Greyhawk Basin Sewer Interceptor

Location: Oklahoma
Posted: Jan 28, 2025
Due: Jan 30, 2025
Agency: Bixby city
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: Greyhawk Basin Sewer Interceptor
Category: Public Works Bids & Quotes
Status: Open
Description:
Advertisement for Bids- Greyhawk Basin Sewer Interceptor for the City of Bixby, OklahomaBid Information

Separate sealed bids for the Greyhawk Basin Sewer Interceptor for the City of Bixby, Oklahoma will be received by the City of Bixby, Oklahoma at City Hall, 116 West Needles, Bixby, Oklahoma 74008, until 2:00 P.M.,January 21, 2025 for furnishing tools, materials and labor, and performing the work necessary to be done in the construction of the above.

All bids that have been duly received will be publicly opened and read aloud by the Director of Public Works, or her designated representative, in the Council Room of the City of Bixby, Oklahoma, at the time and date shown above.

Bid Documents

The information for Bidders, Bid Forms, Contracts, Plans, Specifications, Bond Forms, and other Contract Documents may be examined at the following location:

City of Bixby, Oklahoma, 116 West Needles, Bixby, Oklahoma 74008

An electronic copy may be obtained via email from Gwen Plante at the City of Bixby. If you wish to bid the project, please email Gwen Plante (

For security reasons, you must enable JavaScript to view this E-mail address.) and request a PDF set of the Greyhawk Basin Sewer Interceptor Contract Documents. Alternate delivery arrangements can be made by calling Gwen at 918-366-4430. You must contact Gwen to be placed on the Bidder’s List so the City can ensure you receive all addenda and other pertinent bidding information.Pre-Bid Conference

A non-mandatory Pre-Bid Conference will be held on January 9, 2025, at 10:00 A.M., at the Bixby City Hall, Council Chambers, 116 West Needles, Bixby, Oklahoma 74008.

The Owner reserves the right to waive any informality or to reject any or all bids.

Bid Submissions

The sealed proposal of each bidder shall be accompanied by a Noncollusion Affidavit, Business Relationship Affidavit, Experience, and Equipment Questionnaire, and a Certified or Cashier's Check or Bidder's Surety Bond in the sum of five percent (5%) of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects, or refuses to enter into said contract for the construction of said public improvements for said project, and furnish the necessary bonds within ten (10) days from and after the date the award is made.

Bids received more than ninety-six hours, excluding Saturdays, Sundays and holidays, before the time set for opening of bids, as well as bids received after the time set for opening of bids, will not be considered and will be returned unopened.

Notice

No bidder may withdraw his bid within sixty (60) days after the actual date of the opening.

12/10/2024                                                   M. Beatriz Aamodt

Date                                                                            M. Beatriz Aamodt, PW Director

Addendum #1

January 17, 2025


To: All Bidders


Project: Greyhawk Basin Sewer Interceptor

Subject: Revised Bid Opening Date


This addendum is issued as part of the Contract Documents for this project, and amends

only those items specifically defined herein. This addendum must be attached to the front of your set of Bid Documents.

In preparing bids, the Bidder shall take into consideration the following items.

Information shown herein supersedes requirements issued under previous dates.


Item #1 Revised Bid Opening Date

Bid Opening shall be January 28, 2025 at 2:00PM.

____________________________________________________________


Addendum #2

January 23, 2025


To: All Bidders


Project: Greyhawk Basin Sewer Interceptor

Subject: Revised Attachment A, Plans, and Technical Specifications Updates


This addendum is issued as part of the Contract Documents for this project, and amends only those items specifically defined herein. This addendum must be attached to the front of your set of Bid Documents.


In preparing bids, the Bidder shall take into consideration the following items.

Information shown herein supersedes requirements issued under previous dates.


Item #1 General Conditions

Termination of Contract for Convenience of City clause – see attached


Item #2 Fry Ditch Crossing Modification

Contractor shall bore Fry Ditch. Casing length is extended to 250 linear feet and material shall be C-905 (Welded Poly Pipe) DR17 IPS. An updated Attachment A, dated January 23, 2025, is included.


Item #3 Pipe and Manhole Installation is Complete-in-Place

Installation of pipe and manholes shall be complete-in-place. An updated Attachment A, dated January 23, 2025, is included. All excavation and backfill shall be included in other items of work.


Item #4 Seeding Method A Quantity Adjustment

An updated Attachment A, dated January 23, 2025, is included.


