Milling, Resurfacing & Shoulder Reconstruction - Various Routes - Cumberland

Location: North Carolina
Posted: Oct 14, 2026
Due: Nov 4, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • 34 - Metalworking Machinery
Publication URL: To access bid details, please log in.
  • DF00566
    POC
    Milling, Resurfacing & Shoulder Reconstruction - Various Routes - Cumberland
  • Attachment Preview

    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    HIGHWAY DIVISION 6
    PLANS
    Letting Date:
    November 4, 2026
    CONTRACT ID: DF00566
    TIP NO.: ------
    FEDERAL AID NO.: STATE FUNDED
    WBS ELEMENT NO.: 2027CPT.06.07.10261.1 & 2027CPT.06.07.20261.1
    ROUTE NO.: VARIES
    LOCATION: VARIES
    COUNTY: CUMBERLAND
    LENGTH OF PROJECT: 14.66 MILES
    TYPE OF WORK: MILLING, RESURFACING & SHOULDER RECONSTRUCTION

    PROJECT REFERENCE NO. SHEET NO. /2/6 4' - 10' PAVEMENT SCHEDULE TYP. SHOULDER WIDTH 27'-95' D 2' - 6' C1 1 A " T A A SP N H A A V L E T R C A O G N E C R R E A T T E E S O U F R 1 F 1 A 0 C L E B C S O . U PE R R S E S , Q T . Y Y P D E . S9.5B, R1 R2 C2V2 R1 T1 D E TI N R E S A T U I O N R A E E G X P E . O G . S R IT A I D V E E . C2 1(cid:129)" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. EXISTING PAVEMENT AND BASE SHOULDER WEDGE R1 EXISTING CONCRETE CURB AND GUTTER U SHOULDER RECONSTRUCTION NOTES: TYPICAL SECTION NO. 1 1. SHOULDER SHALL BE RECONSTRUCTED AS SHOWN IN STD. DWG. NO. 560.01 & R2 EXISTING CONCRETE ISLAND 560.02, WITH A MINIMUM SLOPE OF 1" PER FOOT TO ENSURE POSITIVE DRAINAGE AWAY FROM ROADWAY. 2. AGGREGATE SHOULDER BORROW (ASB) MATERIAL SHALL BE PLACED USING A WIDENING MACHINE OR SIMILAR DEVICE. SHOULDER RECONSTRUCTION WITH 3. A VEGETATIVE BUFFER SHALL BE MAINTAINED BETWEEN THE DISTURBED AREA T1 ALONG THE EDGE OF PAVEMENT AND THE DITCH SHOULDER POINT TO MINIMIZE AGGREGATE SHOULDER BORROW EROSION. PULLING DITCHES OR CUTTING SHOULDERS TO GENERATE BORROW 2' 18'-27' 2' MATERIAL WILL NOT BE ALLOWED. D D D 4. REQUIRED BORROW MATERIAL MAY BE OBTAINED BY THE CONTRACTOR FROM U EXISTING PAVEMENT C2 WIDENING OPERATIONS WITHIN THE PROJECT LIMITS, FROM NCDOT APPROVED T1 T1 BORROW PITS OR FROM NCDOT STOCKPILES. ANY EXCESS MATERIAL SHALL BE DISPOSED OF BY THE CONTRACTOR IN AN APPROVED DISPOSAL SITE. V1 0" - 1(cid:129)" MILLING MILL AS DIRECTED MILL AS DIRECTED BY ENGINEER BY ENGINEER V2 1(cid:129)" MILLING U V1 V1 TYPICAL SECTION NO. 2 V3 0" - 1(cid:129)" CURB MILLING (3' WIDTH) EX. PAVEMENT EX. CONC. BRIDGE DECK EX. PAVEMENT V2 V1 2' 34'-36' EX. PAVEMENT EX. AWS EX. PAVEMENT D D EX. CONC. BRIDGE DECK C2V2 R1 T1 BRIDGE MILLING MILL AS DIRECTED MILL AS DIRECTED BY ENGINEER BY ENGINEER CROEOSRIDDEINN WAT IT T AEH N IWN DI TTC HHO E NRS TAE RI LL ARI C MOT IAT ODS R OSWHANLELR V1 V1 3' 3' U EX. PAVEMENT EX. PAVEMENT EX. RR CROSSING TYPICAL SECTION NO. 3 RAILROAD TRACKS MILLING MILLING APPROACHES NOTE: 23'-40' -MILLING SHALL BE PERFORMED AT RR CROSSINGS, BRIDGE DECKS AND BRIDGE D APPROACHESA S DIRECTED BY THE ENGINEER, IN ACCORDANCE WITH THIS DETAIL. -FOR RR CROSSINGS, RAILROAD OWNER MUST AUTHORIZE ACCESS TO RIGHT OF WAY PRIOR R1 C2V2 R1 TO ENTRY. NOTES TO CONTRACTOR FOR SURFACE MIXES OVER 1" IN THICKNESS, MILL THE EXISTING PAVEMENT IN ACCORDANCE WITH THE FOLLOWING SKETCH AS DIRECTED BY THE ENGINEER. LOCATIONS SHALL INCLUDE TIES INTO EXISTING CONCRETE PAVEMENT, AT BRIDGE APPROACHES DEPTH, LENGTH & WIDTH VARIES WHERE THE BRIDGE WILL NOT BE RESURFACED, AND AT THE BEGINNING AND ENDING POINT AS DIRECTED BY THE ENGINEER U OF EACH RESURFACING MAP. PERFORM THE WORK IN ACCORDANCE WITH SECTION 607 OF THE JANUARY 2024 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS AND TYPICAL SECTION NO. 4 STRUCTURES. RESURFACING WILL BE ACCOMPLISHED AT THE SAME TIME AS THE MILLING OPERATION. 75' EXISTING PAVEMENT MILL EXISTING PAVEMENT BEGINNING OR ENDING OF MAP, EXISTING CONCRETE PAVEMENT OR ACBC TYPE B25.0B OR ACSC TYPE SF9.5A,S9.5B OR S9.5C NON-RESURFACEABLE BRIDGE DECKS AS DIRECTED BY THE ENGINEER $$$$EMANRESU$$$$ APPROX. THICKNESS OF SURFACE COURSE PATCHING EXISTING PAVEMENT PATCHING TO BE PERFORMED PRIOR TO MILL AND FILL OPERATION MILLING AT PAVEMENT TIE-INS DETAIL PROJECT REFERENCE NO. SHEET NO.
    PAVEMENT SCHEDULE C1 1" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD.
    C2 1(cid:129)" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD.
    R1 EXISTING CONCRETE CURB AND GUTTER
    R2 EXISTING CONCRETE ISLAND
    T1 SHOULDER RECONSTRUCTION WITH
    U AGGREGATE SHOULDER BORROW EXISTING PAVEMENT
    V1 0" - 1(cid:129)" MILLING
    V2 1(cid:129)" MILLING

    PROJECT REFERENCE NO. SHEET NO.
    34:01
    6202-TCO-31
    ngd.2pyt\snalP\dnalrebmuC_6202
    llaF_cte,1.16201.70.60.TPC7202_66500FD\gnicafruseR\6202\2
    tcirtsiD\reenignEslasoporPnoisiviD\:S
    99/2/6
    $$$$EMANRESU$$$$
    4' - 10'
    PAVEMENT SCHEDULE
    TYP. SHOULDER WIDTH
    27'-95'
    D 2' - 6'
    C1 1 A " T A A SP N H A A V L E T R C A O G N E C R R E A T T E E S O U F R 1 F 1 A 0 C L E B C S O . U PE R R S E S , Q T . Y Y P D E . S9.5B, R1 R2 C2V2 R1 T1 D E TI N R E S A T U I O N R A E E G X P E . O G . S R IT A I D V E E .
    C2 1(cid:129)" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
    AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. EXISTING PAVEMENT
    AND BASE
    SHOULDER WEDGE
    R1 EXISTING CONCRETE CURB AND GUTTER U SHOULDER RECONSTRUCTION
    NOTES:
    TYPICAL SECTION NO. 1
    1. SHOULDER SHALL BE RECONSTRUCTED AS SHOWN IN STD. DWG. NO. 560.01 &
    R2 EXISTING CONCRETE ISLAND 560.02, WITH A MINIMUM SLOPE OF 1" PER FOOT TO ENSURE POSITIVE DRAINAGE AWAY
    FROM ROADWAY.
    2. AGGREGATE SHOULDER BORROW (ASB) MATERIAL SHALL BE PLACED USING A
    WIDENING MACHINE OR SIMILAR DEVICE.
    SHOULDER RECONSTRUCTION WITH 3. A VEGETATIVE BUFFER SHALL BE MAINTAINED BETWEEN THE DISTURBED AREA
    T1 ALONG THE EDGE OF PAVEMENT AND THE DITCH SHOULDER POINT TO MINIMIZE
    AGGREGATE SHOULDER BORROW
    EROSION. PULLING DITCHES OR CUTTING SHOULDERS TO GENERATE BORROW
    2' 18'-27' 2'
    MATERIAL WILL NOT BE ALLOWED.
    D D D 4. REQUIRED BORROW MATERIAL MAY BE OBTAINED BY THE CONTRACTOR FROM
    U EXISTING PAVEMENT C2 WIDENING OPERATIONS WITHIN THE PROJECT LIMITS, FROM NCDOT APPROVED
    T1 T1 BORROW PITS OR FROM NCDOT STOCKPILES. ANY EXCESS MATERIAL SHALL BE
    DISPOSED OF BY THE CONTRACTOR IN AN APPROVED DISPOSAL SITE.
    V1 0" - 1(cid:129)" MILLING
    MILL AS DIRECTED MILL AS DIRECTED
    BY ENGINEER BY ENGINEER
    V2 1(cid:129)" MILLING U V1 V1
    TYPICAL SECTION NO. 2
    V3 0" - 1(cid:129)" CURB MILLING (3' WIDTH) EX. PAVEMENT EX. CONC. BRIDGE DECK EX. PAVEMENT
    V2 V1
    2' 34'-36' EX. PAVEMENT EX. AWS EX. PAVEMENT
    D D EX. CONC. BRIDGE DECK
    C2V2 R1
    T1
    BRIDGE MILLING
    MILL AS DIRECTED MILL AS DIRECTED
    BY ENGINEER BY ENGINEER
    CROEOSRIDDEINN WAT IT T AEH N IWN DI TTC HHO E NRS TAE RI LL ARI C MOT IAT ODS R OSWHANLELR
    V1 V1
    3' 3'
    U
    EX. PAVEMENT EX. PAVEMENT
    EX. RR CROSSING
    TYPICAL SECTION NO. 3
    RAILROAD TRACKS MILLING
    MILLING APPROACHES
    NOTE:
    23'-40' -MILLING SHALL BE PERFORMED AT RR CROSSINGS, BRIDGE DECKS AND BRIDGE
    D APPROACHESA S DIRECTED BY THE ENGINEER, IN ACCORDANCE WITH THIS DETAIL.
    -FOR RR CROSSINGS, RAILROAD OWNER MUST AUTHORIZE ACCESS TO RIGHT OF WAY PRIOR
    R1 C2V2 R1 TO ENTRY.
    NOTES TO CONTRACTOR
    FOR SURFACE MIXES OVER 1" IN THICKNESS, MILL THE EXISTING PAVEMENT IN ACCORDANCE
    WITH THE FOLLOWING SKETCH AS DIRECTED BY THE ENGINEER.
    LOCATIONS SHALL INCLUDE TIES INTO EXISTING CONCRETE PAVEMENT, AT BRIDGE APPROACHES
    DEPTH, LENGTH & WIDTH VARIES WHERE THE BRIDGE WILL NOT BE RESURFACED, AND AT THE BEGINNING AND ENDING POINT
    AS DIRECTED BY THE ENGINEER U OF EACH RESURFACING MAP.
    PERFORM THE WORK IN ACCORDANCE WITH SECTION 607 OF THE JANUARY 2024 NORTH
    CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS AND
    TYPICAL SECTION NO. 4 STRUCTURES. RESURFACING WILL BE ACCOMPLISHED AT THE SAME TIME AS THE MILLING
    OPERATION.
    75'
    EXISTING PAVEMENT MILL EXISTING PAVEMENT
    BEGINNING OR ENDING OF MAP,
    EXISTING CONCRETE PAVEMENT OR
    ACBC TYPE B25.0B OR ACSC TYPE SF9.5A,S9.5B OR S9.5C NON-RESURFACEABLE BRIDGE DECKS
    AS DIRECTED BY THE ENGINEER
    APPROX. THICKNESS
    OF SURFACE COURSE
    PATCHING EXISTING PAVEMENT
    PATCHING TO BE PERFORMED PRIOR TO MILL AND FILL OPERATION
    MILLING AT PAVEMENT TIE-INS DETAIL

    PAVEMENT SCHEDULE
    C1 1" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD.
    C2 1(cid:129)" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD.
    R1 EXISTING CONCRETE CURB AND GUTTER
    R2 EXISTING CONCRETE ISLAND
    T1 SHOULDER RECONSTRUCTION WITH AGGREGATE SHOULDER BORROW
    U V1 EXISTING PAVEMENT 0" - 1(cid:129)" MILLING
    V2 1(cid:129)" MILLING
    V3 0" - 1(cid:129)" CURB MILLING (3' WIDTH)
    PAVEMENT

    PROJECT REFERENCE NO. SHEET NO.
    44:01
    6202-TCO-31
    ngd.2pyt\.
    99/2/6
    $$$$EMANRESU$$$$
    30'-45'
    2'
    D
    D 4' - 10'
    PAVEMENT SCHEDULE
    R1 C2 TYP. SHOULDER WIDTH
    T1
    2' - 6'
    TIE TO EX. GRADE.
    C1 1 A " T A A SP N H A A V L E T R C A O G N E C R R E A T T E E S O U F R 1 F 1 A 0 C L E B C S O . U PE R R S E S , Q T . Y Y P D E . S9.5B, T1 D EN R S A U IN R A E G P E O . SITIVE
    C2 1(cid:129)" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
    AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. U EXISTING PAVEMENT
    AND BASE
    SHOULDER WEDGE
    TYPICAL SECTION NO. 5
    R1 EXISTING CONCRETE CURB AND GUTTER SHOULDER RECONSTRUCTION
    NOTES:
    1. SHOULDER SHALL BE RECONSTRUCTED AS SHOWN IN STD. DWG. NO. 560.01 &
    R2 EXISTING CONCRETE ISLAND 560.02, WITH A MINIMUM SLOPE OF 1" PER FOOT TO ENSURE POSITIVE DRAINAGE AWAY
    FROM ROADWAY.
    2' 40'-45' 2. AGGREGATE SHOULDER BORROW (ASB) MATERIAL SHALL BE PLACED USING A
    WIDENING MACHINE OR SIMILAR DEVICE.
    D D
    SHOULDER RECONSTRUCTION WITH 3. A VEGETATIVE BUFFER SHALL BE MAINTAINED BETWEEN THE DISTURBED AREA
    T1 C2 R1 ALONG THE EDGE OF PAVEMENT AND THE DITCH SHOULDER POINT TO MINIMIZE
    AGGREGATE SHOULDER BORROW T1 3' EROSION. PULLING DITCHES OR CUTTING SHOULDERS TO GENERATE BORROW
    D MATERIAL WILL NOT BE ALLOWED.
    4. REQUIRED BORROW MATERIAL MAY BE OBTAINED BY THE CONTRACTOR FROM
    U EXISTING PAVEMENT WIDENING OPERATIONS WITHIN THE PROJECT LIMITS, FROM NCDOT APPROVED
    BORROW PITS OR FROM NCDOT STOCKPILES. ANY EXCESS MATERIAL SHALL BE
    DISPOSED OF BY THE CONTRACTOR IN AN APPROVED DISPOSAL SITE.
    V1 0" - 1(cid:129)" MILLING V3
    U
    MILL AS DIRECTED MILL AS DIRECTED
    TYPICAL SECTION NO. 6 BY ENGINEER BY ENGINEER
    V2 1(cid:129)" MILLING
    V1 V1
    V3 0" - 1(cid:129)" CURB MILLING (3' WIDTH) EX. PAVEMENT EX. CONC. BRIDGE DECK EX. PAVEMENT
    2' 18'-20' 2'
    D D D V2 V1
    C1
    T1 T1
    EX. AWS
    EX. PAVEMENT EX. PAVEMENT
    EX. CONC. BRIDGE DECK
    BRIDGE MILLING
    MILL AS DIRECTED MILL AS DIRECTED
    U BY ENGINEER BY ENGINEER
    CROEOSRIDDEINN WAT IT T AEH N IWN DI TTC HHO E NRS TAE RI LL ARI C MOT IAT ODS R OSWHANLELR
    V1 V1
    TYPICAL SECTION NO. 7 3' 3'
    EX. PAVEMENT EX. PAVEMENT
    EX. RR CROSSING
    26'-30' RAILROAD TRACKS MILLING
    D
    ROLLED C2 ROLLED MILLING APPROACHES
    NOTE:
    CURB CURB -MILLING SHALL BE PERFORMED AT RR CROSSINGS, BRIDGE DECKS AND BRIDGE
    APPROACHESA S DIRECTED BY THE ENGINEER, IN ACCORDANCE WITH THIS DETAIL.
    -FOR RR CROSSINGS, RAILROAD OWNER MUST AUTHORIZE ACCESS TO RIGHT OF WAY PRIOR
    TO ENTRY.
    U NOTES TO CONTRACTOR
    FOR SURFACE MIXES OVER 1" IN THICKNESS, MILL THE EXISTING PAVEMENT IN ACCORDANCE
    WITH THE FOLLOWING SKETCH AS DIRECTED BY THE ENGINEER.
    TYPICAL SECTION NO. 8
    LOCATIONS SHALL INCLUDE TIES INTO EXISTING CONCRETE PAVEMENT, AT BRIDGE APPROACHES
    DEPTH, LENGTH & WIDTH VARIES WHERE THE BRIDGE WILL NOT BE RESURFACED, AND AT THE BEGINNING AND ENDING POINT
    AS DIRECTED BY THE ENGINEER OF EACH RESURFACING MAP.
    PERFORM THE WORK IN ACCORDANCE WITH SECTION 607 OF THE JANUARY 2024 NORTH
    CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS AND
    STRUCTURES. RESURFACING WILL BE ACCOMPLISHED AT THE SAME TIME AS THE MILLING
    OPERATION.
    75'
    EXISTING PAVEMENT 2' 36'-40' 2' MILL EXISTING PAVEMENT
    D D D
    T1 C2V2 T1 BEGINNING OR ENDING OF MAP,
    EXISTING CONCRETE PAVEMENT OR
    ACBC TYPE B25.0B OR ACSC TYPE SF9.5A,S9.5B OR S9.5C NON-RESURFACEABLE BRIDGE DECKS
    AS DIRECTED BY THE ENGINEER
    APPROX. THICKNESS
    OF SURFACE COURSE
    PATCHING EXISTING PAVEMENT
    PATCHING TO BE PERFORMED PRIOR TO MILL AND FILL OPERATION U
    TYPICAL SECTION NO. 9 MILLING AT PAVEMENT TIE-INS DETAIL

    1 NC 162 RT Camden Road! 176 ft from EP of L-Line 2,056.14 SY
    1 NC 162 RT Columbine Road! 154 ft from EP of L-Line 625.30 SY
    1 NC 162 RT John Smith Road! 120 ft from EP of L-Line 588.84 SY !
    1 NC 162 RT Quail Forest Drive! 134 ft from EP of L-Line 532.55 SY !!!
    1 NC 162 RT Cumberland Road! 423 ft from EP of L-Line 3,977.37 SY
    2 NC 162 RT Camden Road! 39.56 ft from EP of L-Line 463.33 SY
    2 NC 162 RT John Brady Road! 226.08 ft from EP of L-Line 793.42 SY
    3 SR 1410 RT Bunce Road!SR 140.72 ft from EP of L-Line 755.56 SY !
    16 3935 RT Production!Drive 57.30 ft from EP of L-line 225.91 SY
    20 SR 4626 RT Peacock Street 105 ft from EP of L-line 613.03 SY

    PROJECT REFERENCE NO. SHEET NO. NOTES: 1) DETAIL DOES NOT APPLY TO OGAFC AND ULTRA-THIN BONDED WEARING COURSE. ASPHALT OVERLAY 2) BACKFILL SHOULDER WITH APPROVED MATERIAL. 3) THE SHOULDER WEDGE DEVICE MAY BE DISENGAGED AT PAVED DRIVEWAYS AND SIDE STREETS. SHOULDER WEDGE a a APPROVED BACKFILL MATERIAL EXISTING UNIMPROVED SHOULDER PROPOSED PAVEMENT SHOULDER WEDGE DETAIL ASPHALT OVERLAY (Resurfacing Projects w/ Widening or with Existing Paved Shoulder having no dropoffs) SHOULDER WEDGE a a APPROVED BACKFILL MATERIAL EXISTING UNIMPROVED SHOULDER ASPHALT OVERLAY EXISTING PAVEMENT SHOULDER WEDGE a SHOULDER WEDGE DETAIL (Resurfacing Projects w/ NO Widening) APPROVED BACKFILL MATERIAL DROP OFF a EXISTING UNIMPROVED SHOULDER W/ RUTTING EXISTING PAVEMENT - SHOULDER WEDGE ANGLE = 30(cid:176) RUT CONTRACT STANDARDS AND DEVELOPMENT UNIT Office 919-707-6950 FAX 919-250-4119 SHOULDER WEDGE DETAIL SHOULDER WEDGE FERENCE NO. SHEET NO.

    PROJECT REFERENCE NO. SHEET NO.
    NOTES:
    1) DETAIL DOES NOT APPLY TO OGAFC AND ULTRA-THIN BONDED WEARING COURSE.
    ASPHALT OVERLAY 2) BACKFILL SHOULDER WITH APPROVED MATERIAL.
    3) THE SHOULDER WEDGE DEVICE MAY BE DISENGAGED AT PAVED DRIVEWAYS AND SIDE STREETS.
    a
    a
    EXISTING UNIMPROVED
    SHOULDER
    a
    a
    a
    DROP OFF
    a
    EXISTING UNIMPROVED
    SHOULDER W/ RUTTING
    RUT CONTRACT STANDARDS
    AND DEVELOPMENT UNIT
    Office 919-707-6950 FAX 919-250-4119
    SHOULDER WEDGE
    DETAILS
    (Resurfacing Adjacent to
    Rutted Shoulder) ORIGINAL BY: T.SPELL DATE: 7-19-11
    MODIFIED BY: DATE: 10/16/12
    CHECKED BY: DATE:
    FILE SPEC.:s:usr/details/stand/shoulderwedgedetail.dgn
    $$$$$EMITSYS$$$$$$
    $$$$$$$$$$$$$$$$NGD$$$$$$$$$$$$$$$$
    $$$$EMANRESU$$$$
    SHOULDER WEDGE
    APPROVED BACKFILL
    MATERIAL
    PROPOSED PAVEMENT
    SHOULDER WEDGE DETAIL
    ASPHALT OVERLAY
    (Resurfacing Projects w/ Widening or
    with Existing Paved Shoulder having no dropoffs)
    SHOULDER WEDGE
    APPROVED BACKFILL
    MATERIAL
    EXISTING UNIMPROVED
    SHOULDER
    ASPHALT OVERLAY
    EXISTING PAVEMENT
    SHOULDER WEDGE
    SHOULDER WEDGE DETAIL
    (Resurfacing Projects w/ NO Widening)
    APPROVED BACKFILL
    MATERIAL
    EXISTING PAVEMENT - SHOULDER WEDGE ANGLE = 30(cid:176)
    SHOULDER WEDGE DETAIL

    SHEET NO.
    NOITCERID DNA SETON REP GNINGIS TNEMECALP PLACE 1000' PRIOR TO BEGINNING OF CONSTRUCTION LIMITS. ROAD ONLY USED ON -Y- LINES IF RESURFACING LIMITS EXTEND 1000' ALONG -Y- LINE. WORK 1 AHEAD W20-1 48'' X 48'' #2 SIGN ONLY USED WHEN RESURFACING LIMITS ARE 2 OR MORE MILES IN LENGTH. NEXT W7-3aP 2 24'' X 18'' XX MILES ROUND UP TO NEXT WHOLE NUMBER.(NO FRACTIONAL OR DECIMAL NUMBERS) NO REQUIRED STATIONARY FOLLOWING -Y- LINE 1) LESS THAN 1000' OF RESUR 2) SUBDIVISION ROADS 3) DEAD END ROADS WHEN PAVING/CONSTRUCTION ACTIVITI -Y- LINE, ADVANCE WARNING PORTABL -Y- LINE AS SHOWN BELOW. REMOVE UP ROAD WORK AHEAD W20-1 48'' X 48'' PLACED 500' IN ADVANCE OF FLAGGER. P
    PLACE INITIALLY AT THE CONSTRUCTION LIMITS AND SPACED 1 MILE APART LOW/SOFT 3 THEREAFTER. IF NO -Y- LINES EXIST, PLACE 2ND SET (cid:129) MILE FROM THE SHOULDER CONSTRUCTION LIMITS AND THEN SPACE 1 MILE THEREAFTER. SP 13107 48'' X 48''
    THESE ARE FOR -Y- LINES THAT ARE "THROUGH" ROADWAYS. DEAD END AND SUBDIVISION ROADS ARE NOT "THROUGH" ROADWAYS. INSTALL 500' +/- FROM ROAD EACH -Y- LINE APPROACH AS SHOWN ABOVE. FOR MULTIPLE -Y- LINES THAT 4 UNDER ARE SEPARATED BY 0.25 MILES OR LESS, TREAT AS A SINGLE UNIT AND INSTALL CONST WITHIN 500' OF EACH APPROACH. A MAXIMUM OF 2 SIGN SETS PER MILE. DO NOT SP 13106 INSTALL WHEN -Y- LINES ARE WITHIN 0.5 MILES FROM "END ROAD WORK" SIGN. 48'' X 48''
    NOTES: 1) MAY USE LAW ENFORCEMENT TO CONTR INTERSECTIONS AS DIRECTED BY THE E "ROAD WORK AHEAD" (W20-1) SIGNS 50 APPROACHES FROM THE SIDE STREETS W THE INTERSECTION.
    END 5 PLACE 500' FOLLOWING THE END OF CONSTRUCTION LIMITS. ROAD WORK G20-2 A 48'' X 24''

    LEGEND
    STATIONARY SIGN
    DIRECTION OF TRAFFIC FLOW
    5102/32/3
    ngd.rdlhS_uSrU_nraWvdA_gnicafruseR\sdaolnwoD\tterragmr\sresU\:C
    tterragmr:resU
    PROJ. REFERENCE NO. SHEET NO.
    CONSTRUCTION CONSTRUCTION
    LIMITS LIMITS
    1
    2
    3
    5
    Y1
    Y2
    NO REQUIRED STATIONARY SIGNING FOR THE
    FOLLOWING -Y- LINE CONDITIONS:
    PLACE 1000' PRIOR TO BEGINNING OF CONSTRUCTION LIMITS.
    ROAD
    ONLY USED ON -Y- LINES IF RESURFACING LIMITS EXTEND 1000' ALONG -Y- LINE.
    1) LESS THAN 1000' OF RESURFACING ALONG -Y- LINE
    WORK
    1 AHEAD W20-1 2) SUBDIVISION ROADS
    48'' X 48'' 3) DEAD END ROADS
