2026 Desktop Calendar

Location: Federal
Posted: Jan 13, 2026
Due: Jan 21, 2026
Agency: U.S. Government Publishing Office
Type of Government: State & Local
Category:
  • 75 - Office Supplies and Devices
Publication URL: To access bid details, please log in.

Program/Jacket Number: 460-129
Title: 2026 Desktop Calendar
Bid Opening Date: January 21, 2026
Contract Type: One-Time Bid
Scope: Desktop day planner pad printed in 4 color process + Spot Varnish, Shrink-wrap in units of 25's. Includes perforation, wire stitching with chipboard and sloth strip, and die cutting.
Quantity: 140000
Ship/Deliver Date: March 20, 2026
GPO Team: MidAtlantic Team
Files: 460-129 Spec

Attachment Preview

460-129 (6-60129)
Specifications by TN
Reviewed by WL
U.S. Government Publishing Office (GPO)
Midatlantic Region
General Terms, Conditions, and Specifications
For the procurement of
2026/2026 DESKTOP CALENDAR
As requested from U.S. Government Publishing Office (GPO) by the
Marine Corps Recruiting Command
Page 1 of 7
BID OPENING: Bids shall be opened virtually at 11:00 AM, Eastern Time (ET), on January 21, 2026, at the
U.S. Government Publishing Office. All parties interested in attending the bid opening shall email bids@gpo.gov
one (1) hour prior to the bid opening date and time to request a Microsoft Teams live stream link. This must be a
separate email from the bid submission. The link will be emailed prior to the bid opening.
For information regarding the solicitation requirements prior to award, please contact Theresa Nagel 757-490-
7940 Ext. 3 or tnagel@gpo.gov.
BID SUBMISSION: Bidders must email bids to bids@gpo.gov for this solicitation. No other method of bid
submission will be accepted at this time. The Jacket Number and bid opening date must be specified in the subject
line of the emailed bid submission. Bids received after the bid opening date and time specified above will not be
considered for award.
Bidders are to fill out, sign/initial, as applicable, Page 7.
ADDITIONAL EMAILED BID SUBMISSION PROVISIONS: The Government will not be responsible for
any failure attributable to the transmission or receipt of the emailed bid including, but not limited to, the
following:
1) Illegibility of bid.
2) Emails over 75 MB may not be received by GPO due to size limitations for receiving emails.
3) The bidder’s email provider may have different size limitations for sending email; however, bidders are
advised not to exceed GPO’s stated limit.
4) When the email bid is received by GPO, it will remain unopened until the specified bid opening time.
Government personnel will not validate receipt of the emailed bid prior to bid opening. GPO will use the
prevailing time (specified as the local time zone) and the exact time that the email is received by GPO’s
email server as the official time stamp for bid receipt at the specified location.
BIDDER’S NAME AND SIGNATURE: Unless specific written exception is taken, the bidder, by signing and
submitting a bid, agrees with and accepts responsibility for all certifications and representations as required by the
solicitation and GPO Contract Terms – Publication 310.2. When responding by email, fill out and return one
completed copy of all applicable pages (pgs. 9) that include the Jacket Number, Bid Price, Additional Rate,
Discounts, Amendments, Bid Acceptance Period, and Bidder’s Name and Signature, including signing where
indicated. Valid electronic signatures will be accepted in accordance with the Uniform Electronic Transactions
Act, § 2. Electronic signatures must be verifiable of the person authorized by the company to sign bids.
OFFERS: Offers must include the cost of all materials and operations for the total quantity ordered in accordance
with these specifications. In addition, a price must be submitted for each additional 1,000 copies. The price for
additional quantities must be based on a continuing run, exclusive of all basic or preliminary charges and will not
be a factor for determination of award.
460-129 (6-60129)
Specifications by TN
Reviewed by WL
Page 2 of 7
GPO CONTRACT TERMS: Any contract which results from this Invitation for Bid will be subject to the
applicable provisions, clauses, and supplemental specifications of GPO Contract Terms (GPO Publication 310.2,
effective December 1, 1987 (Rev. 01-18)) and GPO Contract Terms, Quality Assurance Through Attributes
Program for Printing and Binding (GPO Publication 310.1, effective May 1979 (revised 9-19)).
GPO Contract Terms (GPO Publication 310.2) – https://www.gpo.gov/docs/default-source/forms-and-standards-
