RFQ - Progressive Design-Build Services for the WARC Recovery Center Reconfiguration Project, CP# C90010

Location: Washington
Posted: Mar 3, 2026
Due: Mar 31, 2026
Agency: Thurston County
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Department Description Opening Date Closing Date Attachment(s)
Public Works RFQ - Progressive Design-Build Services for the WARC Recovery Center Reconfiguration Project, CP# C90010 03/03/2026 03/31/2026 at 3PM

Attachment Preview

Request for Qualifications
Progressive Design-Build Services
Thurston County WARC Reconfiguration Project
Submittal Deadline
March 31, 2026, 3:00 PM Pacific Time
Thurston County WARC Reconfiguration Project
CP #C90010
Progressive Design-Build Services
TABLE OF CONTENTS
1.0 INTRODUCTION
3
2.0 PROJECT DESCRIPTION
6
3.0 SCOPE OF PROGRESSIVE DESIGN-BUILD SERVICES
7
4.0 SELECTION AND AWARD PROCESS
8
5.0 EVALUATION CRITERIA
10
6.0 STATEMENT OF QUALIFICATION (SOQ) REQUIREMENTS
10
7.0 REQUEST FOR PROPOSAL RESPONSE
14
8.0 SUBMITTAL REQUIREMENTS
14
9.0 REFERENCE DOCUMENTS
16
10.0 NONDISCRIMINATION
16
11.0 DBE / OMWBE / SMALL BUSINESS OUTREACH
16
12.0 PROTEST PROCEDURE
17
13.0 DESIGN-BUILDER’S RESPONSIBILITY
17
EXHIBITS
A: DRAFT DESIGN-BUILD CONTRACT*
B: DRAFT GENERAL CONDITIONS OF DESIGN-
BUILD CONTRACT BETWEEN OWNER AND DESIGN-BUILDER*
* By Addendum
Thurston County – WARC Reconfiguration Project
RFQ for Progressive Design-Build Services
Page 2 of 17
1.0 INTRODUCTION
1.1 Project Overview and Reason for Using Progressive Design-Build Delivery
The WARC Reconfiguration Project (the ‘Project’) includes design and construction
services to deliver a best value product. Thurston County is planning a reconfiguration and
expansion of its Waste and Recovery Center (WARC) located on a 127-acre closed
County landfill adjacent to Interstate 5, in Lacey, WA. The WARC, which operates as the
main transfer station for the County, accepts municipal solid waste (MSW) from municipal,
commercial, and self-haul (public) customers. The purpose of the project is to relocate
infrastructure from the closed landfill to reduce ongoing maintenance issues, meet
customer growth through the addition of a second transfer station, and increase safety by
separating commercial from self-haul customers.
In accordance with RCW 39.10.300, et seq., the County will utilize a Progressive Design-
Build (PDB) approach for the procurement and delivery of the project, meaning the Design-
Build team (“Team”) will be selected based on qualifications in accordance with evaluation
factors outlined herein. This approach does not require design or a complete project price
proposal during the selection process.
The County fully embraces the principles of collaboration and integrated project delivery
that emphasize a cooperative approach to problem solving. The County expects the
selected Team, as part of the project team, to deliver this project by creating a culture of
open and honest communication and establishing an environment where the Team
contributes its best efforts for the benefit of the project as a whole.
The PDB project delivery method is appropriate for this project because it meets the
following criteria listed in RCW 39.10.300:
The construction activities are highly specialized, operations must be maintained,
and a Design-Build approach is critical in developing the construction
methodology, sequencing and approach;
The project provides opportunity for early collaboration and greater efficiencies
between the designer and the builder; and
Significant savings in project delivery time, as well as transparent pricing, would be
realized.
1.2 Progressive Design-Build Delivery Goals and Objectives
The County is utilizing PDB delivery because of its ability to improve project outcomes,
expedite project delivery and enhance the project delivery experience for all Team
members. To this end, the County has the following expectations of the selected Team:
Maintain a consistent team throughout design & construction.
Embrace a collaborative, integrated team approach with the County, Turner &
Townsend Heery (TTH) and the Team, all focused on the best interest of the
project.
Deliver reliable estimates to help inform the project budget and scope.
Provide high quality design services, including stakeholder engagement, document
development, permitting and construction administration.
Thurston County – WARC Reconfiguration Project
RFQ for Progressive Design-Build Services
Page 3 of 17
Provide high quality pre-construction consulting services, including accurate cost
estimating, phasing, scheduling, and constructability.
Provide design and construction innovations and technology to maximize cost and
schedule efficiency, limit waste, and avoid re-work.
Implement design and construction processes which enhance project safety and
reinforce a goal of zero recordable incidents.
Implement innovative strategies to solicit and manage subcontractor and supplier
bidding to obtain competitive pricing from high quality vendors and achieve MWBE
goals.
Successfully outreach to local, small, minority-owned, and disadvantaged
businesses who can participate during design and construction.
Provide efficient document and workflow management systems, including web-
based collaboration tools to streamline typical project workflows and document
controls.
Provide comprehensive project closeout services, planned well in advance,
including record drawings.
o No significant operational issues arising during commissioning and startup.
o Operational and maintenance requirements of all systems clearly understood
before substantial completion.
o Provide robust training for the County’s staff members and contracted
maintenance team.
1.3 Pre-Proposal Meeting
There will be a non-mandatory pre-proposal meeting for this project on March 17, 2026,
1:00 pm local time. The conference will be held in the Dispatch Room at the Tilley
Campus, located at 9605 Tilley Rd S., Olympia WA 98512. Attendees must check in at
the front desk and will be directed to the conference room location. The particulars of the
project, the selection process, schedule, and the elements of the Contract will be
discussed. The intent of the pre-proposal meeting is to provide clarity surrounding the
requirements of this solicitation.
Questions are encouraged during the meeting, though verbal responses will not be
binding. If clarifications made to the solicitation are deemed material by the County, an
addendum will be issued formalizing such clarifications.
1.4 Expenses of Proposer and Payment of Honorarium
All costs incurred by firms choosing to participate in the Request for Qualifications (RFQ)
portion of this competitive solicitation process shall be the responsibility of the proposing
firms. In accordance with RCW 39.10.330, the County will pay an honorarium in the
amount of two thousand ($2,000) dollars to the short-listed, responsive Finalists selected to
participate in the Request for Proposals (RFP) portion of the solicitation, but who are not
awarded the Design-Build Contract.
Thurston County – WARC Reconfiguration Project
RFQ for Progressive Design-Build Services
Page 4 of 17
1.5 Owner Team
Thurston County Board of
County Commissioners
Thurston County Administration
Leonard Hernandez, County Manager
Jennifer D. Walker, Asst. County Manager
Karen Weiss
Thurston County Public Works
Director
Procurement - As Needed
Design - As Needed
Construction - As Needed
Matt Samuelson
Thurston County Public Works
Capital Projects Manager II
Procurement - 80%
Design - 80%
Construction - 80%
Jeff Bickford
Thurston County Public Works
Solid Waste Division Manager
Procurement - 10%
Design - 25%
Construction - 10%
Gerald Tousley
Thurston County Public Works
Solid Waste Operations Manager
Procurement - 25%
Design -25%
Construction - 50%
Republic Services
Solid Waste
Operations Contractor
Procurement - As Needed
Design - As Needed
Construction - As Needed
Jon Hongladarom
Foster Garvey
GC/CM Legal Council
Procurement - As Needed
Design - As Needed
Construction - As Needed
Dawn Ashton
Thurston County Public Works
Procurement & Contract Specialist
Procurement - As Needed
Design - As Needed
Construction - As Needed
Bill Dobyns
Turner & Townsend Heery
Sr. Project Management Director
Procurement - 25%
Design - 25%
Construction - 25%
Debbie Kim
Turner & Townsend Heery
Construction Manager
Procurement - 25%
Design - 25%
Construction - 50%
TBD
Turner & Townsend Heery
Cost Support
Procurement - As Needed
Design - As Needed
Construction - As Needed
Ryan Asman
BHC Consultants
Solid Waste Subject Matter Expert
Procurement - 10%
Design - 20%
Construction - 20%
Andrea Rutledge
Turner & Townsend Heery
Sr. Project Coordinator
Procurement - 5%
Design - 5%
Construction - 5%
PDB Contractor
TBD
Thurston County – WARC Reconfiguration Project
RFQ for Progressive Design-Build Services
Page 5 of 17
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid No. 31-2526 Madison Elementary, Fieldhouse, and Franklin Park PDB (due: 3:00 PM ...

Spokane Public Schools

Bid Due: 6/23/2026

...and #3. The design build contractor will work closely and collaboratively with the ...

State Government of Washington

Bid Due: 11/23/2026

.../VA area as designated in the Scope of Work dated February 27, 2026. ...

Washington Metropolitan Area Transit Authority

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.