requirements. The successful bidder will be required to furnish separate performance and payment bonds
each in an amount equal to 100% of the contract price at the time of contract execution.
Award of Contract. All proposals submitted in accordance with the instructions presented herein will be subject to
evaluation. Bids may be held by the North Central Missouri Regional Airport Authority for a period not to exceed
one hundred twenty (120) calendar days from the date of the bid opening for the purpose of conducting the bid
evaluation.
Award of contract will be based on the lowest aggregate sum proposal submitted from those bidders that are confirmed
as being responsive and responsible. The right is reserved, as the North Central Missouri Regional Airport
Authority may require, to reject any bid and all bids.
Notice to Bidders
iv
24007077
Award of contract is contingent upon the owner receiving Federal-funding assistance under the State Block Grant
Program.
Federal Provisions. This project is subject to the following Federal provisions, statutes and regulations:
Equal Employment Opportunity - Executive Order 11246 and 41 CFR Part 60: The Bidder’s attention is
called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction
Contract Specifications" set forth within the supplementary provisions. The successful Bidder shall not
discriminate against any employee or applicant for employment because of race, color, religion, sex, or national
origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees
are treated during employment without regard to their race, color, religion, sex, or national origin.
Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity:
1. The Bidder’s attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal
Employment Opportunity Construction Contract Specifications" set forth within the supplementary provisions.
2. The goals and timetables for minority and female participation, expressed in percentage terms for the
contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Timetables
Goals for minority participation for each trade: 4.0 %.
Goals for female participation in each trade: 6.9%.
These goals are applicable to all of the contractor's construction work (whether or not it is Federal or federally-
assisted) performed in the covered area. If the contractor performs construction work in a geographical area
located outside of the covered area, it shall apply the goals established for such geographical area where the work
is actually performed. With regard to this second area, the contractor is also subject to the goals for both its
federally involved and non-federally involved construction.
The contractor’s compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on
its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the
specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female
employment and training must be substantially uniform throughout the length of the contract, and in each trade,
and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.
The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project
for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, the Executive Order
and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours
performed.
3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance
Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any
tier for construction work under the contract resulting from this solicitation. The notification shall list the name,
address, and telephone number of the subcontractor; employer identification number of the subcontractor;
estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the
geographical area in which the subcontract is to be performed.
1. As used in this notice and in the contract resulting from this solicitation, the "covered area" is Brookfield,
Linn County, Missouri.
Certification of Nonsegregated Facilities 41 CFR Part 60: A certification of Nonsegregated Facilities must
be submitted prior to the award of a federally-assisted construction contract exceeding $10,000 which is not
exempt from the provisions of the Equal Opportunity Clause.
Contractors receiving federally assisted construction contract awards exceeding $10,000 which are not exempt
from the provisions of the Equal Opportunity Clause will be required to provide for the forwarding of the notice
to prospective subcontractors for supplies and construction contracts where the subcontracts exceed $10,000 and
are not exempt from the provisions of the Equal Opportunity Clause. The penalty for making false statements in
offers is prescribed in 18 U.S.C. 1001.
Notice to Bidders
v
24007077
Disadvantaged Business Enterprise 49 CFR Part 26: The requirements of 49 CFR Part 26, Regulations of
the U.S. Department of Transportation, apply to this contract. It is the policy of MoDOT and the (City or County)
to practice nondiscrimination based on race, color, sex or national origin in the award or performance of this
contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals regardless of their
business size or ownership. Awards of this contract will be conditioned upon satisfying the requirements of this
section. These requirements apply to all bidders, including those who qualify as a DBE. The owner’s award of
this contract is condition upon the bidder satisfying the good faith effort requirements of 49 CFR §26.53. A DBE
contract goal of zero percent (0%) has been established for this contract. The non-DBE bidder shall subcontract
a minimum of zero percent (0%) percent of the dollar value of the base bid(s), excluding any additive alternates,
to disadvantaged business enterprises (DBE) or make good faith efforts to meet the DBE contract goal. The
bidder and any subcontractor who qualifies as a DBE who subcontracts work to another non-DBE firm must
subtract the amount of the non-DBE contract from the total DBE work counted toward the goal, as defined in 49
CFR Part 26.55.
The apparent successful competitor will be required to submit the following information as a condition of bid
responsiveness: (1) the names and addresses of DBE firms that will participate in the contract; (2) a description
of the work that each DBE firm will perform; (3) the dollar amount of the participation of each DBE firm
participating; (4) written statement from bidder that attests their commitment to use the DBE firm(s) listed under
(1) above to meet the owner’s project goal; and (5) if the contract goal is not met, evidence of good faith efforts
undertaken by the bidder, as described in Appendix A to 49 CFR Part 26.
The apparent successful competitor must provide written confirmation of participation from each of the DBE
firms listed in their commitment with the proposal documents as a condition of bid responsiveness.
Davis-Bacon Act, as amended 29 CFR Part 5: The Contractor is required to comply with wage and labor
provisions and to pay minimum wages in accordance with the current schedule of wage rates established by the
United States Department of Labor included in the supplementary provisions.
In addition, the contractor will also be required to comply with the wage and labor requirements and pay minimum
wages in accordance with the schedule of wage rates established by the Missouri Division of Labor Standards
included in the Supplementary Provisions.
The highest rate between the two (Federal and State) for each job classification shall be considered the prevailing
wage.
Debarment, Suspension, Ineligibility and Voluntary Exclusion 49 CFR Part 29: The bidder certifies, by
submission of a proposal or acceptance of a contract, that neither it nor its principals are presently debarred,
suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this
transaction by any Federal department or agency.
Foreign Trade Restriction 49 CFR Part 30: The Bidder and Bidder’s subcontractors, by submission of an
offer and/or execution of a contract, is required to certify that it:
a. is not owned or controlled by one or more citizens of a foreign country included in the list of countries
that discriminate against U.S. firms published by the Office of the United States Trade Representative
(USTR);
b. has not knowingly entered into any contract or subcontract for this project with a person that is a citizen
or national of a foreign country on said list, or is owned or controlled directly or indirectly by one or more
citizens or nationals of a foreign country on said list; or
c. has not procured any product nor subcontracted for the supply of any product for use on the project that
is produced in a foreign country on said list.
Buy American Certificate Aviation Safety and Capacity Act of 1990: This contract is subject to the “Buy
American Preferences” of the Aviation Safety and Capacity Act of 1990. Prospective Bidders are required to
certify that steel and manufactured products have been produced in the United States and to clearly identify those
items produced or manufactured outside of the United States.
Notice to Bidders
vi
24007077
Additional Provisions:
Modification to the project documents may only be made by written addendum by the Owner or Owner’s
authorized Representative.
The proposal must be made on the forms provided within the bound project manual. Bidders must supply all
required information prior to the time of bid opening.
Notice to Bidders
vii
24007077
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Number: 4847 Bid Title: 4847 Holiday Lighting and Decorating Category: Miscellaneous -

City of St. Charles, Missouri

Bid Due: 6/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.