files-for-vendors/contractterms2018.pdf
GPO QATAP (GPO Publication 310.1) – https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-
vendors/qatap-rev-09-19.pdf
PREAWARD SURVEY: In order to determine the responsibility of the prime contractor, the Government
reserves the right to conduct an on-site pre-award survey at the contractor's/subcontractor's facility or to require
other evidence of technical, production, managerial, financial, and similar abilities to perform, prior to the award
of a contract. As part of the financial determination, the contractor in line for award may be required to provide
one or more of the following financial documents:
1) Most recent profit and loss statement
2) Most recent balance sheet
3) Statement of cash flows
4) Current official bank statement
5) Current lines of credit (with amounts available)
6) Letter of commitment from paper supplier(s)
The documents will be reviewed to validate that adequate financial resources are available to perform the contract
requirements. Documents submitted will be kept confidential and used only for the determination of responsibility
by the Government. Failure to provide the requested information in the time specified by the Government may
result in the Contracting Officer not having adequate information to reach an affirmative determination of
responsibility.
NOTE: Prior to award the apparent low vendor must be able to show ability to produce the product in question
and may be asked to supply samples of similar items.
PAYMENT: Submitting invoices for payment via the GPO fax gateway (if no samples are required) utilizing the
GPO barcode coversheet program application is the most efficient method of invoicing. Instruction for using this
method can be found at the following web address:
http://winapps.access.gpo.gov/fms/vouchers/barcode/instructions.html
Invoices may also be mailed to: U.S. Government Publishing Office, Office of Financial Management,
Attn: Comptroller, Stop: FMCE, Washington, DC 20401.
For more information about the billing process refer to the General Information of the Office of Finance web page
located at https://www.gpo.gov/how-to-work-with-us/vendors/how-to-get-paid
Vendors are expected to submit invoices within 15 days of job shipping/delivery.
MODS: If any additional costs are incurred during the production of this job due to Government action (i.e.
AAs), contractor is REQUIRED to submit written request to the Printing Specialist for written approval BEFORE
proceeding.
Only a warranted GPO Contracting Officer acting within their appointed limits, has the authority to issue
modifications or otherwise change the terms and conditions of this contract. If an individual other than the GPO
Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed
460-129 (6-60129)
Specifications by TN
Reviewed by WL
Page 3 of 7
with the change and shall immediately notify the GPO Contracting Officer. Proceeding with any work not
authorized by the GPO Contracting Officer will be at the Contractor’s own risk.
SUBCONTRACTING: The predominant production function is printing. Must be printed on a press capable of
printing five units in a single pass. Bidders who must subcontract this operation will be declared non-responsible.
CONTRACTOR TO FURNISH: All materials and operations, other than those listed under "Government to
Furnish," necessary to produce the product in accordance with these specifications.
GOVERNMENT TO FURNISH: Purchase Order and furnished material will be ready to be sent by the award
date and shipping instruction including pallets specs.
PREFLIGHT: Prior to image processing, the contractor shall perform a basic check (preflight) of the furnished
media and publishing files to assure correct output of the required reproduction image. Any errors, media damage,
or data corruption that might interfere with proper file image processing must be reported to tnagel@gpo.gov.
PRODUCT: Desktop day planner pad printed in 4 color process + Spot Varnish, Shrink-wrap in units of 25's.
QUANTITY: 140,000 total Desktop Planner
TITLE: 2026/2027 DESKTOP CALENDAR
TRIM Size:
Day Planner Sheets: 21-3/4 x 15”
Base Sheet: 21-3/4 x 17-3/4”
Chipboard backing: 21-3/4 x 17-3/4”
PAPER:
-Day Planner Sheets:
White Uncoated Text, basis weight: 60 lbs. per 500 sheets, 25 x 38", equal to JCP Code A60.
-Base Sheet:
Litho White Coated One-Side Cover (C1S), 12 pt., equal to JCP Code L70.
-Backing: Chipboard 22pt. Thick.
-Book Cloth Black, 1-5/8” wide strip.
