| Location: | Georgia |
|---|---|
| Posted: | Jan 28, 2025 |
| Due: | Feb 13, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77050-NONST-2025-000000019 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77050-NONST-2025-000000019 | South Cobb Water Reclamation Facility Biosolids Thickening System Replacement | Cobb County |
Jan 28, 2025 @ 09:11 AM
|
Feb 13, 2025 @ 12:00 PM
|
Start Date: Jan 28, 2025 @ 09:11 AM ET
End Date:
Feb 13, 2025 @ 12:00 PM ET
Cobb County (¿County¿ or ¿Owner¿) is issuing this solicitation for South Cobb Water Reclamation Facility Biosolids Thickening System Replacement. The Cobb County Water System intends to select a consulting firm to provide professional services for the design and engineering of the replacement of the existing dissolved air flotation tanks (DAFTs) with rotating drum thickeners. The scope of the services will include data collection, preliminary and detailed designs, preparation of permit and bid documents, and assistance during bidding.
| Code | Description |
| 92597 | Water Supply, Treatment, and Distribution Engineering |
| 92596 | Waste Water Treatment Engineering |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
Stephanie Brice
stephanie.brice@cobbcounty.org
770-528-8400

With GovernmentContracts, you can:
...Southern Bulloch County Wastewater and Septage Receiving Project Bulloch County Board Of... Commissioners ...
State Government of Georgia
Bid Due: 9/01/2026
...27-001-MWA - WATER & WASTEWATER CHEMICALS Macon Water Authority Jul 23, 2026 @ ...
State Government of Georgia
Bid Due: 8/18/2026
...27-001-MWA - WATER AND WASTEWATER CHEMICALS INVITATION TO BID MACON WATER AUTHORITY MACON, ...
Macon Water Authority
Bid Due: 8/18/2026
...Close Wastewater Treatment Pond Sludge Removal Richmond Hill, City Of Aug 11, 2026 ...
State Government of Georgia
Bid Due: 9/11/2026