| Location: | Vermont |
|---|---|
| Posted: | Apr 22, 2026 |
| Due: | May 13, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Request for Proposal Locations: Essex Keywords: Plumbing and Heating, Construction (Non Building), Water Treatment, General Contractor Bid Description: The Town of Brighton is soliciting bids from qualified contractors with high pressure lines. The purpose of this project is to ensure the safe closure of a line to prevent future flooding. Project Background There is an abandoned lead service line connected with a gooseneck to the watermain. This froze and ruptured in January of 2025, resulting in flooding of the immediate vicinity on Cross Street. The line has a temporary cap which was placed in the spring of 2025. The line requires removal from the main line. Possible challenges of project to include: Identifying if goose neck is lead soldered or threaded; possibility of gate valve closure failure and expanded contamination of main line. Scope of Work • Coordination with Digsafe • Location and mapping of existing utilities in the project area • Contractor must be familiar with high risk, tight digs, and preferably have experience with jetting capabilities. • Must use certified flagging company during any work within the roadway • Coordination with Vermont Electric Coop to stabilize a utility pole adjacent to project area • Coordination with H2O innovation for water shut off and relieve pressure from system • Removal of abandoned pipe off mainline • Perform all pressure testing and backfill of area to ensure stabilization and future integrity of line • Coordinate line flushing and boil water notice with businesses, operators, and board. • Complete cleanup and site preparation for concrete, topsoil, seed and hay. • Be sure to advise H2O Innovation when water quality testing is needed • Use of Trench Box is required at the dig site Cleanup and Final Inspection • Remove all equipment, debris, and materials from the site. • Prepare area for reseeding of grass or cement work as needed • Conduct a final inspection with the Town of Brighton representative and H2O Innovation Special Considerations Project must be completed by July 1 or started after July 6 due to July 4th celebration planned in the park
|
||||||||||||||||||||

With GovernmentContracts, you can:
OCS_RFP_Feasibility_Study Request Date: 8/31/2026 2:32:30 PM Open Date: Closing Date: 10/12/2026 4:30 PM
State Government of Vermont
Bid Due: 10/12/2026
BID - TANDEM VIBRATORY ASPHALT ROLLER Request Date: 9/1/2026 11:35:35 AM Open Date:
State Government of Vermont
Bid Due: 9/25/2026
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER RFP 143 Mental
State of Vermont
Bid Due: 10/16/2026
Sunrise Drive Shoreline Bioengineering Project Request Date: 9/17/2026 10:13:53 AM Open Date: 9/17/2026
State Government of Vermont
Bid Due: 10/07/2026