INK: 4 color process plus spot varnish. Must be printed on press minimum of 5 printing units.
MARGINS: Day planner sheets/page, all pages bleed all 4 sides. Base Sheet Bleed 4 sides.
VARNISH: A "low rub" spot varnish required over all full color illustrations and color builds.
Printing: Each day planner sheet (12) and Base sheet prints face only in 4 color process, plus spot vanish. The
Base Sheet prints face only in 4 color process, plus spot vanish at the bottom portion (2-3/4" x 21-3/4").
Format: Day Planner Sheets July 2026 thru June 2027, a 13th sheet (Base Sheet) to be collated in sequence,
padded (top edge) with black book cloth and chipboard backing (22 pt. thick).
Perforation: Day Planner Sheets - Perforate once, with a full horizontal perforation long the
21-3/4" dimension, 3/4" from the top edge.
NOTE: LITHO PERFORATIONS ARE NOT ACCEPTABLE.
460-129 (6-60129)
Specifications by TN
Reviewed by WL
Page 4 of 7
Binding: Trim 4 sides. Collate day planner sheets July 2025 thru June 2026, base sheet and backing chipboard
and bind with four (4) wire stitches @ 7-1/4” center to center and 1/4” center to edge along the 21-3/4 top
dimension, through the sheets and chipboard. After wire stitching, cover along the bind edge with a 1-5/8" X 21-
3/4" strip of black book cloth, lapping equally@ approximately 11/16" over the top sheet and wrapping around
the top edge to lap over the chipboard. Cloth strip must be firmly glued in place.
Die cut four (4) 3/4” slits on the lower right side of the base sheet to house a business card. Follow files for
position.
Apply two (2) 1 x 1” patches of double-sided tape on the chipboard, one patch on the left side @ 1-1/4” from the
left trim edge and one on the right side @ 1-1/4” from the right trim edge. Position both patches approximately
@ 1-1/2” from the bottom.
NOTE: End user will expose double sided tape adhesive and fasten base sheet to backing sheet, after inserting
business card.
PROOF: PDF and Preproduction proof are required.
*PDF Proof:
Contractor to submit one Press Quality PDF soft proof (for content only) using the same Raster Image Processor
(RIP) that will be used to produce the final printed product. PDF proof will be evaluated for text flow, image
position, and color breaks. Proof will not be used for color match. Include REMINDER that agency can keep
proof Two (2) workdays. Date of receipt is NOT considered first workday.
Contractor must call Buffy Torres at 571-559-4424to confirm receipt.
Email PDF to: buffy.torres@wundermanthompson.com and Tnagel@gpo.gov.
After PDF is approved send 1 prior to production proof:
Contractor must supply a proof sign-off sheet and return airbill. Also please include a reminder that the agency
can only keep Samples 2 days.
The Prior to Production Samples must be produced as specified using the format, ink, stock, equipment, and
methods of production that will be used in producing the final product. Do not print the entire quantity until
receipt of the OK from the Government.
Prior to the commencement of production of the contract production quantity, the contractor shall submit samples
to:
2 Samples to:
Buffy Torres
6105 Lakeaires Drive
Cumming, GA 30040
Samples will be tested for conformance of material(s). Sample will be tested for usage on the specified
equipment and/or for construction. The container and accompanying documentation shall be marked
PREPRODUCTION SAMPLES and shall include the GPO jacket, purchase order, and program numbers. The
samples must be submitted in sufficient time to allow Government testing of the samples and production and
shipment in accordance with the shipping schedule. The Government will approve, conditionally approve, or
disapprove the samples within 2 workdays of the receipt thereof. Approval or conditional approval shall not
relieve the contractor from complying with the specifications and all other terms and conditions of the contract. A
conditional approval shall state any further action required by the contractor. A notice of disapproval shall state
the reasons therefor.
If the samples are disapproved by the Government, the Government, at its option, may require the contractor to
submit additional samples for inspection and test, in the time and under the terms and conditions specified in the
460-129 (6-60129)
Specifications by TN
Reviewed by WL
Page 5 of 7
notice of rejection. Such additional samples shall be furnished, and necessary changes made, at no additional cost
to the Government and with no extension in the shipping schedule. The Government will require the time
