| Location: | Arizona |
|---|---|
| Posted: | Mar 30, 2026 |
| Due: | Apr 23, 2026 |
| Agency: | City of Yuma |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-26-200 Main St WTP Filters 9, 10, 11, & 12 Rehabilitation/Upgrades Phase 3 |
| Publication URL: | To access bid details, please log in. |
Project Description: Phase III of the Main Street WTP Filter Rehabilitation & Upgrade includes select demolition of obsolete conduit and wiring, instrumentation and controls, process valves and flow meters, existing underdrain, and filter media; furnishing and installing a new underdrain system compatible with air/water distribution; placing specified media; installing new process valves with actuators, turbidity meters, and a backwash blower with associated piping, foundations, and miscellaneous civil/site repairs; replacing power/conduit and integrating PLC/HMI/SCADA, alarms, and interlocks; maintaining plant operations via filter-by-filter sequencing, temporary isolation, and startup-to-waste; executing QA/QC, testing, and commissioning (underdrain distribution, valve stroke, blower performance, turbidity calibration, and filter run/backwash verification); delivering submittals, as-builts, O&M manuals, and training; and complying with safety, environmental, and regulatory requirements, with a minimum one-year warranty on installed equipment.

With GovernmentContracts, you can:
...of potable water with direct conveyance to the potable distribution system. The AWPF ...
City of Tucson
Bid Due: 6/04/2026
...and renovation projects *Water and wastewater distribution projects *Water and wastewater tank... and ...
Town of Queen Creek
Bid Due: 6/16/2026
...will increase pipeline capacity and centralize wastewater treatment and effluent distribution from... the ...
City of Prescott
Bid Due: 6/11/2026
..., chilled water, and information systems distribution), lighting, vehicle parking, access drives.... Supporting ...
DEPT OF DEFENSE
Bid Due: 6/04/2026