UESC Newport, Rhode Island Notice of Intent

Location: Rhode Island
Posted: Dec 10, 2024
Due: Dec 26, 2024
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • 65 - Medical, Dental, and Veterinary Equipment and Supplies
Publication URL: To access bid details, please log in.
Follow
UESC Newport, Rhode Island Notice of Intent
Active
Contract Opportunity
Notice ID
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVFAC
Sub Command
NAVFAC ATLANTIC CMD
Sub Command 2
NAVFAC MID-ATLANTIC
Office
NAVFACSYSCOM MID-ATLANTIC
General Information
  • Contract Opportunity Type: Special Notice (Original)
  • Original Published Date: Dec 10, 2024 02:33 pm EST
  • Original Response Date: Dec 26, 2024 04:30 pm EST
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Jan 10, 2025
  • Initiative:
Classification
  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    Newport , RI 02841
    USA
Description

NOTICE OF INTENT



Newport, Rhode Island



Naval Facilities Engineering Command, Mid-Atlantic intends to award a sole source contract to Rhode Island Energy, under the authority of 10 U.S.C. 2913, which allows agencies to enter into agreements with gas or electric utilities to design and implement cost-effective demand and conservation incentive programs (including energy management services, facilities alterations, installation and maintenance of energy savings devices and technologies by the utilities) in order to address the requirements and circumstances of the installation. This contract is referred to as a Utility Energy Service Contract (UESC). For purposes of qualifying under this notice, an entity must meet the definition of a Utility before an agreement can be initiated.



The proposed procurement is for the evaluation of various Energy Conservation Measures (ECMs) across five (5) installation geographic zones, located within Naval Station Newport, Rhode Island. The primary goal of the subject effort shall be to reduce energy consumption, increase efficiency and to provide more sustainable and resilient facility infrastructure. The Preliminary Audit (PA) shall require on-site survey(s) and investigation of facilities and structures, resulting in energy conservation opportunity findings, and high-level energy analysis recommendations for additional exploration and engineering.



Under the UESC, the Utility will examine facilities for opportunities across all or part(s) of the following installation Zones:





ZONE



DESCRIPTION



BLDGS.



SQ FT



PARKING LOTS



GEN SETS



1



Naval Underseas Warfare Center (NUWC)



74



1,736,164



35



15



2



Coastal Harbors Island (CHI)



86



1,894,021



25



12



3



Coddington Cove (CC)



85



2,042,746



25



12



4



Coddington Point (CP)



73



1,857,046



35



15



7



Naval Hospital / Clinic



72



652,729



17



9



10



SUBSTATIONS



5



1500



1



0







Within and in addition to the above zones, approximately 143 parking lot areas shall be evaluated for constructability of photovoltaic (PV) carports, coupled with facility-scale and utility-scale Long-Duration Energy Storage (LDES) components and Battery Energy Storage Solutions (BESS). All Distributed Energy Resources (DERs) shall be selected and designed for compatibility with installation SCADA systems. Any/all additional renewable electrical generation solution(s) (fuel cells, micro-wind turbines, geothermal, hydrogen, bioenergy, thermal storage, etc.); all available and feasible efficiency measures shall be considered. Renewable generation and storage assets shall be integrated to installation SCADA system under the Naval Station Newport NanoGrid Zone Concept, whereas five (5) small microgrid zones (Zones 1, 2, 3, 4 & 7) shall operate both independently and collectively in a hybrid-mesh architecture.



Additional base-wide ECMs shall be also considered and accepted by the Government for inclusion to scope, such as smart grid (communications, hardware/software and electrical distribution solutions), micro-grid, industrial control systems, SCADA, AMI, energy & water management control infrastructure, equipment and systems, HVAC, boilers, lighting, water, and building envelope improvements. Two large elements shall be available for consideration: Item 1) CHP / electrification under Executive Order 14057 / repair(s) and/or decentralization of prime boiler #4, located in bldg. 7CC (district steam plant). Item 2) Decentralization of Navy Hospital/Clinic A6 boiler plant and renewable microgrid for electrical islanding of NanoGrid Zone 7.



The Government may elect to proceed with future phases under the subject UESC request, to include, but not be limited to, A) the feasibility study; B) the engineering and design phase; and C) the implementation phase. The Preliminary Audit (PA) should be presented as five (5) independent proposals; whereas each proposal shall address facilities, structures and equipment located within corresponding five (5) NanoGrid Zones 1, 2, 3, 4 & 7. The Government and Utility may agree to select all and/or part of each proposal(s) to proceed to engineering and design phase, towards implementation.



The process requires that the responsible Utility have the ability to provide or obtain financing on terms at least as good as those available to customers in a comparable service class or with a comparable risk profile. This contract will not be awarded until the implementation phase. Contractors will not receive compensation until completion of the implementation phase and payments will be based on a long term amortization schedule.



This project will be financed in accordance with 10 U.S.C. 2913. No other type of entity is able to offer financing and the agency is unable to accept financing from any other type of entity. The total amount to be financed for this project is anticipated to be between $25,000,000.00 and $115,000,000.00.



Energy savings will be determined on the basis of methods, agreed to by both parties, prior to ECM implementation. Consumption fluctuations may occur due to factors such as weather variations and changes in energy load due to the addition or removal of ancillary equipment. The contractor shall measure and document ECM performance following installation in accordance with an agreed upon performance assurance plan or measurement and verification plan. The contractor should include in its proposal an option to guarantee savings should to government choose to do so.



Interested parties may identify their interest and ability to meet the requirements stated herein and may submit their corporate capabilities for consideration. The submission must include the DUNs Number and Cage Code. A determination by the Government to compete this proposed contract based upon responses to this notice is solely within the discretion of the Contracting Officer. Responses to this posting must be submitted to Aaliyah Fortson, NAVFAC Mid-Atlantic Contracting Specialist at aaliyah.a.fortson.civ@us.navy.mil no later than 26 December 2024.


Attachments/Links
Contact Information
Contracting Office Address
  • 9324 VIRGINIA AVENUE
  • NORFOLK , VA 23511-0395
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Dec 10, 2024 02:33 pm ESTSpecial Notice (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.