Alabama Port Authority
Specification Booklet
Project Name
Location
Project # 11847
McDuffie 43E Low Voltage Switchboard
Mobile, AL
TASK# 2
October 2026
ii | P a g e
BID
DOCUMENTS
INDEX
INVITATION FOR BIDS…………………………………………………………………………………1
INSTRUCTIONS TO BIDDERS ................................................................................................ 3
PROPOSAL .............................................................................................................................. 4
BID BOND ................................................................................................................................ 7
AFFIDAVIT AND CERTIFICATE OF COMPLIANCE… ............................................................. 9
LOW VOLTAGE SWITCHGEAR SPECIFICATION
(15 PAGE ATTACHMENT)
Alabama Port Authority
Specification Booklet
Project Name
Location
McDuffie 43E Low Voltage Switchboard
Mobile, AL
Project # 11847 TASK# 2
October 2026
1|Pag e
INVITATION TO BID
Sealed bid proposals will be received via courier to the Alabama Port Authority, 1400 Alabama State Docks
Blvd., Room 216, Administration Building, Mobile, AL 36602 no later than 1:30 P.M., on Thursday,
November 12, 2026. Sealed bid proposals can also be hand delivered from 1:45 P.M. to 2:00 P.M., on
Thursday, November 12, 2026 to the Alabama Port Authority International Trade Center Lobby, 250 North
Water Street, Mobile, AL. Faxed or electronic submitted bids will not be accepted.
McDuffie 43E Low Voltage Switchboard
Mobile, Alabama
This Requisition solicits proposals to furnish 480/277 volt switchboard for building 43 East at McDuffie
Coal Terminal in Mobile, Alabama for the Alabama Port Authority (APA) as shown in the attached Low
Voltage Switchboard Specification. Work will be in accordance with the requirements stated herein,
attached insurance requirements, all referenced documents, and applicable State of Alabama Laws. The
Contractor will be required to supply a delivery schedule with their bid and associated liquidated
damages will be applied based on the provided schedule. ASPA reserves the right to choose the best value
based on a combination of price and schedule. Proposals shall be valid for 60 calendar days.
Specifications, proposal forms, bid bond forms, and plans are available on the Alabama Port Authority
website at www.alports.com. For additional project and contractual information, please contact the
APA Project Manager, Pete Olivero at (251) 622-2688 (email to pete.olivero@alports.com ). For
technical information, please contact Taylor Williams at Taylor.Williams@AllianceEngr.com c.c.
pete.olivero@alports.com
Each Bidder shall satisfy oneself as to the character, quality, and quantities of work to be performed,
and as to the requirements of the proposed contract. The submission of a proposal shall be proof
that the bidding Contractor has made such examination and is satisfied as to the conditions to be
encountered in performing the work and as to the requirements of the proposed Contract.
APA will utilize its sales tax exemption status on this project. The Contractor will be responsible for
the purchase of all materials and will be required to apply for sales and use tax certificate of exemption
upon contract award.
Due to the time needed to determine the best value based on price and schedule, bids will NOT be
publicly opened. We intend to let the selected bidder know that we intend on proceeding with award
within 10 days of receipt of the bids. The right is reserved, as the interest of the Alabama Port Authority
may require, to reject any and all bids and to waive informalities in bids received. In the event no bid
represents a viable combination of price and schedule, the Alabama Port Authority reserves the right to
solicit submission of a best and final offer from the pool of existing bidders.
Alabama Port Authority
Specification Booklet
Project Name
Location
Project # 11847
McDuffie 43E Low Voltage Switchboard
Mobile, AL
TASK# 2
October 2026
2|Page
IMPORTANT NOTICE TO CONTRACTORS REGARDING EMPLOYMENT PRACTICES: Effective October 1,
2011, the Beason-Hammon Alabama Taxpayer and Citizen Protection Act (“the Act”) requires that any
business entity contracting with or providing any grant or incentives to the state, including the Alabama
Port Authority, certify compliance with the Act. All Contractors must certify such compliance by executing
the enclosed “Certificate of Compliance” and returning it to the Alabama Port Authority with your
proposal. In addition, the company shall submit with their proposal evidence that the company is enrolled
in the E-Verify system. The following E-Verify website link is provided for convenience:
http://www.dhs.gov/files/programs/gc_1185221678150.shtm.
IMPORTANT NOTICE TO CONTRACTORS REGARDING ACCESS TO ASPA RESTRICTED FACILITIES:
All individuals performing any work in McDuffie Terminal must have a valid Transportation Worker
Identification Credential (TWIC) card, ASPA badge and an ASPA vehicle decal with no exceptions.
Information regarding ASPA’s access policy is provided on the ASPA website at the link below.
https://www.alports.com/port-access
Time is an essential element in the Contract. Therefore, for each day the equipment delivery is delayed
beyond the delivery date specified in the schedule provided by the bidder with their bid, $100.00 shall be
paid by the Contractor to ASPA as liquidated damages for the loss sustained by the State because of failure
of the Contractor to complete the work within the specified time.
Subsequent to the final acceptance of this project by the APA project manager, the following
requirements must be satisfied by the Contractor before final payment can be made.
The Contractor must execute copies of CONTRACTOR'S AFFIDAVIT OF PAYMENT OF CLAIMS AND DEBTS
on the form furnished by the Engineer.
a) The Contractor must furnish a letter on his letterhead acknowledging that acceptance of final
payment by the Contractor constitutes a waiver of all claims, present or future, in connection with
this project.
b) The Contractor must furnish a written guarantee on his letterhead covering all defects in material
and workmanship for a period of not less than two (2) years commencing on the date of final
acceptance.
c) If any purchased items have been incorporated in the work, the Contractor must furnish a letter
on his letterhead assigning those warranties to the OWNER. Copies of said warranties shall be
bound in one binder and submitted along with the letter assignment.
Alabama Port Authority
Specification Booklet
Project Name
Location
Project # 11847
McDuffie 43E Low Voltage Switchboard
Mobile, AL
TASK# 2
October 2026
INSTRUCTIONS TO BIDDERS
3|Page
1.0 ADDENDA AND INTERPRETATIONS
All questions about the meaning or intent of the Contract Documents shall be submitted to the Engineer
in writing. Replies will be issued by Addenda emailed to all parties recorded as having received the bidding
documents. All addenda so issued shall become part of the Contract Documents. Only questions answered
by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without
legal effect. Deadline for submitting questions is Thursday, October 29, 2026 at 4pm CST.
2.0 SUBMISSION OF PROPOSALS
Before submitting their proposal, the Contractor shall comply with the following:
(a) The Proposals, including the acknowledgement of addenda, shall be filled in ink on the form
provided herein and all blank spaces in the form shall be fully filled. The signature shall be in
long hand and the complete form shall be without interlineations, alteration or erasure.
(b) Attach a certified check or Bid Bond in the amount of 5% of the Proposal, but not more than
$10,000 made payable to the Alabama Port Authority.
(c) Certificate of Compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act
(see page I-9)
(d) Delivery schedule
One copy of Item (a) through (d) should be placed in a sealed envelope with the bidder’s name, the project
name and number, and the time and date of bid opening shown on the outside.
All submissions, including hand-delivered packages, US Postal Service express mail, or private delivery
service must be delivered to the following individual at the following address in accordance with the
Invitation to Bid. Bids will not be publicly opened.
Alabama Port Authority
Pete Olivero, P.E., Sr. Facilities Engineer
1400 Alabama State Docks Boulevard,
Administration Building, Suite 216
Mobile, AL 36602
(251) 622-2688
Neither fax nor email submissions will be accepted. Respondents are responsible for effective delivery by
the above deadline, and late submissions will be rejected without opening and returned to the sender.
APA accepts no responsibility for misdirected or lost proposals.