specified above to inspect and test any additional samples required.
In the event the additional samples are disapproved by the Government, the contractor shall be deemed to have
failed to make delivery within the meaning of the default clause in which event this contract shall be subject to
termination for default, provided however, that the failure of the Government to terminate the contract for default
in such event shall not relieve the contractor of the responsibility to deliver the contract quantities in accordance
with the shipping schedule.
In the event the Government fails to approve, conditionally approve, or disapprove the samples within the time
specified, the Contracting Officer shall automatically extend the shipping schedule in accordance with Contract
Clause 12, "Notice of Compliance With Schedules," of GPO Contract Terms (GPO Publication 310.2, effective
December 1, 1987 (Rev. 01-18)).
Manufacture of the final product prior to approval of the sample submitted is at the contractor’s risk. Samples
will not be returned to the contractor. All costs, including the costs of all samples shall be included in the contract
price for the production quantity.
All samples shall be manufactured at the facilities in which the contract production quantities are to be
manufactured.
BINDING: See description.
Packing: Shrink-wrap in units of 25’s and box per mailing carton. Follow GPO white shipping label. Carton labels
must show title, quantity, form number and control number and must appear on the outside of the mailing and
shipping cartons. Use new corrugated fiberboard for mailing and shipping containers. Shipping containers may
contain more than one mailing carton provided the weight does not exceed 50 Lbs. Use only new corrugated solid
fiberboard containers with minimum bursting strength of 275 p.s.i.
PALLETS/PALLETIZING: Pallets used for delivery to Staci Americas in Suwanee, GA MUST be wood and
have front and rear load beam, with a single (1) 48" long 2 x 4 upright support, centered on the length of the 48"
dimension; this will allow a "fixed-fork unloader/uploader to enter the pallets and place them in the warehouse
racks. Pallets MUST be partially shrink-wrapped, and the size MUST be 48" X 40", with a maximum height of 48".
Cartons MUST be stacked on pallets in a staggered manner to ensure maximum stability.
Pallets shall be suitably packed so as to insure acceptance and safe delivery by common carrier. Maximum gross
weight is 2,000 lbs. Pack flush to corners, top side up, label facing out, without overhang at any edge. Voids must
be to the center of the pallet. Pack with care. Loaded pallets may be stored four high at destination.
Noncompliance with the palletizing specifications may be cause for the Government to reject the shipment at
destination and return it to the contractor at their expense. The Government may, at its option, offer the contractor an
opportunity and a reasonable time to correct, however, the Government may choose to repackage in accordance with
the specifications and charge all costs to the contractor.
NOTE: Pallets are required for all destinations receiving 10 or more shipping containers. Failure to properly
palletize may be cause for re-palletizing at contractor's expense. See GPO Contract Terms.
DEPARTMENTAL RANDOM COPIES (BLUE LABEL): All orders must be divided into equal sublots in
accordance with the chart below. A random copy must be selected from each sublot. Do not choose copies from
the same general area in each sublot. The contractor will be required to certify that the copies were selected as
directed using GPO Form 917 – Certificate of Selection of Random Copies which can be located on GPO.gov.
The random copies constitute a part of the total quantity ordered, and no additional charge will be allowed.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...devices. # Equipment # Description Quantity 1 SYST 1 EEG/Sleep Acq Desktop with ...

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/04/2026

...& Mac), and Mozilla Firefox (Windows & Mac). Enable Javascript Browser cookies Use ...

Niagara Frontier Transportation Authority

Bid Due: 6/12/2026

...; Mac). Enable Javascript Browser cookies Use a desktop or non-mobile device For ...

Niagara Frontier Transportation Authority

Bid Due: 6/16/2026

...& Mac), and Mozilla Firefox (Windows & Mac). Enable Javascript Browser cookies Use ...

Niagara Frontier Transportation Authority

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.