    #2 SIGN ONLY USED WHEN RESURFACING LIMITS ARE 2 OR MORE MILES IN LENGTH.
    NEXT W7-3aP
    2
    24'' X 18''
    XX MILES ROUND UP TO NEXT WHOLE NUMBER.(NO FRACTIONAL OR DECIMAL NUMBERS)
    WHEN PAVING/CONSTRUCTION ACTIVITIES PROCEED ACROSS AN UNSIGNED
    -Y- LINE, ADVANCE WARNING PORTABLE SIGNS SHALL BE USED ALONG THE
    -Y- LINE AS SHOWN BELOW. REMOVE UPON COMPLETION OF WORK.
    PLACE INITIALLY AT THE CONSTRUCTION LIMITS AND SPACED 1 MILE APART
    LOW/SOFT
    3 THEREAFTER. IF NO -Y- LINES EXIST, PLACE 2ND SET (cid:129) MILE FROM THE
    SHOULDER
    CONSTRUCTION LIMITS AND THEN SPACE 1 MILE THEREAFTER.
    ROAD
    48'' X 48''
    WORK
    AHEAD
    THESE ARE FOR -Y- LINES THAT ARE "THROUGH" ROADWAYS. DEAD END AND W20-1 W20-7 A
    48'' X 48''
    48'' X 48''
    SUBDIVISION ROADS ARE NOT "THROUGH" ROADWAYS. INSTALL 500' +/- FROM
    ROAD
    EACH -Y- LINE APPROACH AS SHOWN ABOVE. FOR MULTIPLE -Y- LINES THAT
    PLACED 500' IN ADVANCE OF FLAGGER. PLACED 250' IN ADVANCE OF FLAGGER.
    4 UNDER ARE SEPARATED BY 0.25 MILES OR LESS, TREAT AS A SINGLE UNIT AND INSTALL
    CONST WITHIN 500' OF EACH APPROACH. A MAXIMUM OF 2 SIGN SETS PER MILE. DO NOT
    INSTALL WHEN -Y- LINES ARE WITHIN 0.5 MILES FROM "END ROAD WORK" SIGN.
    48'' X 48''
    END
    5 PLACE 500' FOLLOWING THE END OF CONSTRUCTION LIMITS.
    ROAD WORK
    G20-2 A
    48'' X 24''
    D I V I T A S T I E O O
    N
    F N
    O
    O
    F
    RTH
    HI
    C G A R H O W L I A Y S
    S N
    A
    W D E O N L
    O P A T I R O R K R T M R T A N T
    Z O E N N T E O T F R T A R F A F N I S C P O C O
    DNA
    SETON
    GNINGIS
    NOITCERID
    REP
    TNEMECALP
    SIGNING FOR RESURFACING PROJECTS
    1
    5
    5 4 3 3 4
    1000' OR MORE
    (SEE NOTE 1)
    1000' OR MORE
    4
    1 3 4 (SEE NOTE BELOW) 3 3
    2
    5
    1 MILE SPACING
    (SEE NOTE BELOW)
    1
    MAINLINE (-L-) SIGNING -Y- LINE SIGNING
    SP 13107
    SP 13106
    NOTES:
    1) MAY USE LAW ENFORCEMENT TO CONTROL TRAFFIC AT SIGNALIZED
    INTERSECTIONS AS DIRECTED BY THE ENGINEER. PROVIDE PORTABLE
    "ROAD WORK AHEAD" (W20-1) SIGNS 500' IN ADVANCE ALONG BOTH
    APPROACHES FROM THE SIDE STREETS WHEN PAVING PROCEEDS THROUGH
    THE INTERSECTION.
    RESURFACING
    ADVANCE WARNING SIGNS
    FOR RURAL AND SUBURBAN
    MULTI-LANE ROADWAYS
    W/ SHOULDER SECTIONS

