| Location: | Delaware |
|---|---|
| Posted: | May 18, 2026 |
| Due: | May 25, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W50S6X26Q0003 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***AMENDMENT 02***
The purpose of this amendment is to:
Please see all the attached items and documents for further details.
***AMENDMENT 01***
The purpose of this amendment is to 1) extend the deadline for offer submission, 2) to announce the scheduling of a site visit, 3) to update the RFQ document to exclude GSA language that is no longer compatible with the current solicitation method, and 4) update the listed provisions and clauses document to reflect recent changes to acquisition regulations. The details for each of these items may be found below:
-------------------------------------------
The Government intends to award a single, firm-fixed-price purchase order for one (1) new electric air compressor. This is a commodity procurement where installation and removal services are considered incidental to the purchase. The awarded contractor shall provide all equipment, materials, and labor necessary to deliver, install, test, and dispose of the old unit as specified herein.
CLIN 0001: Electric Air Compressor: 1 EACH
The required specifications for the air compressor are as follows:
- Air Tank Capacity: 240 Gallons - Pressure Rating: 200 Pounds per Square Inch (PSI)
- Power Unit: Dual 25 Horsepower (HP) electric motors
- Electrical System: Three-phase, compatible with 200V or 230/460V
- Required Features:
Automatic tank drain;
low oil control; and
dual controls
CLIN 0002:Installation, Testing, & Removal: 1 JOB
All labor and equipment required for the professional installation and testing of the new compressor (CLIN 0001) and the disconnection and off-site disposal of the existing unit. This includes all necessary personnel, offloading equipment, and adherence to environmental regulations for the disposal of the old unit.
See attached RFQ for full details.
| Apr 21, 2026 | [Solicitation (Original)] W50S6X26Q0003 Electric Air Compressor |
| May 6, 2026 | [Solicitation (Updated)] W50S6X26Q0003 Electric Air Compressor |

With GovernmentContracts, you can: