| Location: | North Carolina |
|---|---|
| Posted: | Sep 9, 2025 |
| Due: | Sep 25, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-ES-FO-FY26-MordecaiHVACReplacement-R |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-ES-FO-FY26-MordecaiHVACReplacement-R |
| Project Title: | Mordecai Park HVAC Replacement |
| Description: | The Project consists generally of the following major items: Base Bid: Mordecai House • Replace 12-tons of existing split system heat pump equipment. • Remove existing humidifiers and replace with 2 steam humidification systems. • Provide pre-construction and post-construction test and balance. • Control via local thermostat/humidistat. Add Alternate #1: Mordecai House Duct Work • Replace existing ductwork in Mordecai House basement with new. Add Alternate #2: Post Office • Remove existing 2-ton packaged heat pump and associated ductwork in crawl space. • Provide two new ductless floor mounted fan coils on one heat pump. • Provide post-construction test and balance. • Control via local thermostat. Add Alternate #3: Andrew Johnson house • Remove existing 2.5-ton split system heat pump equipment. • Provide post-construction test and balance. • Control via local thermostat. Add Alternate #4: Old Office • Replace existing 2.5-ton split system heat pump equipment. • Provide post-construction test and balance. • Control via local thermostat. |
| Opening Date: | 9/25/2025 2:00 PM |
| Posted Date: | 9/10/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-FO-FY26-MordecaiHVACReplacement-R
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2025-09-25T14:00:00.0000000
|
Posted Date
*
2025-09-09T21:14:29.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Contact: Tommy.Mangum@raleighnc.gov
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Description
The Project consists generally of the following major items: Base Bid: Mordecai House • Replace 12-tons of existing split system heat pump equipment. • Remove existing humidifiers and replace with 2 steam humidification systems. • Provide pre-construction and post-construction test and balance. • Control via local thermostat/humidistat. Add Alternate #1: Mordecai House Duct Work • Replace existing ductwork in Mordecai House basement with new. Add Alternate #2: Post Office • Remove existing 2-ton packaged heat pump and associated ductwork in crawl space. • Provide two new ductless floor mounted fan coils on one heat pump. • Provide post-construction test and balance. • Control via local thermostat. Add Alternate #3: Andrew Johnson house • Remove existing 2.5-ton split system heat pump equipment. • Provide post-construction test and balance. • Control via local thermostat. Add Alternate #4: Old Office • Replace existing 2.5-ton split system heat pump equipment. • Provide post-construction test and balance. • Control via local thermostat.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can: