| Location: | North Carolina |
|---|---|
| Posted: | Aug 3, 2026 |
| Due: | Aug 11, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | PANMCC051878 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Contractor must perform the following work and meet specifications:
Mobile Marksmanship Training Simulator (MMTS) –
. Replace (40) LS17 Gaming Computer with newer version.
. Install and upgrade (20) LS Short Throw Video Projector.
. Repair (80) M4 Rechargeable PEQ.
. Repair/replace (160) M4 magazine round counter.
. (20) Counting Mag Charging Dock, (16Mag)
. (20) Screen 14’
. (40) CO2 Refill Adapters
. (20) Round Trip Freight
. Labor
. Five-year extended warranty (15SEPT26-14SEPT31)
The contractor must conduct a system survey for all 20 PLFS units to assess current hardware and operational deficiencies.
The contractor must perform technology refreshes, including all necessary hardware upgrades and repairs, to bring systems to current operational standards.
The contractor must provide a 5-year extended warranty for all upgraded systems, covering labor, repairs, and replacements for failures due to defective material or workmanship.
The contractor must provide periodic courseware updates aligned with TC 3-22.40 Army qualification standards at no additional cost under the warranty agreement.
Clean up after Servicing: The Contractor must remove all trash, debris, or surplus materials from the work site during and at the end of each workday and must leave the work site clean of all debris when work is completed.
Project completion for the Project is estimated to be 30 calendar days from receipt of the Notice to Proceed (NTP), which includes travel, staging, execution, and quality assurance.
Government Materials – No Government-furnished materials are provided. The Contractor is responsible for providing all equipment, materials, and PPE. The Contractor may request approval to use GSA or other Government supply sources if
needed.
Inspection: The Contractor must notify the Contracting Officer's Representative (COR) no later than two (2) days prior to starting work on each MMTS or major system phase.
Warranties: The Contractor must provide a warranty of one (1) year on workmanship for all labor performed. Additionally, a five (5) year extended warranty will be applied to all PLFS systems covering hardware and software reliability, repair, and replacement
due to defects.

With GovernmentContracts, you can:
Bid Title: EAST WILLIAMS LOWER Substation Structural & Electric Materials Category: Utility Construction
Town of Apex
Bid Due: 8/21/2026
D6D1.SBE.008 SBE Light Duty Maintenance Crew - Various Routes - Robeson D6D1.SBE.008 -
Division of Highways
Bid Due: 8/05/2026
July 24, 2026 | Advertisements Advertisement for Bids - Avent Ferry Technology Center
North Carolina State University
Bid Due: 8/18/2026
Follow Appalachian Ranger District Office and Work Center Janitorial Services Active Contract Opportunity
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/20/2026