| Location: | Georgia |
|---|---|
| Posted: | Dec 10, 2024 |
| Due: | Dec 27, 2024 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA8538-25-R-0003 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
C-5 Visor Door Actuator Overhaul
The Air Force has a requirement for overhaul of the C-5 Visor Door Actuator (VDA) for use by the United States Air
Force (USAF) in support of the C-5 Galaxy cargo aircraft.
Notice ID: FA8538-25-R-0003
This Synopsis for the requirement is being issued by AFSC/PZAAB (FA8538)
NSN: 1680-00-402-9812
Noun: ACTUATOR,MECHANICAL
Synopsis is for issuance of a Firm-Fixed Price/Indefinite Delivery Indefinite Quantity (IDIQ) type Request for Proposal (RFP), FA8538-25-R-0003, for depot-level overhaul/remanufacture services applicable to the C-5 VDA for use by the USAF in support of the C-5 Galaxy cargo aircraft. C-5M Visor Door Actuator Overhaul of this complex design requires strict control of processes to ensure adherence to very close tolerances. Due to the unique application and Critical Safety Item designation of the visor door actuator, special equipment is required to test the final repaired item and ensure its flight worthiness. Brake, load, and functional testing are required to ensure the visor actuator will not fail in use.
The FFP/IDIQ contract is planned for 5-years in length utilizing Delivery Protection Program (DPP)
Competitive procedures: The first two (2) years for both the currently approved and qualified source completing the Mission Essential Quantity (MEQ) overhaul repairs, and for pre-production from a potential source. The remaining three (3) years to the proven qualified source. The projected period of performance for this requirement is anticipated as follows:
Basic (2-years) to the proven source:
Basic 1 - MEQ Min/Max Qty: 1 / 12
Basic Option Year 2 - MEQ Min/Max Qty: 1 / 12
Pre-Production to the unproven source: 1/2
Option 1 (1 year) - Production Option Min/Max Qty: 1 / 12
Option 2 (1 year) - Production Option Min/Max Qty: 1 / 12
Option 3 (1 year) - Production Option Min/Max Qty: 1 / 12
This acquisition will be Full and Open Competition utilizing Delivery Protection Program (DPP)
Competitive procedures. The proven source will be awarded an IDIQ type contract for the first two (2) years to complete MEQ Quantities, with a potential of three (3) Option Years. If an unproven source is the lowest offeror, the Government will also award an IDIQ type contract with Pre-Production and Production Options.
Period of Performance is anticipated to begin July 2025 for a period of 5 years (FY25 - FY30).
| Feb 4, 2025 | [Solicitation (Original)] C-5 Visor Door Actuator Overhaul |
| Mar 3, 2025 | [Solicitation (Updated)] C-5 Visor Door Actuator Overhaul |
| Mar 27, 2025 | [Solicitation (Updated)] C-5 Visor Door Actuator Overhaul |

With GovernmentContracts, you can:
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77725-NONST-2026-000000010
State Government of Georgia
Bid Due: 6/11/2026
School Improvement Plan Consulting Services Title: School Improvement Plan Consulting Services Description: The
Liberty County School System
Bid Due: 5/19/2042
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77030-NONST-2026-000000022
State Government of Georgia
Bid Due: 6/09/2026
Lower Poplar WRF Digester #6 and Drying Bed Cleaning The Project consists of
Macon Water Authority
Bid Due: 6/16/2026