| Location: | Guam |
|---|---|
| Posted: | May 18, 2026 |
| Due: | Jun 5, 2026 |
| Agency: | Guam General Services Agency (GSA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
EDWARDM.BIRN GENERALSERVICESAGENCY LOURDESA.LEONGUERRERO
Director(Direktot) Governor(Maga'haga)
(AhensionSetbisionHinirat)
RENAK.BORJA JOSHUAF.TENORIO
DeputyDirector(SigundoDirektot) Telephone(Telifon):(671)475-1705/1706 Lt.Governor(SigundoMaga'lahi)
May7,2026
InvitationforBid
GSA-015-26
Amendment#2
RemoveandReplaceA/CPackageUnit(s)(IDIQ)
1) Amendpage1of49.
From:
SubmissionDeadline:Monday,May25,2026,2:00p.m.
BidOpeningDate:Monday,May25,2026,2:05p.m.
Tonowread:
SubmissionDeadline:Friday,June5,2026,10:00a.m.
BidOpeningDate:Friday,June5,2026,10:05a.m.
2) Amendpage2of49.
From:
DeadlineforSubmissionofBid:Monday,May25,2026,2:00p.m.
Opening(OpentothePublic):Monday,May25,2026,2:05p.m.
Tonowread:
DeadlineforSubmissionofBid:Friday,June5,2026,10:00a.m.
Opening(OpentothePublic):Friday,June5,2026,10:05a.m.
3) Amendpage2of49.
From:
DeadlineforSubmissionofWrittenQuestionsandConcernsmustbeemailedtobids@gsadoa.guam.gov:Monday,
May4,2026,5:00p.m.
Tonowread:
DeadlineforSubmissionofWrittenQuestionsandConcernsmustbeemailedtobids@gsadoa.guam.gov:Monday,
May18,2026,5:00p.m.
4) Amendandreplacepages47and48of49withattached"RevisedPage47and48of49"dated05/07/26
Allothersremainunchanged.
AndrianaQuitugua
ActingChiefProcurementOfficer
PleasePrint
ACKNOWLEDGMENTCOPY
ReceivedBy: _______________________
Date: _______________________
Company/Name: _______________________
EmailTo:gsaprocurement@gsadoa.guam.gov
590SouthMarineCorpsDrive,ITCBuilding,Suite230,Tamuning,Guam96913 P.O.Box7420,Tamuning,Guam96931
BidForm
Item Description QTY UOM UnitPrice Total
No.
3.1 3-TonPackageAirConditioning 1 LinearFoot $__________ $__________
DuctworkforSupplyandReturn
(Asneededbasis)
Asperthefollowingspecifications:
SPECIFICATIONS: BIDDINGON/REMARKS
Replace,Remove,andDispose:
Biddershallprovideaturnkey,andtestthatincudesRemove,Replaceand
Disposeoldexteriorductworksfor3-TonPackageAirConditioningsupply
andreturnofair. ___________________
Requirements:
Biddershallprovideallnecessaryductworksfor3-TonPackageAir
Conditioningsupplyandreturnofairincluding,butnotlimitedtogalvanized
sheetmetalwith45 degrees/90 degreesrectangularradiuselbowforaproperairflow.
Allgalvanizedsheetmetalductingshallberesistancetorustandcorrosion.
Biddershallincludeallfittingsinternalinsulation-moisturebarrier,all
frames,supportsincludingconsumables,suchasanchorbolts,washersand
nuts,rivets,andscrews;adhesiveandsealantfortheductandconcretegutter
(Openingforsupplyandreturnairducts). ___________________
CleanandDispose:
Bidderwillberesponsibleforhaulinganddisposalofdebris/equipment
asperGuamEPARegulationsonHazardousMaterials&Debris;Hauling&
DisposalincludingbutnotlimitedtodisposalofRefrigerantGas,Fiberglass&
Particulates.Bidderwillberesponsibleforleavingthejobsitecleanand
disposeofanywastegeneratedtomeetanyandallapplicablelocalandfederal
lawsandregulations. ___________________
Furnish:
Biddershallfurnishallequipment,laborcosts,materials,shipping,handling,
delivery,heavyequipment/cranelifttoliftupnewductworksandtobringdown
olddamagedducts,andtoincludesupervisiontoperformallworkrequired. ___________________
Warranty:One(1)yearwarrantyforunitcoversdefectinmaterialsand
workmanshipfortheentireunit,includingparts,andlaborforaperiodof
one(1)yearfromthedateoftheinstallation. ___________________
Schedules:Biddershallcoordinatescheduleswithagency. ___________________
Note:
Partialdeliverieswillnotbeaccepted.Allrequirementsspecifiedmustbeprovidedandinstalledattimeofdelivery.
"Revised"05/07/26
Amendment#2
Page47of49
BidForm
Item Description QTY UOM UnitPrice Total
No.
4.1 5-TonPackageAirConditioning 1 LinearFoot $__________ $__________
DuctworkforSupplyandReturn
(Asneededbasis)
Asperthefollowingspecifications:
SPECIFICATIONS: BIDDINGON/REMARKS
Replace,Remove,andDispose:
Biddershallprovideaturnkey,andtestthatincudesRemove,Replaceand
Disposeoldexteriorductworksfor5-TonPackageAirConditioningsupply
andreturnofair. ___________________
Requirements:
Biddershallprovideallnecessaryductworksfor5-TonPackageAir
Conditioningsupplyandreturnofairincluding,butnotlimitedtogalvanized
sheetmetalwith45 degrees/90 degreesrectangularradiuselbowforaproperairflow.
Allgalvanizedsheetmetalductingshallberesistancetorustandcorrosion.
Biddershallincludeallfittingsinternalinsulation-moisturebarrier,all
frames,supportsincludingconsumables,suchasanchorbolts,washersand
nuts,rivets,andscrews;adhesiveandsealantfortheductandconcretegutter
(Openingforsupplyandreturnairducts). ___________________
CleanandDispose:
Bidderwillberesponsibleforhaulinganddisposalofdebris/equipment
asperGuamEPARegulationsonHazardousMaterials&Debris;Hauling&
DisposalincludingbutnotlimitedtodisposalofRefrigerantGas,Fiberglass&
Particulates.Bidderwillberesponsibleforleavingthejobsitecleanand
disposeofanywastegeneratedtomeetanyandallapplicablelocalandfederal
lawsandregulations. ___________________
Furnish:
Biddershallfurnishallequipment,laborcosts,materials,shipping,handling,
delivery,heavyequipment/cranelifttoliftupnewductworksandtobringdown
olddamagedducts,andtoincludesupervisiontoperformallworkrequired. ___________________
Warranty:One(1)yearwarrantyforunitcoversdefectinmaterialsand
workmanshipfortheentireunit,includingparts,andlaborforaperiodof
one(1)yearfromthedateoftheinstallation. ___________________
Schedules:Biddershallcoordinatescheduleswithagency. ___________________
Note:
Partialdeliverieswillnotbeaccepted.Allrequirementsspecifiedmustbeprovidedandinstalledattimeofdelivery.
ThesespecificationshavebeendevelopedandpreparedbythestaffoftheDepartmentofAdministrationandapprovedby
EdwardM.Birn,Director.
"Revised"05/07/26
Amendment#2
Page48of49

With GovernmentContracts, you can:
...Follow GUANG SPLIT A/C UNITS Active Contract Opportunity Notice ID W50S7R26QA004 Related Notice... ...
DEPT OF DEFENSE
Bid Due: 9/22/2026