| Location: | Connecticut |
|---|---|
| Posted: | Jul 16, 2025 |
| Due: | Aug 21, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BI-CTC-692 |
| Publication URL: | To access bid details, please log in. |
Construction of a new dental laboratory at CT State Manchester. Work includes but is not limited to, cutting the floor slab to run new vacuum, water, air and drain lines to (4) dental chairs. Vacuum pump, air compressor, water filter housing and (3) existing dental chairs shall be relocated as part of the GC’s contract from the current dental lab approximately 200 feet from the new space and reinstalled in the new dental lab. The new lab will receive new cabinets and counters, finishes, new electrical and a new closet to house the vacuum and air compressor. Contractor to provide floor protection in any finished areas, especially hallways leading to dumpster and material delivery locations. Slab cutting and other “loud” activities shall be performed after hours, to be coordinated with CT State Staff.
Stephen Burke 61 Woodland Street Hartford CT, 06105 United States Tel: 8607230304 Fax: SBurke@commnet.edu

With GovernmentContracts, you can:
...-013 FILTER MEDIA REPLACEMENT CHARLES B. BACON WATER TREATMENT PLANT Water and Sewer ...
City of Middletown
Bid Due: 9/30/2026
...: 10/7/2026 Follow B027-11 Merimere Liner Replacement Invitation To Bid Water 05586 , ...
City of Meriden
Bid Due: 10/07/2026
...Merimere Liner Replacement The City of Meriden is looking to rehabilitate the Merimere ...
State Government of Connecticut
Bid Due: 10/07/2026