| Location: | North Carolina |
|---|---|
| Posted: | Jan 23, 2025 |
| Due: | Feb 7, 2025 |
| Agency: | University of North Carolina at Chapel Hill |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bingham Facility 2 is currently served by two 100% outside air DX cooling/propane gas heating units located on the building roof. The units were designed to condition 8000 CFM to maintain an indoor temperature to 70-74F. This project will replace the current systems with a system to be able to maintain required conditions. The new system will include design and installation of a new air-cooled chiller and a new propane hot water boiler as part of this project.
Pre-proposal Meeting is on 1/24/2025 at 1 p.m. via ZOOM.
https://unc.zoom.us/j/91751365891
Meeting ID: 917 5136 5891
Project Brief (opens new window)
Submit Letters of Interest and Current SF-330 to:
Kyle Hawkins, PE
UNC-Chapel Hill
Facilities Planning & Design
Giles F. Horney Building
103 Airport Drive
Chapel Hill, NC 27599
Advertisement Type: Designer Solicitations

With GovernmentContracts, you can:
...Description: Eastern Correctional Institution - Chiller, Boiler & Water Heater Replacement... of: Eastern ...
State Government of North Carolina
Bid Due: 7/09/2026
...Solicitation Number: Doc2203469765 Project Title: 52-2074129806-DAC-Warren CI-Boiler Repairs... of three (3) defective heat ...
State Government of North Carolina
Bid Due: 6/16/2026