District Attorney/Probation Exterior Paint & Stain

Location: Colorado
Posted: Mar 27, 2026
Due: Apr 22, 2026
Agency: Summit County
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


District Attorney/Probation Exterior Paint & Stain
View RFP

SUMMIT COUNTY FACILITIES MAINTENANCE DEPARTMENT
REQUEST FOR PROPOSAL
DISTRICT ATTORNEY / PROBATION EXTERIOR PAINT AND STAIN

The Summit County Facilities Maintenance Department is seeking proposals from qualified professionals for exterior painting and staining services for office buildings. The best proposal will be selected based on qualifications, relevant experience, schedule, and cost. Submit questions regarding the proposals to wayne.byrne@summitcountyco.gov . The pre-bid meeting for this project is posted on the Summit County website.

Said proposals will be accepted by Electronic Submission (preferred) to wayne.byrne@summitcountyco.gov and kim.weiers@summitcountyco.gov or by hardcopy proposals until 2:00 PM MST/MDT, April 22, 2026.  Proposals received after 2:00 PM MST/MDT, will not be accepted.

At said time and place, all proposals that have been duly received will be publicly opened and read aloud. The Contract will be awarded to the lowest responsible bidder who best meets the requirements of Summit County and the public interest.

The Summit County Board of County Commissioners reserves the right to reject any or all proposals, to waive irregularities or informalities, and to conduct such investigations or negotiations as it deems necessary to select the most responsible and responsive proposal.

Links
RFP
A301 Exterior Elevations
A302 Exterior Elevations

Share this page
Share this page ×

Copy and paste this code into your website.

Your Link Name

Share this page on your favorite Social network

Close

Attachment Preview

FACILITIES MAINTENANCE
970.668.4229 ph
summitcountyco.gov
PO Box 68
Breckenridge, CO 80424
REQUEST FOR PROPOSAL
Bid Number: FM 2026 - 011
DISTRICT ATTORNEY/PROBATION
EXTERIOR PAINT AND STAIN
For Summit County Facilities
PORPOSAL DUE: 04/22/2026
no later than 2:00 PM
REQUEST FOR PROPOSALS
RFP NO.: FM 2026 - 011
PRE-BID MEETING All interested firms are encouraged to attend the pre-bid meeting on April 8,
2026, at 11:00 AM MST/MDT. The meeting will be held in the Mount Royal conference room at the
Summit County Commons, located at 37 Peak One Drive, Frisco, Colorado 80443.
PROPOSALS for Summit County Government will be received no later than April 22, 2026, by 2:00
PM MST/MDT in the Facilities Maintenance Department. Proposals are to be emailed to both
wayne.byrne@summitcountyco.gov and kim.weiers@summitcountyco.gov
Bid opening will be held April 23, 2026, at 10:00 AM MST/MDT in the at the Summit County
Commons, Facilities Department Conference Room located at 37 Peak One Drive, #238, Frisco,
Colorado 80443.
Any questions regarding this Request for Proposal should be directed to Mark Fisher at
mark.fisher@summitcountyco.gov and Wayne Byrne at wayne.byrne@summitcountyco.gov.
All interested firms are invited to submit a proposal in accordance with the terms and conditions stated
in this Request for Proposal.
SUMMIT COUNTY
Wayne Byrne
WAYNE BYRNE
FACILITIES MAINTENANCE DIRECTOR
2|Page
Proposals Due:
04/22/2026 by 2:00 PM MST/MDT
REQUEST FOR PROPOSALS
for
DISTRICT ATTORNEY/PROBATION
EXTERIOR PAINT AND STAIN
03/27/2026
Overview
Summit County Government (“County”) is soliciting bids from qualified contractors to provide services for the
following
SUMMIT COUNTY GOVERNMENT
DISTRICT ATTORNEY/PROBATION
EXTERIOR PAINT AND STAIN
DESCRIPTION OF WORK
General
Summit County Government is planning to have the exterior wood details and trims re-stained and sealed on the
District Attorney and Probation offices. Owners have determined that regular maintenance is required to the
building exterior. Items, materials, and equipment pertaining to this project shall include the following:
A. Areas of Treatment Application
B. Surface Preparations/Acceptable Applications
C. Material Selection/Colors
D. Traffic Control and Barricading
E. Safety
F. Scheduling
G. Submittals
H. Contractor Responsibilities
I. Furnished Items
Location of Work
This project is located at the following address: District Attorney and Probation offices, 504 Noth Park Avenue,
Breckenridge, Breckenridge CO.
Scope Details
The Contractor shall prep, stain, and seal existing exterior facia, timbers, soffit, and wood details on the
District Attorney and Probation offices, as described in the sections below and represented in the supplied
building elevation drawings. The selected contractor shall furnish all labor, equipment, materials, supplies
and other incidentals necessary to provide new stain on areas called out in (RFP) request for proposal
descriptions and supporting documents.
A. Areas of Stain and Sealer Application
Areas called out for new stain application will be reflected in elevation plans provided and area descriptions
with this RFP document. Contractor is expected to perform take-offs for their proposal.
1. All exterior soffit, fascia, and freeze board at all elevations around the facility.
2. All exterior clear wood, to include timber posts and beams, transom above rear door, and other trim
details
3|Page
B. Surface Preparations/Acceptable Applications
1. Surface preparation: All areas to receive new stain applications will be made ready for new stain by
power washing, scraping loose paints/stains and repairing failed caulk systems. Ensuring all wood
surfaces are clean, dry, and free of mildew and loose coatings prior to any applications
2. Acceptable applications: Using a quality nylon/polyester brush, roller, or sprayer (back-brushing
required) 2 coats of new stain on all indicated wood surfaces, no lap marks will be accepted, areas
with lap marks will be required to be re-stained.
a. Temperature shall be 50 degrees and rising
b. Stain shall be allowed to dry prior to second coat applications per manufactures written
instructions
c. Surfaces to be clean and dry prior to stain application
d. No stain to be applied during inclement weather, during rain or snow
e. Care shall be taken to not stain on sun superheated surfaces
C. Material Selection/Colors
1. Sherwin-Williams WoodScapes Exterior Acrylic Solid Stain to be used on all exterior solid stain
wood details being treated for this project, soffits, fascia and freeze boards.
a. Colors to match existing. A 12”x12” color swatch of each color shall be presented for approval
by owner prior to wood treatments being applied.
2. Helmsman satin spar urethane to be used on all clear wood timbers, beams and other trim details
D. Traffic Control and Barricading
1. Mobilization, traffic control and all necessary tools, equipment and labor costs incidental to the
preparation and application of stain and sealer will not be paid for separately but shall be included in
the work. The CONTRACTOR shall provide all lights, signs, barricades, flagmen or other devices
necessary to provide for public safety during the project. Contractor shall also use necessary
barricades, signage, traffic control and other suitable means to protect work during the project.
2. Contractor shall maintain adequate access to building entries, parking lots and travel lanes for public
and employees during the project.
E. Safety
1. Contractors shall conform and adhere to all (OSHA) occupational safety and health administration
guidelines for fall protection while working on elevations any time a worker is exposed to fall hazard
of 6’ or more. For fall hazards 6’ or more, a (PFAS) personal fall arrest system shall be used as
directed by OSAH guidelines
2. All ladders and lifts will be taken down and secured at the end of every shift
F. Scheduling
1. Upon awarded contract, the Contractor and Facilities Department will jointly develop a project
schedule and agree upon that schedule prior to commencement of any work.
2. Any changes to schedule or deadlines will be approved by the Contractor and Facilities Department in
writing.
3. This scope of work is to be completed during business hours, after-hours, Sunday-Saturday and
during the months of May-September.
G. Submittals
4|Page
1. Contractor to provide a submittal of a proposed work schedule and timeline for proposed completion
of project.
2. Contractor to provide submittals and samples of all proposed alternate products for staining and
sealing areas described in RFP.
3. The selected contractor shall provide MSDS sheets on all products to be applied during painting
project.
H. Contractor Responsibilities
1. Contractor is responsible for confirming these measurements, quantities, any additional
measurements, or suggested overage to complete the bid.
2. Scheduling material deliveries, equipment, and personnel is the contractor’s responsibility.
3. Contractor is responsible for all, or any lost material during this project. Including material losses
from weather conditions, traffic delays, broken or failure of application equipment, and staffing
issues.
4. Contractor responsible to protect all infrastructure during project to include but not limited to existing
brick, stone, concrete, roof systems, windows, trims, doors, and landscaping.
5. Contractor is responsible for the post project cleanup of all areas associated with the project.
6. Contractor is responsible for daily cleanup of project and hauling construction debris offsite for
disposal.
7. Contractor responsible to leave Owner a stock of stains/paints from project, labeled for each area and
application they were used.
H. Furnished Items
1. Facilities Department will provide a representative for assistance coordinating project with building
occupants and facility operations.
2. Facilities will assist with creating staging areas for the painting project.
3. To provide unobstructed access to areas requiring painting.
**Contractor to warrant the Project will be constructed in a good and workmanlike manner and
free from defects in material and workmanship for a minimum period of one year following the
date of Substantial Completion.
**If applicable, a 10% retainage will be held till all final inspections are complete and all required
documentation is received by Owner.
Prepared By: Mark Fisher
Date: 03/12/2026
Copies of the request are available at www.SummitCountyCO.gov under ‘Bids & Proposals’ or by request at the
County Facilities Maintenance Department Office. Contact Wayne Byrne Facilities Maintenance Director for
additional project information at 970-668-4230 or wayne.byrne@summitcountyco.gov
***** If required, Contractor will work with the Summit County Sheriff’s Office and shall use the
Criminal Justice Information Systems (CJIS) Vendor Management Program to aid in the
completion and ongoing review of Contractor’s employees’ background checks.
https://www.colorado.gov/pacific/cbi/cjis-vendor-management-program-vendor-instructions.
Contractor is responsible for all costs associated with fingerprint background checks.
Scope of Services
5|Page
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.