| Location: | California |
|---|---|
| Posted: | May 7, 2025 |
| Due: | May 21, 2025 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 908736.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | Mid-Wilshire Medical Office Building Seismic Improvements - Phase 2B (BP02A - Demolition) PREQUALIFICATION |
| Project Number | 908736.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents are sought from prospective Demolition subcontractors (hereafter “subcontractors”) for the following project:
Overall Description: The 5 story Medical Office Building (MOB) is located at 5901 West Olympic Boulevard, approximately 6 miles east of the UCLA Campus and is approximately 95,607 GSF. The proposed project would include seismic improvements on all floor levels and interior tenant improvements of approximately 34,000 GSF of space on floors 1-3. The MOB has a current Seismic Performance Rating of V. Upon completion of the work, the MOB would achieve a Seismic Performance Rating of IV or better and bring the facility into compliance with the UC Seismic Safety Policy. The proposed seismic work will include the installation of approximately 34 seismic dampers placed at specified locations on the inside perimeter of the building's exterior walls. The dampers will be installed diagonally and attached at the bottom and top of the existing steel column bays requiring incidental fireproofing at beam and column modifications. Steel reinforcing plates will be added to existing steel beams and columns to support the installation of seismic damper brackets. Additional seismic reinforcing is required at the existing rooftop mechanical penthouse and at the building foundation at locations along the 1st floor seismic dampers. In addition to the seismic work, work would also include partial restoration of interior building finishes impacted by the installation of the seismic braces. Limited MEP investigation and safe-off work is anticipated. Site and building accessibility improvements would include path of travel upgrades along the city sidewalk and building entrance, installation of new ADA handrails and guardrails at existing interior stairs. New accessible signage, restrooms and a drinking fountain are also anticipated. Bid Package 02A: Demolition: The anticipated demolition scope includes demolition of existing doors, frames and hardware, partial demolition of slab for new building utilities and shaft, demolition of existing interior and exterior walls and curtain walls for new doors, miscellaneous interior finish demolition, mechanical demolition, plumbing demolition, electrical demolition, existing fire dry stand pipe, existing fire suppression back-flow preventer demo, existing concrete pavement, planter wall, storage enclosure and miscellaneous site items. The successful bidder’s subcontract will be with Swinerton Builders, Inc., the CM/Contractor on this project. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $450,000.00 |
| 908736.01 |

With GovernmentContracts, you can: