| Location: | Georgia |
|---|---|
| Posted: | Feb 6, 2026 |
| Due: | Mar 24, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66315-NONST-2026-000000020 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66315-NONST-2026-000000020 | RFP NO. 26-007 Progressive Design Build Services for JWSC Water Production SCADA & Electrical Upgrad | Brunswick-Glynn County Joint Water & Sewer Commiss |
Feb 06, 2026 @ 08:56 AM
|
Mar 24, 2026 @ 12:00 PM
|
Start Date: Feb 06, 2026 @ 08:56 AM ET
End Date:
Mar 24, 2026 @ 12:00 PM ET
Brunswick-Glynn Joint Water and Sewer Commission (hereinafter referred to as ¿Owner¿) is soliciting proposals from qualified Progressive Design-Build (PDB) teams for the rehabilitation or replacement of three (3) complete electrical systems at JWSC Water Production Facilities and construction, installation, and programming of nineteen (19) previously designed SCADA remote terminal units (RTUs) at Water Production Facilities and Elevated Storage Tanks throughout Glynn County. This RFP invites interested Proposers to submit their Qualifications and Cost Proposals to perform the work contemplated for the Project. Proposals shall be prepared according to the requirements set forth in this RFP, including the format and content guidelines in Section 5. The Proposals will be reviewed and evaluated using the selection process described in Section 6. The capitalized terms in this RFP have the meanings as first used in the text of this RFP or as defined in Attachment A (Definition of Terms).
The Project is to be designed and constructed in two phases using the progressive Design/Build delivery method:
¿ Phase One: Preliminary Services: Design development, evaluation of alternatives, cost modeling, constructability review, permitting assistance, risk assessment, and development of a Guaranteed Maximum Price (GMP) cost proposal for completion of Phase Two.
¿ Phase Two: Final Design and Construction: Completion of design documents, procurement of equipment and materials, construction, commissioning, and closeout.
The Phase 1 services will be performed under an initial contract. Upon successful negotiation of a GMP, the Owner may execute an amendment for Phase 2 services.
| Code | Description |
| 92596 | Waste Water Treatment Engineering |
| 92597 | Water Supply, Treatment, and Distribution Engineering |
| 96185 | Utility Services, Water |
| 96848 | Inspection Services, Electrical Instrumentation and Control |
Christa Free
cfree@bgjwsc.org
912-261-7144

With GovernmentContracts, you can:
...Sewer Inspection Equipment 89066 Sewer Lift Stations, Including Parts and Accessories 91063 Public... ...
State Government of Georgia
Bid Due: 6/10/2026
...Pre-Advertisement Notice for Annual Sanitary Sewer Repairs Atlanta, City Of May 08, 2026 ...
State Government of Georgia
Bid Due: 6/19/2026
...Equipment 89064 Sewer Inspection Equipment 91187 Storm Drainage 91223 Construction, General: Backfill... and ...
State Government of Georgia
Bid Due: 6/26/2026
...2026-GS-06 Lightning Protection System Inspection and Repair Services Clayton County Water... Authority May ...
State Government of Georgia
Bid Due: 6/03/2026