Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project

Location: Federal
Posted: Aug 25, 2026
Due: Aug 28, 2026
Agency: San Antonio Water System
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: CO-00862-MM
Publication URL: To access bid details, please log in.
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project
Solicitation No. CO-00862-MM


Job No.        21-7007

Status: Currently Accepting Submissions

Due Date: 2:00 PM Friday, 8/28/26


Estimated Budget: $7,200,000.00

ADDENDUM 3 POSTED

INVITATION TO BIDDERS

Solicitation No. CO-00862

Sealed proposals are requested by the San Antonio Water System for the construction of approximately 30 LF of 6-inch, 48 LF of 8-inch, 2,370 LF of 12-inch, 6,953 LF of 16-inch, and 10 LF of 24-inch DI pipe via open cut, 1,043 LF of 24-inch to 30-inch steel casing installed by jacking or boring, surface restoration including pavement replacement, and all other associated appurtenances as included in the Contract Documents for the Toutant-Beauregard Rd Water Main Project, SAWS Job No. 21-7007.

Additionally, the proposal includes the construction of approximately 55 LF of 24-inch DI pipe via open cut for the construction of the swing-tie connection from the existing 42” CSC water main located along Wurzbach Parkway to the existing 24” CSC water main located along Evers Road to facilitate maintenance and construction at the Wurzbach Pump Station and Storage Tanks for the Wurzbach Pump Station Valve/Swing Tie Project, SAWS Job No. 21-7007.

To view additional project information, as well as obtain t he plans and sp ecifications for this project, visit our website located at www.saws.org and click on the Business Center.  Then select Bidder, Consultant, and Vendor Registration, which is located on the left-hand side of the screen.  Select the Register Now button and proceed with registration.

For difficulties down loading plans and specifications, contact the Contracting Department at 210- 233-3341.

An in-personnon-mandatory Pre-Bid Meeting will be held at 2:00 PM (CDT) on August 7, 2026.

San Antonio Water System – Headquarters

2800 US Highway 281 North

Tower II, Customer Service Building CR-C145

San Antonio, Texas 78212

For questions regarding this solicitation, technical questions or additional information, please contact Mory Martinez, Contract Administrator in writing via email to: Morayma.Martinez @saws.org until 3:00 PM (CDT) on August 12, 2026 . Answers to the questions will be posted to the web site by 3:00 PM (CDT) on August 20, 2026 August 19, 2026 as a separate document or included as part of an addendum. Please be advised that Bidders are prohibited from communicating with any other SAWS staff, the Consultant, or City of San Antonio officials regarding this IFB up until the contract is awarded as outlined in the Instructions to Bidders.

Bids will be received either Electronically or through Sealed bids, until 2:00 PM (CDT) , on August 28, 2026 August 26, 2026 . Electronic bids will be received via the secure SAWS FTP site. Sealed bids will be received by Contract Administration, 2800 U.S. Hwy 281 North, Tower II, Customer Center Building, via a drop box located on the left wall when walking through the first set of double glass doors of the main Tower II entry on the north side of the building, San Antonio, Texas 78212. See the Electronic Bid Opening Instructions attachment for additional information regarding an electronic bid submittal.  Electronic bids shall be accompanied by a bid bond in an amount not less than five percent of the total bid price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total bid price, SAWS will request this within 24 hours from the apparent low bidder.  Sealed bids must be accompanied by a cashier's check, certified check, or bid bond in an amount not less than five percent of the total bid price. Bids will then be publicly opened and read aloud by Contract Administration via WebEx.

LINK: https://saws.webex.com

Meeting Number: 2492 124 5100

Meeting Password: CO-00862

Join by Phone: 210-233-2090

If Bidders intend to submit bids electronically, Bidders will need to submit a request by 2:00 PM (CDT), on August 27, 2026 August 25, 2026 to receive access to the File Transfer Protocol (FTP) site via email to Morayma.Martinez @saws.org . Bidder’s email requesting access to the FTP site shall provide the legal name of Bidder’s company and the intended recipient’s email address and phone number.  No requests for FTP site access will be accepted after 2:00 PM (CDT), on August 27, 2026 August 25, 2026 .


Non-Mandatory
Pre-Bid

Meeting 2:00 PM, Friday Aug. 7, 2026

San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room CR-C145

Notify Me


Receive updates sent straight to your inbox.
Subscribe
Plan Holders List
View plan holders list.
Downloads

Not logged in

Pre-Bid Sign-In Sheet


Aug. 7, 2026

Non-Mandatory Pre-Bid Presentation


Aug. 7, 2026

Addendum 1


Aug. 19, 2026

Addendum 2


Aug. 20, 2026

Addendum 3


Aug. 25, 2026


Specifications



Jul. 29, 2026

Note: You must be logged in to access this document


Plans



Jul. 29, 2026

Note: You must be logged in to access this document

Geotechnical Data Report - Sage Alignment


Jul 29, 2026

Note: You will be prompted to login to access this document.

Geotechnical Data Report - Toutant - Beauregard Alignment


Jul 29, 2026

Note: You will be prompted to login to access this document.

Geotechnical Data Report - Toutant - Threshold Alignment


Jul 29, 2026

Note: You will be prompted to login to access this document.



Questions? Please contact

Mory Martinez

at 210-233-2451
|

Receive Email Updates
|

Registration Agreement

Attachment Preview

Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project
Solicitation No. CO-00862
Job No. 21-7007
Adam Eddy, P.E.
Project Engineer II - Pipelines
Mory Martinez, MPA
Contract Administrator
Marisol V. Robles
Director of Business Engagement and
Non-Mandatory Pre-Bid Meeting
Contract Compliance
August 7, 2026

August 7, 2026
Oral Statements
Oral statements or discussion during the Non-Mandatory Pre-Bid meeting
today will not be binding, nor will it change or affect the terms or conditions
within the Specifications of this Project. Changes, if any, will be addressed in
writing only via an addendum.
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

August 7, 2026
Agenda
* General Information * Bid Opening Procedures
* Key Project Information * Solicitation Schedule
* Contact Information
* SBOP
* Project Location
* Contract Solicitation Website
* Project Overview
* Vendor Registration
* Communication Restrictions
* Contract Requirements
* Questions
- Insurance Compliance System
- Supplemental Conditions
* Bid Packet Preparation
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

August 7, 2026
General Information
* This is a non-mandatory pre-bid meeting.
* This presentation and attendance sheet will be posted to the SAWS website
at the end of this meeting.
* Questions will be addressed at the end of the presentation; formal
responses will be provided via Addendum.
* Construction services being procured through Invitation for Bids (low bid).
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

Construction Estimate $ 7,200,000.00
Contract Duration 480 days

August 7, 2026
Key Project Information
Sealed bids are requested by the San Antonio Water System for the construction of
approximately 30 LF of 6-inch, 48 LF of 8-inch, 2,370 LF of 12-inch, 6,953 LF of 16-inch, and
65 LF of 24-inch DI pipe via open cut, 1,043 LF of 24-inch to 30-inch steel casing installed by
jacking or boring, surface restoration including pavement replacement, and all other
associated appurtenances as included in the Contract Documents.
Construction $ 7,200,000.00
Estimate
Contract 480 days
Duration
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

August 7, 2026
Aspirational SBOP Goal
20%
The aspirational SBOP goal is a percentage of your total bid price.
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

August 7, 2026
Minimum Qualifications for SBOP recognition
* Local: Office or Equipment Yard in Bexar, Comal, Guadalupe, Hays, Kendall,
Travis, or Williamson county
* Certification: Small Business Enterprise (SBE) Certification from the South
Central Texas Regional Certification Agency dba Supply SA
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

August 7, 2026
Good Faith Effort Plan (GFEP) FAQs
*Q: Is the 20% SBOP goal mandatory?
A: The goal is aspirational, and prime contractors need to conduct good faith outreach efforts. If the goal is not
met, proof of outreach efforts are required with the submittal.
*Q: What if I am having trouble finding local SBE-certified subcontractors or suppliers?
A: Free, Excel-exportable outreach lists are available at https://www.supply-sa.org/.
*Q: I'm a prime contractor. If my business is local and SBE-certified, do I need to find SBE subcontractors and
suppliers?
A: If your company is local and SBE-certified, you will most likely meet the SBOP goal. However, the GFEP is a
required document, and a Good Faith outreach effort is still necessary if subcontractors and/or suppliers
will be used.
*Q: Do I need to include all my subcontractors and suppliers in the GFEP or just those that qualify towards the
SBOP goal?
A: All tiers of subcontractors and suppliers need to be included in the GFEP, even those that are not SBE-
certified or local. (Include the non-local and the non-SBE subcontractors and suppliers, too.)
*Q: What if I have questions about the GFEP?
A: Please contact the Director of Business Engagement and Contract Compliance at Marisol.Robles@saws.org.
GFEP questions can be asked at any time before the submittal is due.
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

August 7, 2026
Good Faith Effort Plan Updates
Supplemental Conditions Article IV amending General Conditions Section 4.4
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

August 7, 2026
Good Faith Effort Plan Updates (continued)
Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project (IFB)

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...DIRECTORS 41ST STREET WATER MAIN REPLACEMENT PROJECT - KENNEDY AVENUE TO 5TH STREET ...

MPN

Bid Due: 7/14/2075

...protection water main and the domestic water main from Campbell Avenue to Building ...

DEPT OF DEFENSE

Bid Due: 10/23/2026

...Salado Creek - Sewer Main Replacement Project HYBRID WEBEX / IN-PERSON CONTRACTOR OUTREACH ...

San Antonio Water System

Bid Due: 12/14/2026

...and Related Structures Construction Place of Performance: Description BRCA 318695 - Rehabilitate Main ...

INTERIOR, DEPARTMENT OF THE

Bid Due: 9/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.