| Location: | California |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Apr 1, 2026 |
| Agency: | City of Vista |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: City of Vista W. Bobier Drive Complete Streets Project (CIP 8374)
Addenda: 0
Release Date: 3/5/2026
Due Date: 4/1/2026
The City of Vista is requesting proposals from teams composed of a qualified engineering firm to provide professional services for design surveying, underground utility survey, geotechnical investigation, engineering, roadway design, construction staking, construction material testing, and construction support for the W. Bobier Drive Complete Streets Project.
The City of Vista received a SANDAG Smart Growth Incentive Program (SGIP) grant for the W. Bobier Drive Complete Streets Project. The project generally consists of a partial road diet and bike lane improvements between Marabou Lane and N. Santa Fe Avenue, construction of roundabouts at W. Knapp Drive and Dorsey Way, along with new pedestrian crossings, raised medians and new street lighting.

With GovernmentContracts, you can:
...Bid Solicitation # UD-26-334 Bid Solicitation # UD-26-334 Organization Name Long Beach Utilities... ...
City of Long Beach
Bid Due: 6/23/2026
...(SWPPP) measures. Construction shall include installation of underground utilities consisting of storm... Project: ...
Sutter County
Bid Due: 7/09/2026
...Status: Open Description: The project includes improvements to numerous existing roads, construction... includes ...
City of Shasta Lake
Bid Due: 6/30/2026
..., utility coordination, and incidentals necessary for the construction of the Traffic Signal ...
City of Desert Hot Springs
Bid Due: 6/25/2026