    PROJ. REFERENCE NO. SHEET NO.
    N O F HI D I V I T A S T I E O O F N O RTH C G A R H O W L I A Y S S N A W D E O N L O P A T I R O R K R T M R T A N T Z O E N N T E O T F R T A R F A F N I S C P O C O RESURFACING ADVANCE WARNING SIGNS FOR URBAN / SUBURBAN FACILITIES

    5102/8/4
    ngd.)2(
    uSrU_nraWvdA_gnicafruseR\sdaolnwoD\tterragmr\sresU\:C
    tterragmr:resU
    PROJ. REFERENCE NO. SHEET NO.
    URBAN / SUBURBAN WORKZONES
    (SEE NOTE 4)
    (SEE NOTE 4)
    (SEE NOTE 4)
    1000' +/- CONSTRUCTION
    LIMITS
    END
    BEGIN
    ROAD ROAD WORK G20-2 A
    WORK 48'' X 24''
    SP-11299
    48'' X 48''
    NEXT
    W7-3aP
    XX MILES
    36'' X 30''
    NOTES:
    1) 48" x 48" SIZED SIGNS (SP- 11299) MAY BE REDUCED TO 36" X 36" ON ROADWAYS
    WITH SPEED LIMITS OF 40 MPH OR LESS.
    2) MOUNT SIGNS THAT ARE LARGER THAN 10 SQUARE FEET IN AREA ON TWO OR MORE
    WOOD OR U-CHANNEL SUPPORTS. PERFORATED SQUARE TUBING SUPPORT SYSTEMS MAY
    SUPPORT LARGER AREAS ON A SINGLE SUPPORT. FOLLOW MANUFACTURER'S
    RECOMMENDATIONS. THESE SYSTEMS SHALL BE NCHRP 350 COMPLIANT AND NCDOT
    APPROVED.
    3) ADVANCE WARNING SIGNS NOT REQUIRED ON NON-SIGNALIZED SIDE STREETS.
    4) MAY USE LAW ENFORCEMENT TO CONTROL TRAFFIC AT SIGNALIZED INTERSECTIONS AS DIRECTED
    BY THE ENGINEER. PROVIDE PORTABLE "ROAD WORK AHEAD" (W20-1) SIGNS 500' IN ADVANCE
    ALONG BOTH APPROACHES FROM THE SIDE STREETS WHEN PAVING PROCEEDS THROUGH THE
    INTERSECTION.
    5) LATERAL CLEARANCE AT ALL SIGN LOCATIONS SHALL BE 2' AS MEASURED FROM THE
    EDGE OF PAVEMENT OR THE FACE OF THE CURB. WHEN UNABLE TO OBTAIN THE LATERAL
    CLEARANCE WITHIN THE MEDIAN AREA USE SHOULDER MOUNTS ONLY.
    6) SIGN MOUNT LOCATIONS SHALL NOT BLOCK SIDEWALKS OR DRIVEWAYS.
    LEGEND 7) IF STATIONARY GENERAL WARNING SIGNS ARE USED, THEY WILL BE PAID FOR PER
    STATIONARY SIGN 8 ) S S I E H F C A M T L I I L L O L N B E E 1 D 0 U A 4 S R O E E F D A T T S H O A E W R N E A C N R D O N O T T D P S R A T IV V A E E N R D D S A B O R A F D C T K S H P B E E Y C P T I R F H E IC E S A E E N T N I T D O C N O O S F N A T D S H I E E T X I W O T O N R R S A . K T W D H O A E R Y S K E , . P A O R R E T T A O B L IN E C S L IG U N D S E , D I V I T A S T I E O O
    N
    F N
    O
    O
    F
    RTH
    HI
    C G A R H O W L I A Y S RESURFACING ADVANCE
    S N
    A
    BUT NOT LIMITED TO "ROUGH ROAD" W8-8, "UNEVEN LANES" W8-11, "GROOVED PAVEMENT" WARNING SIGNS FOR
    DIRECTION OF TRAFFIC
    FLOW W8-15 w/MOTORCYCLE PLAQUE MOUNTED BELOW. THESE ARE TO BE DOUBLE INDICATED ON W D E O N L
    MULTI-LANE ROADWAYS WITH SPEED LIMITS 45 MPH AND GREATER WHERE LATERAL CLEARANCE O R K P A R T M R T A T I N T R O URB F A A N C / I L SU IT B I U E R S BAN
    C O A TH N E B R E I O TE B M TA S I O N F E D W W OR IT K H I I N N C T L H U E D M ED E D IN IA T N H A E R T E E A M S P .T O H R E A S R E Y P T O R R A T F A F B I L C E C S O I N G T N R S O A L R ( E L I U N M C P ID S E U N M T ) A P L A T Y O I T T E H M E . Z O E N N T E O T F R T A R F A F N I S C P O C O

    PROJECT REFERENCE NO. SHEET NO. 8 2017CPT.06.11.10091.1, etc GUIDELINES FOR LANE WIDTHS ON RESURFACING PROJECTS Contractor shall place the new pavement markings in accordance with this table and detail unless otherwise directed by the Engineer. TWO LANE - TWO WAY ROADWAY - 55 MPH ROADWAY WIDTH LANE WIDTH SHOULDER WIDTH 18' 9' * 0' 20' 10' * 0' 22' 10' 1' 24' 10' 2' 26' 11' 2' 28' 12' 2' 32' 12' 4' * May vary due to pavement width TWO LANE - TWO WAY ROADWAY 50 MPH OR LESS ROADWAY WIDTH LANE WIDTH SHOULDER WIDTH 18' 9' * 0' 20' 10' * 0' 22' 10' 1' 24' 10' 2' 26' 11' 2' 28' 11' 3' 32' 11' 5' * May vary due to pavement width SCHEMATIC OF ROADWAY (NOT TO SCALE) REDLUOHS HTDIW WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE ENAL HTDIW HTDIW CL OF ROADWAY YAWDAOR HTDIW ENAL WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE REDLUOHS HTDIW SHEET NO.
    8
    TWO LANE - TWO WAY ROADWAY - 55 MPH
    ROADWAY WIDTH LA NE WIDTH SHOULDER WIDTH
    18' 9' * 0'
    20' 10' * 0'
    22' 10' 1'
    24' 10' 2'
    26' 11' 2'
    28' 12' 2'
    32' 12' 4'
    * May vary due to pavement width
    TWO LANE - TWO WAY ROADWAY 50 MPH OR LESS
    ROADWAY WIDTH LA NE WIDTH SHOULDER WIDTH
    18' 9' * 0'
    20' 10' * 0'
    22' 10' 1'
    24' 10' 2'
    26' 11' 2'
    28' 11' 3'
    32' 11' 5'
    * May vary due to pavement width
    DIW WHITE LINE WHITE LINE WHITE LINE WHITE LINE HTDIW CL OF ROADWAY
    HTDIW WHITE LINE WHITE LINE WHITE LINE WHITE LINE HTDI

    PROJECT REFERENCE NO. SHEET NO.
    8
    GUIDELINES FOR LANE WIDTHS ON RESURFACING PROJECTS
    Contractor shall place the new pavement markings in accordance with
    this table and detail unless otherwise directed by the Engineer.
    TWO LANE - TWO WAY ROADWAY - 55 MPH
    ROADWAY WIDTH LANE WIDTH SHOULDER WIDTH
    18' 9' * 0'
    20' 10' * 0'
    22' 10' 1'
    24' 10' 2'
    26' 11' 2'
    28' 12' 2'
    32' 12' 4'
    * May vary due to pavement width
    TWO LANE - TWO WAY ROADWAY 50
    MPH OR LESS
    ROADWAY WIDTH LANE WIDTH SHOULDER WIDTH
    18' 9' * 0'
    20' 10' * 0'
    22' 10' 1'
    24' 10' 2'
    26' 11' 2'
    28' 11' 3'
    32' 11' 5'
    * May vary due to pavement width
    SCHEMATIC OF ROADWAY
    (NOT TO SCALE)
    WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE
    WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE WHITE LINE
    REDLUOHS
    ENAL
    ENAL
    REDLUOHS
    HTDIW
    HTDIW
    HTDIW
    HTDIW
    HTDIW
    YAWDAOR
    2017CPT.06.11.10091.1, etc
    CL OF ROADWAY

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Follow Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Active

    VETERANS AFFAIRS, DEPARTMENT OF

    Bid Due: 12/09/2026

    Solicitation Number: 274-ES 2023-05R-3 Project Title: Wake BRT New Bern Avenue Construction Package

    State Government of North Carolina

    Bid Due: 11/16/2026

    CM@R-Public Safety Answering Point (PSAP) 911 Call Center Reference number: COF1517015 Closing date

    City of Fayetteville

    Bid Due: 11/17/2026

    Solicitation Number: 322-MAINT092926 Project Title: RFB FOR PARKING LOT PATCHING, SEALCOATING, AND RESTRIPING

    State Government of North Carolina

    Bid Due: 12/10/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.