Clarifications:
1. Could you please clarify if we are permitted to use an electronic signature on the transmittal
letters. Yes, an electronic signature will be accepted.
2. On page 5 of the RFQ, Section 4.i. "Required Contract Revisions" is noted as part of the "4.
Submission Requirements" - could you please clarify if we are required to include the
Required Contract Provisions pages (RFQ pages 23-29) as part of our response
package? Yes, include pages 23-29 with your response package.
3. Regarding the rating sheet provided on page 12 of the RFQ, the scoring criteria includes, "Has
worked on projects that were located in this general region." - Could you please let us know
what qualifies as being in the "general region"? Would maximum points be allocated for
projects only in Calhoun County, or in Texas? The Coastal Region can qualify as general
region. The team rating the RFQs will rate as they see fit.
4. What types of projects does Calhoun County mostly foresee being under this RFQ? Mitigation
projects such as planning efforts or mitigation projects related to upland and coastal
flooding, if not then what types of mitigation projects might be most expected? Disaster
recovery projects for housing and commercial facilities, economic revitalization, planning, or
infrastructure such as roadways, bridges, and coastal structures? For disaster recovery
projects, which are most likely anticipated? At this time, we have no anticipated projects.
The RFQ is to have an Engineer/Architect/Surveyor preselected to expedite any future
CDBG projects.
5. On page 4 of the RFQ it breaks the work “Pre-Funding services” defined as assist with the
develop of grant applications as necessary.” “Post-Funding Services” defined as “Initial
Engineering and Design Support, Engineering and Final Design Support, Bid and Award
Support, Contract Management and Construction Oversight, Specialized Services, Specify
actual tasks to be performed under each of these categories in your response”. Additionally,
there is a note that Pre-Funding services are/may not be eligible”. What does the note stating
that “Pre-funding services are/may not be eligible mean? The sentence *Pre-funding
services are/may not be eligible* should say *Pre-funding services may or may not be
eligible for reimbursement through the grant.
Page 2 of 5
6. On Page 8 of the RFQ under the provided GLO Scope of Work under Initial Engineering Design
and Support item a states “Assist with the development of grant applications, including, but
not limited to cost estimates, preparation of project justification, project maps and accurate
project descriptions. Under the details of question 5, these services are defined as being
separate. Are the Pre-Funding services separate or are they considered under the Initial
Engineering and Design Support? Pre-funding services are considered under the Initial
Engineering Design & Support.
7. The RFQ on page 3 says “Engineering Service Providers may submit proposal for any and all
activities listed in the attached scope of work.” The example scope of work on page 8 states
“Respondents will be required to show the ability to provide all the Engineering services
described below”. The services include:
• Initial Engineering and Design Support
• Pre-funding services – assist with the development of the grant
• Engineering and Final Design Support
• Bid and Award Support
• Construction Management and Oversight
Does this mean that the Provider may exclude an item above such as the pre-funding
services under the initial engineering and design support or instead exclude construction
management and oversight? Or does this mean that the provider may submit a proposal for
just non-housing projects disregarding housing related projects? You may exclude any
services that you cannot provide.
8. On pdf page 4 of the RFQ the provider needs to show under Item 2a) “Public works
construction” and 2b) “Federally funded construction projects”, does this mean that
supporting projects must include bid support and construction
management/administration or can the provider supply projects that include bid support
construction management/administration as well as design up to 100% bid ready
documents to show qualifications? You can supply projects that include bid support
construction management/administration as well as design up to 100% bid ready
documents to show qualifications.
Page 3 of 5
To acknowledge receipt of Addendum No. 2:
1. Sign and date on page 5
2. Return with your bid package
If proposals have already been submitted, additional documentation may be submitted
and all documents will be reviewed when scoring.
*Due Date for RFQ Submissions remains Thursday, June 4, 2026 at 2:00:00 PM as stated in
Addendum No. 1.
Page 4 of 5
ACKNOWLEDGEMENT OF ADDENDUM NO. 2
The undersigned affirms that they are duly authorized to acknowledge receipt of
Addendum No. 2 to RFQ 2026.09 CDBG Grant Engineering/Architectural/Surveying
Services.
The undersigned affirms that Addendum No. 2 to the RFQ 2026.09 has been incorporated
into their proposals.
_____________________________________________________________________________________
Company Name
____________________________________________________________________________________
Authorized Signature
Title of Authorized Signature
____________________________________________________________________________________
Printed Name of Authorized Signature
Date
Page 5 of 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.