Item #5 Pipe Material Modifications

Pipe between existing manhole "A" and Manhole 1 shall be 24-inch C-905 DR18. Pipe between Manholes 1 and 2 shall be C-905 (Welded Poly Pipe) DR17 IPS.


Item #6 Stub Out Pipe Modifications

  • MH 12: 20 linear feet, 15-inch SDR26 Pipe at 0.17, FL=595.12
  • MH 13: 20 linear feet, 8-inch SDR26 Pipe at 0.40%, FL=599.38 (external drop manhole)
  • MH 14: 20 linear feet, 12-inch SDR26 Pipe at 0.35%, FL=595.64
  • MH 15: 20 linear feet, 8-inch SDR26 Pipe at 0.40%, FL=597.60
  • MH 16: 20 linear feet, 12-inch SD26 Pipe at 0.22%, FL=596.16
  • MH 17: 20 linear feet, 18-inch SDR26 Pipe @ 0.12%, FL=596.31
  • An updated Attachment A, dated January 23, 2025, is included.


Item #7 Manhole Base

Sanitary sewer manholes should include a base 1-foot in diameter greater than the outside diameter of the manhole to set the manhole on.


Item #8 Levee Fence

Contractor shall be responsible for fence along levee. Care shall be taken not to damage fencing. Cost to remove and reinstall shall be included in other items of work.


Item #9 Type A Aggregate Base

Type A Aggregate Base shall be used for backfill in areas under pavement and along levee road (i.e. MHs 2 to 4 and MHs 4 to 22). Cost of backfill material to be included in cost bid for pipe.


____________________________________________________________


Addendum #3

January 24, 2025


To: All Bidders


Project: Greyhawk Basin Sewer Interceptor

Subject: Revised Attachment A, Plans, and Technical Specifications Updates


This addendum is issued as part of the Contract Documents for this project, and amends only those items specifically defined herein. This addendum must be attached to the front of your set of Bid Documents.


In preparing bids, the Bidder shall take into consideration the following items.

Information shown herein supersedes requirements issued under previous dates.


Item #1 Protection of Fencing

Contractor shall protect and replace all removed or damaged fencing with like kind materials. Cost shall be included in cost bid for other items.


Item #2 Clarification of Tree Clearing

All tree clearing and removal necessary for the construction the project, including access, pipe laying, manhole setting, and boring, etc., shall be included in the cost bid for clearing and grubbing. Material shall become the property of the contractor and shall be disposed of in a manner acceptable to the Engineer.


Item #3 Site Visit

Contractor is encouraged to visit the site and understand the project elements necessary prior to bidding project.


Item #4 32-inch Boring Quantity Adjustment

The bore dimension has been updated. A revised plan sheet showing the change has been included with this addendum along with an updated Attachment A, dated January 24, 2025.


____________________________________________________________


Addendum #4

January 27, 2025


To: All Bidders


Project: Greyhawk Basin Sewer Interceptor

Subject: Revised Bid Opening Date & Proposal


This addendum is issued as part of the Contract Documents for this project, and amends only those items specifically defined herein. This addendum must be attached to the front of your set of Bid Documents.


In preparing bids, the Bidder shall take into consideration the following items.

Information shown herein supersedes requirements issued under previous dates.


Item #1 Revised Bid Opening Date

Bid Opening shall be January 30, 2025 at 2:00PM.


Item #2 Proposal

See the attached Proposal to use for the completion of the Bid Packet.


Publication Date/Time:
12/15/2024 8:00 AM
Closing Date/Time:
1/30/2025 2:00 PM
Bid Opening Information:
01/21/2025 at 2:00 PM
Addendum Date/Time:
January 27th
Pre-bid Meeting:
January 9, 2025, at 10:00 A.M.
Contact Person:
Gwen Plante
918-366-4430
GPlante@BixbyOK.Gov
Related Documents:
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project Number - SW-2023-01-03 Project Title - Storm Sewer Replacement at 3939 S. ...

City of Tulsa

Bid Due: 7/10/2026

...Follow CONTRACTOR SHALL FURNISH AND INSTALL SEWER SERVICE LINE FOR SR 6754 IN ...

HEALTH AND HUMAN SERVICES, DEPARTMENT OF

Bid Due: 6/17/2026

...or Services Requested : Topsoil Department: Water & Sewer NIGP Commodity Code(s): 790-70...

City of Tulsa

Bid Due: 7/01/2026

...- NSWWTP Department: Water and Sewer NIGP Commodity Code(s): 988-36 Solicitation Schedule EVENT ...

City of Tulsa

Bid Due: 7/01/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.