Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Project Name LCM Fire Alarm Replacement
Project Location Kent State University
City / County Kent / Portage
Owner
Kent State University
Delivery Method General Contracting
Response Deadline 12/19/2025
12:00pm local time
Project Number
KSU-26S073
Project Manager
Jerry Eveleth
Contracting Authority Local Higher Education
Prevailing Wages State
No. of paper copies requested (stapled, not bound)
0
No. of electronic copies requested (PDF)
1
* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Jerry Eveleth via
https://bidexpress.com. See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Jerry Eveleth at jeveleth@kent.edu with the project number included in
the subject line (no phone calls please). Questions will be answered and posted via https://bidexpress.com on a regular basis
until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A
document.
Interested parties may attend a pre-proposal meeting on Thursday, December 11, 2025 10:00am in Room 102
Harbourt Hall, 615 Loop Road, Kent, Ohio 44242.
Project Overview
A. Project Description
Liquid Crystal Materials (LCM) is an 82,100 square feet fully sprinklered building. It houses the Advanced Materials and
Liquid Crystal Institute and is home to both research and instructional facilities. This project is for a complete replacement
of the Fire Alarm system to include all conduit, wire, devices, permit, inspections, etc. The existing Edwards fire alarm
system is to be completely replaced with a new system including everything required for a complete code compliant
system such as a new Main Fire Alarm Control Panel, flow switches, tamper switches, pull stations, smoke detectors, heat
detectors, duct detectors, and voice addressable notification devices. Once the new system is installed and fully
operational the old system must be completely removed and properly disposed.
B. Scope of Services
For projects advertised with an appropriately developed Program of Requirements (“POR”), upon award of the
Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by
developing the Program of Requirements.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost
components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity
(EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than 4 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
F110-02-2025-OCT
Publish Date: [leave blank]
Page 1 of 4
Request for Qualifications (Registered Design Professional) continued
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Design of Fire Alarm Systems in Higher Education
2. Design of Fire Alarm Systems in Research and Laboratory Spaces
3. Design of Replacement Fire Alarm Systems in Occupied Spaces
4. Design of Projects with Controlling Board and OFCC requirements
C. Estimated Budget / Funding
D. Anticipated Schedule
State Funding:
$345,000
Professional Services Start:
Other Funding:
$0.00
Construction Notice to Proceed:
Construction Cost: $265,000
Substantial Completion of all Work:
Total Project Cost: $345,000
Professional Services Completed:
02 / 26
07 / 26
10 / 26
12 / 26
E. Estimated Basic Fee Range (see note below)
6% to 8%
F. EDGE Participation Goal
Percent of initial Total A/E Fee:
5.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services,
including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for
the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above,
including the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Architecture or Engineering
Secondary
Architecture or Engineering
Disciplines:
H. Additional Service Providers Required
Enter Secondary Discipline
Enter Secondary Discipline
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
• Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
• Previous experience compatible with the proposed project (e.g., type, size).
• Relevant past work of prospective firm’s proposed consultants.
• Past performance of prospective firm and its proposed consultants.
• Qualifications and experience of individuals directly involved with the project.
• Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
• Specification writing credentials and experience.
• Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
• Approach to and success of using partnering and Alternative Dispute Resolution.
F110-02-2025-OCT
Publish Date: [leave blank]
Page 2 of 4
Request for Qualifications (Registered Design Professional) continued
• Proximity of prospective firms to the project site.
• Proposer’s apparent resources and capacity to meet the needs of this project.
• The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business(es), as a part of the A/E’s team. The Intent to Contract and to Perform and / or
waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to
the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent to
Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform form
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in the
delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the
RFQ and your firm’s name, followed by “SOQ”. Use the “print” feature of Adobe Acrobat or similar software for creating a
PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then
PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number
and firm name, followed by “SOQ”.
Facsimile copies of the Statement of Qualifications will not be accepted.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2025-OCT
Publish Date: [leave blank]
Page 3 of 4
Registered Design Professional Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name LCM Fire Alarm Replacement
Project Number KSU-26S073
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 25 miles
25 miles to 50 miles
More than 50 miles
Less than $100,000
$100,000 to $500,000
More than $500,000
Less than 4 professionals
4 to 8 professionals
More than 8 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
b. Proposed EDGE-certified Consultant participation*
Experience / ability of key consultants to
perform effectively and collaboratively
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED** Registered / Certified project experience
c. BIM project experience
d. Team organization
Less than 4 sample projects
4 to 8 sample projects
More than 8 sample projects
Registered LEED v4.0 or v4.1 projects
Certified LEED v4.0 or v4.1 projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 4 projects
4 to 8 projects
More than 8 projects
Performance in completing projects within
original construction budget and schedule
Less than 4 projects
4 to 8 projects
More than 8 projects
Value
5
2
0
2
1
0
1
3
2
Max
=3
0 - 10
0-5
0 - 10
Max
= 20
0-5
0 - 15
0-5
1
2
3
Max
=3
1
Max
2
=2
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
Score
* Must be comprised of registered professional design consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.™
Notes:
Evaluator:
Name
Subtotal
Signature
Date
F110-02-2025-OCT
Publish Date: [leave blank]
Page 4 of 4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.